What is the economic production quantity

Assignment Help Operation Management
Reference no: EM13230114

Race One Motors is an Indonesian car manufacturer. At its largest manufacturing facility, in Jakarta, the company produces subcomponents at a rate of 300 per day, and it uses these subcomponets at a rate of 12,500 per year (of 250 working days). Holding costs are $2 per item per year, and ordering costs are $30 per order.

a) What is the economic production quantity?

b) How many production runs per year will be made?

c) What will be the maximum inventory level?

d) What percentage of time will the facility be producing components?

e) What is the annual cost of ordering and holding inventory?

 

Reference no: EM13230114

Questions Cloud

Compute the multifactor productivity under each system : Compute the multifactor productivity under each system. Use carts per dollar cost (labor plus equipment) as the measure. (Round your answers to 2 decimal places.)
Create an application that displays total no of customers : Joe also performs other nonroutine services and charges for parts and labor ($20 per hour). Create an application that displays the total for a customer's visit to Joe's.
Discuss the points and tabulate the strengths and weaknesses : Discuss the points and tabulate the strengths and weaknesses
What is the average time a car is in the system : Automobiles arrive at the drive-through window at the downtown Urbana, Illinois, post office at the rate of 4 every 10 minutes. The average service time is 2 minutes. The Poisson distribution is appropriate for the arrival rate and service times a..
What is the economic production quantity : At its largest manufacturing facility, in Jakarta, the company produces subcomponents at a rate of 300 per day, and it uses these subcomponets at a rate of 12,500 per year (of 250 working days). Holding costs are $2 per item per year, and ordering..
What is the reflection coefficient away from the load : A terminated transmission line with Z0 = 60 ohm has a reflection coefficient at the load of = 0.4 60. (a) What is the load impedance (b) What is the reflection coefficient 0.3 away from the load (c) What is the input impedance at this point
The evolution of e-marketing tools : The Evolution of E-Marketing Tools
What is the probability of processing bills within 4 hours : With the new system, what is the probability of processing the bills within 4 hours?
Find line and load voltages n turns ratio and total apparent : A ideal transformer is rated at 4800/480 volt, at 75KVA. it is connected as a step down auto transformer. find the line and load voltages, turns ratio and total apparent, real and reactive power at full load and at 60% rated load at a power factor..

Reviews

Write a Review

Operation Management Questions & Answers

  What are the next three stages

It is generally agreed that HR planning involves four distinct phases or stages, the first being situation analysis or environmental scanning. What are the next three stages?

  Why is it important to have well-documented

Why is it important to have well-documented, evidence-based processes and tools in place for regularly measuring performance in patient care and services?

  What is the role of inventory management

What is the Role of Inventory Management in Ford Motor Company's Production Line. Discuss with examples pertaining to Operations Management and Operations Management perspectives. (1500 -2000 words)

  Finding horizon value

Current and projected cash flows for Randell Global Operatons are shown below. Growth is expected to be constant after 2012, and the weighted average cost of capital is 11%.

  Calculate loan and lease payment

Sutton Corporation, which has a zero tax rate due to tax loss carry-forwards, is considering a 5-year, $6,000,000 bank loan to finance service equipment.

  What differences exist in their operations strategies

What differences exist in their operations strategies and decisions?

  Calculate the net requirements and planned order

Initially, assume that Phil wants to minimize his inventory requirements. Assume that each order will be only for what is required for a single period. Using the following forms, calculate the net requirements and planned order release for the gea..

  A work cell is required to make eighty computerized

A work cell is required to make 80 computerized diagnostic assemblies (for installation into hybrid automobiles) each day. The cell currently works an eight hour shift, of which seven hours is available for productive work

  Prepare efe and cpm matrixes for disneys parks

Prepare EFE and CPM matrixes for Disney's Parks and Resorts division. Use Universal Studios and Six Flags for competitors in the CPM.

  How many machining centers must be devoted to widget

How many machining centers must be devoted to widget production during the given week, if there are 90 hours of available time on each machining center?

  Calculating mean absolute deviation

Since May of 2005, the purchase manager at a department store has been using a 4-period moving average to forecast sales in upcoming months.

  How operations strategy evolved in the automobile industry

Toyota is known for its innovative operations management practices. Over the last three decades Toyota has received many awards for their excellent quality and performance.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd