What is the expected breakdown cost per week

Assignment Help Operation Management
Reference no: EM13225797

Question 1

Ten high-technology batteries are tested for 200 hours each. One failed at 20 hours; all others completed the test. FR(%) is ________ and MTBF is ________.

10%; 1/1820

90%; 1/1820

10%; 1820 hours

10%; 1980 hours

Question 2

A product has three components, A, B, and C, with reliabilities of 0.95, 0.98, and 0.995. Engineers intend to put a redundant component A that has reliability 0.70. With this change, system reliability will

fall by 20%

fall by 10% or less

rise

cannot determine from the information provided.

Question 3

What is the reliability of the three components connected in series shown below?

837_What is the expected number of breakdowns per week.png

0.799425

0.85

0.91333

0.95000

Question 4

DuLarge Marine manufactures diesel engines for shrimp trawlers and other small commercial boats. One of their CNC machines has caused several problems. Over the past 30 weeks, the machine has broken down as indicated below.

Number of breakdowns per week

0

1

2

3

4

Frequency (Number of weeks that breakdowns occurred)

8

3

5

9

5


What is the expected number of breakdowns per week?

1

2

6

10

Question 5

DuLarge Marine manufactures diesel engines for shrimp trawlers and other small commercial boats. One of their CNC machines has caused several problems. Over the past 30 weeks, the machine has broken down as indicated below. Each time the machine breaks down, the firm loses an average of $3,000 in time and repair expenses.

Number of breakdowns per week

0

1

2

3

4

Frequency (Number of weeks that breakdowns occurred)

8

3

5

9

5


What is the expected breakdown cost per week?

$1000

$2000

$6000

$10000

Question 6

DuLarge Marine manufactures diesel engines for shrimp trawlers and other small commercial boats. One of their CNC machines has caused several problems. Over the past 30 weeks, the machine has broken down as indicated below. Each time the machine breaks down, the firm loses an average of $3,000 in time and repair expenses. If preventive maintenance were implemented, it is estimated that an average of only one breakdown per week would occur. The cost of preventive maintenance is $1,000 per week.

What is the weekly total maintenance cost of this program?

Number of breakdowns per week

0

1

2

3

4

Frequency (Number of weeks that breakdowns occurred)

8

3

5

9

5

$1000
$3000
$4000
$6000

Question 7

Century Digital Phone advertises phone battery life (on standby) of up to three days. The standard deviation is thought to be five hours. Tina Talbot, an employee at CDP, tested 10 of these batteries for 72 hours. One failed at 40 hours; one failed at 62 hours; one failed at 70 hours. All others completed the test. FR(%), FR(N), and MTBF are ___ , ___ , ___ , respectively:

30%, 0.09112, 296.2 hrs

33%, 0.0633, 218.2 hrs

30%, 0.005444, 118 hrs

30%, 0.00444, 225.3 hrs

Question 8

1. The Everstart is a battery with an intended design life of 72 months. Stephanie Bradley recently put five of these batteries through accelerated testing (the company couldn't wait six years) to simulate failure patterns. The test results had one failure at 26 months, one failure at 32 months, one failure at 50 months, and one failure at 62 months. FR(%), FR(N), and MTBF are ___ , ___ , ___ respectively.

76%, 0.0193, 53.5

80%, 0.0215, 60.5

80%, 0.0165, 60.5

80%, 0.0165, 82.3

Question 9

1. 1. The academic service commonly referred to as "registration" consists of several smaller components: advising, registration for courses, fee assessment, financial aid calculations, and fee payment. Each of these modules operates independently and has some probability of failure for each student. If the five probabilities which accompany these services are 95%, 90%, 99%, 98%, and 99%, what is the "reliability" of the entire product from the student's perspective-the probability that all five will work according to plan?

0.89126

0.82123

0.73491

0.71121

Question 10

A product has four components A, B, C, and D. The finished product must have a reliability of .95. The first three components come from a supplier, and have reliabilities of .99, .98, and .995. The fourth component is being designed now. What must the reliability of component D be in order to meet the product reliability condition?

0.9518

0.9612

0.9732

0.9841

Reference no: EM13225797

Questions Cloud

Calculate the velocity of the holes and electrons : (a) Calculate the velocity of the holes and electrons in this material. (b) What doping level is necessary to provide a current density of 2 mA/micrometer^2 under these conditions? Assume the hole current is negligible.
Reasons for the failure of the people''s party : All of the following were reasons for the failure of the People's (Populist) party EXCEPT
Explain the number of anti-bonding interfaces in arrangement : There are four possible p orbital arrangements for the butadiene molecule. Which of the following statements about these orbitals is not correct? A) The four arrangements differ by the number of anti-bonding interfaces in each arrangement.
What would be expect the voltage from the negative terminal : An otherwise-ideal op amp, known to have an open loop gain of 10^4 V/V , is measured in a circuit to have an output voltage of -3 V. While it would be difficult to measure, what would you expect the voltage from the negative terminal
What is the expected breakdown cost per week : What is the expected number of breakdowns per week and What is the expected breakdown cost per week - What is the weekly total maintenance cost of this program
State oordination number size and the oxidation state : In deoxyhemoglobin, Iron atom lies ~0.36 to 0.40 out of the plane of the heme group whereas in oxyhemoglobin it lies of the porphyrine plane. Give reason for this behavious. Talk in terms of coordination number, size and the oxidation state of the..
How many items need to be counted each day : She would like to set up a system in which all A items are counted monthly (every 22 working days), all B items are counted quarterly (every 60 working days) and all C items are counted semiannually (every 120 working days). How many items need to..
Rapid growth of near monies had for monetary policy : What possible implicationhas the rapid growth of near monies had for monetary policy? What's some implications of contemporaneous reserve requirements (crr) for monetary policy ?
What are the differences between the external factors : Provide some examples of how this might impact team performance. What should a supervisor do to minimize the influence of external factors on team performance?

Reviews

Write a Review

Operation Management Questions & Answers

  Creating final analysis of risk

Three siblings want to take their families (spouses plus a total of 7 children ages 2-15) on a trip, Cruise from Glasgow to the Northern Isles and to Ireland

  Why did the lrc decide that ras and cdas were employees

With respect to the product decision, managers must be able to accept risk and tolerate failure. Why did the LRC decide that RAs and CDAs were employees. Do you agree with the LRC decision.

  Justify implementing a new collaborative planning process

Identify possible constraints the hospital may experience in its supply chains. Describe the potential effect of implementing a new collaborative planning process. Justify implementing a new collaborative planning process.

  Bottlenecks govern throughput and inventory in system

Choose one of the rules of constraint/bottleneck management listed below (as demonstrated in the storyline of The Goal) and briefly discuss the concept as related to the diagram of the layout of a dentist's office shown on the diagram here.

  Compute average cycle time also normal time for each element

Compute average cycle time also normal time for each element. Then, calculate standard time for entire task. Decision Science Institute (DSI) promotes its annual national conference by mailing thousands of letters to various recipients.

  Management believes that they can increase the price

Management believes that they can increase the price per hour by 10 percent in this new situation and improve profits by 10 percent, but the sales department cautions that the price increase may decrease sales by 15 percent

  Illustrate what is the time between orders

Given the EOQ, explain how many orders would be made each year. Illustrate what would be the annual order cost. Illustrate what is the time between orders.

  Discuss how technological innovation change organization

Based on your personal and professions experience, provide examples and discuss how technological innovation resulted in change within your organization.

  What types of law will veronica''s lawsuit involve

Without trying to decide who will win if Veronica sues Fun Products, Inc. and the Milton Hotel chain, analyze the following: Who are the parties to this lawsuit, and what are they called (trial level and appeal level)?

  Which of the subsequent best explains this scenario

It turned out to be the right thing to do as Austin was never late to work after the incident. Which of the subsequent best explains this scenario.

  What is the critical path for this network

What is the critical path for this network? Show the activity schedule for this project. The park commissioner would like to open the park to the public within six months from the time the work on the project is started.

  Evaluate the performance of the two suppliers

Which supplier should the CEO go with? CCS has a holding cost of 30%. It currently uses a continuous review policy for managing inventory and aims for a cycle service level of 95%. Weekly demand has a mean of 1000 and a standard deviation of 300.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd