What is the fewest number of workstations required

Assignment Help Operation Management
Reference no: EM13193163

Question 1:

The Terminal Company is attempting to balance its assembly line of high-voltage electrical connectors. The desired output for the line is 50 connectors per hour, and the information on the work elements for this assembly line is as follows.

Work

Elements

Time (sec)

Immediate Predecessor(s)

A

40

--

B

36

A

C

20

A

D

25

A

E

30

B, C

F

34

D

G

35

E

H

 5

F

I

15

E, H

J

40

H

K

38

G, I, J

Use the information from Table 7.15 to balance this line. What is the most efficient solution?

Question 2

The Terminal Company is attempting to balance its assembly line of high-voltage electrical connectors. The desired output for the line is 50 connectors per hour, and the information on the work elements for this assembly line is as follows.

Work

Elements

Time (sec)

Immediate Predecessor(s)

A

40

--

B

36

A

C

20

A

D

25

A

E

30

B, C

F

34

D

G

35

E

H

 5

F

I

15

E, H

J

40

H

K

38

G, I, J


----------------------------------------------------------------------------------

 Use the information from Table 7.15 and the most efficient line balance possible. What work elements are included in the first station?

Question 3

The Terminal Company is attempting to balance its assembly line of high-voltage electrical connectors. The desired output for the line is 50 connectors per hour, and the information on the work elements for this assembly line is as follows.

Work

Elements

Time (sec)

Immediate Predecessor(s)

A

40

--

B

36

A

C

20

A

D

25

A

E

30

B, C

F

34

D

G

35

E

H

 5

F

I

15

E, H

J

40

H

K

38

G, I, J


----------------------------------------------------------------------------------

Use the information from Table 7.15, and assume that the most efficient line balance possible ha been achieved. What is the total idle time for an eight hour work day? 

Question 4

  1. 112. The production of a particular product consists of the following work elements. If the cycle time is 4 minutes and the work-element times are as follows, what is the theoretical minimum number of stations?

Work 

Time (min)

Element

1

2.4

2

0.5

3

2.1

4

2

5

2.7

6

1.1

7

2

8

2.7

9

1.6

10

1.4

   Question 5

  1.  Fun Vehicles, Inc. makes beach buggies on an assembly line. The total productive time to make one buggy is 300 seconds. The current line has a 90-second cycle time and consists of four workstations. The balance delay of this line must be

Question 6

An assembly line has to perform 10 work elements, whose time requirements follow. An operations analyst has found a solution using some heuristics, as shown in the table. If the cycle time of the line is 90 seconds, what is the efficiency of the assembly line?

 

 

Solution

Work

Elements

Time (sec)

 

Station

Work Elements Assigned

A

45

1

A, B, C

B

30

2

D, E

C

15

3

F, H

D

30

4

G, I

E

50

5

J

F

40

 

 

G

30

 

 

H

30

 

 

I

60

 

 

J

80

 

 

Question 7

  1. Table 7.13

The following information is given about an assembly line. The desired output rate is 90 units per hour.

Work

Element

Time

 (sec)

Immediate

Predecessor(s)

A

10

--

B

6

A

C

15

A

D

20

B

E

12

B

F

14

C, E

G

8

D

H

20

F, G

----------------------------------------------------------------------------------------

Use the information in Table 7.13. What is the fewest number of workstations that you need?

Question 8

The following information is given about an assembly line. The desired output rate is 90 units per hour.

Work

Element

Time

 (sec)

Immediate

Predecessor(s)

A

10

--

B

6

A

C

15

A

D

20

B

E

12

B

F

14

C, E

G

8

D

H

20

F, G

 
------------------------------------------------------------------------------------------

Use the information in Table 7.13. Suppose that the desired output rate is increased to 120 units per hour and a solution has been found that has four workstations. What is the efficiency of this new assembly line?

Question 9

A company makes four products that have the following characteristics: Product A sells for $75 but needs $20 of materials and $20 of labor to produce; Product B sells for $90 but needs $45 of materials and $20 of labor to produce; Product C sells for $110 but needs $50 of materials and $30 of labor to produce; Product D sells for $135 but needs $75 of materials and $40 of labor to produce. The processing requirements for each product on each of the four machines are shown in the table.

 

Processing Time (min/unit)

Work Center

A

B

C

D

W

8

4

12

10

X

12

9

10

6

Y

8

12

14

5

Z

10

9

5

5

Work centers W, X, Y, and Z are available for 40 hours per week and have no setup time when switching between products. Market demand is 50 As, 60 Bs, 70 Cs, and 80 Ds per week. In the questions that follow, the traditional method refers to maximizing the contribution margin per unit for each product, and the bottleneck method refers to maximizing the contribution margin per minute at the bottleneck for each product.

Question 10

A company makes four products that have the following characteristics: Product A sells for $75 but needs $20 of materials and $20 of labor to produce; Product B sells for $90 but needs $45 of materials and $20 of labor to produce; Product C sells for $110 but needs $50 of materials and $30 of labor to produce; Product D sells for $135 but needs $75 of materials and $40 of labor to produce. The processing requirements for each product on each of the four machines are shown in the table.

 

Processing Time (min/unit)

Work Center

A

B

C

D

W

8

4

12

10

X

12

9

10

6

Y

8

12

14

5

Z

10

9

5

5

Work centers W, X, Y, and Z are available for 40 hours per week and have no setup time when switching between products. Market demand is 50 As, 60 Bs, 70 Cs, and 80 Ds per week. In the questions that follow, the traditional method refers to maximizing the contribution margin per unit for each product, and the bottleneck method refers to maximizing the contribution margin per minute at the bottleneck for each product.

Reference no: EM13193163

Questions Cloud

Calculate a vertical angle made by the ladder : a ladder leans against a vertical wall.if the foot of the ladders is 10m away from the wall and the height of the wall is 12m. calculate i) a vertical angle made by the ladder. ii) the length of the ladder.
State how many grams of isopentyl acetate : began with 81.0 mmol of isopentyl alcohol, how many grams of isopentyl acetate could you theoretically produced assuming only 65.0% attainable yield?
Which mover provides a better deal for 2 hours of work : Which mover provides a better deal for 2 hours of work? How did you arrive at your answer?
Price of your bond : "Bennifer Jewelers recently issued ten year bonds that make annual interest payments of $50. Suppose you purchased one of these bonds at par value when it was issued. Right away, market interest rates jump, and the YTM on your bond rose to 6 percent...
What is the fewest number of workstations required : Bottleneck method refers to maximizing the contribution margin per minute at the bottleneck for each product and what is the fewest number of workstations that you need?
What should the overall length and width be : Carl wants to construct three rectangular dog-trainig arenas side-by-side, as shown, using a total of 340 feet of fencing. What should the overall length and width be in order to maximize the area of the three combined arenas?
What net force is exerted on the ship : Two tugboats are towing a ship. each exerts a horizontal force of 5 tons and the angle between their tow ropes is 90. what net force is exerted on the ship?
S900: team development : S900: Team Development please write 1000 words,  Describe the work processes and responsibilities for which the team was formed. Critically discuss the characteristics that the ideal team would need to exhibit and the processes it would need to imple..
Define glycolysis pathway catalyze irreversible reactions : Which enzymes of the glycolysis pathway catalyze irreversible reactions

Reviews

Write a Review

Operation Management Questions & Answers

  Define cultural products and give three examples of them

Define cultural products, and give three examples of them. Identify how cultural products are considered in the development of a strategic plan.

  Calculate average inventory level

Custom Computers, Inc. assembles custom home computer systems. The fan assemblies needed are bought for $24 each and are ordered in quantities of 1500 units.

  Evaluate panera bread strategy and effectiveness

Evaluate Panera Bread's strategy and its effectiveness with executing the strategy within the competitive fast-casual restaurant marketplace.

  Explain how much could the industry save annually

Currently the manager orders once a month. Explain how much could the industry save annually in ordering also carrying costs by utilizing the EOQ.

  Define managerial epidemiology

In your own words, define managerial epidemiology and address the significance of using epidemiology principles and tools while making administrative decisions.

  Explain the problems of homelessness

Explain the problems of homelessness based upon the developmental, situational, and human needs perspectives

  Evaluate primary levels of union management decision making

Evaluate one or two of the three primary levels of union-management decision making. Include the following: can this level be improved, and if so, how?

  What is the minimum cycle time

What is the minimum cycle time? What is the maximum c ycle time? What is the calculated cycle time? What is the minimum number of stations needed? Show work on scanned sheet.

  Illustrate what are characteristics of a prudent performance

Discuss also elaborate factors to be considered for establishment of a prudent Performance Management System for an organization going for global market place.

  Illustrate what would you do as the new ceo to restore

Illustrate what would you do as the NEW CEO to restore the organization to a consistently profitable position. Consider specifically the possible role "contingency variables" also the "learning organization concept" might play in your actions.

  Identify elements of nissan altima value chain

Identify elements of Nissan Altima value chain. Where can information be used to decrease costs or increase customer satisfaction or both? Explain.

  When applied to non-management employees

When applied to non-management employees, which of these has a relatively WEAK connection between the reward and individual effort?

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd