Reference no: EM131371074
The Epic Company manufactures Part No. RPN2322 for use in continuous assembly elsewhere in the firm. When parts are being run, deliveries are made to the assembly area; otherwise, the assembly department draws parts from inventory. The data below are for RPN2322.
Production rate = 600 pieces per day
Number needed by Assembly = 270 pieces per day
Inventory Holding Cost = $5.00 per unit per year
Set-up Cost = $250 per batch produced
Company operates only 340 days per year
Use this information to answer the following questions. You must show your work to receive credit on the assignment.
a. What is the economic Production Order Quantity (POQ) for this item?
(Round number to nearest whole number)
b. To what level will inventory build for this item (Imax)?
c. How many days is RPN2322 in production during each production cycle?
d. How long does inventory last once the production of RPN2322 stops?
e. What is the total number of days between orders?
f. During each production cycle, how many units are used directly by the assembly department without incurring inventory charges?
g. What is the total annual inventory cost for this item?
Discuss about the post given below
: In the legal writing process, research is important. However, you should always have your end goal in mind. In many situations, the research will be used as the basis for a memorandum or brief. Therefore, you need to be able to use the information..
|
Test for statistical control of the process mean
: The following data are tensile strengths, in pounds, for a sample of string for industrial use made at a plant. Construct a control chart for the mean, using groups of 5 observations each.
|
Identify the source of inefficiency of medical care
: Raymond, a 78-year-old man living in a motel, is found by the housekeeper lying on the floor of his room, semiconscious. The motel manager calls 911, and Raymond is taken to the closest emergency room, where he lies on a gurney in the hallway for 6 h..
|
Probability that a given error will be between -2 and 2
: A sensitive measuring device is calibrated so that errors in the measurements it provides are normally distributed with mean 0 and variance 1.00.- Find the probability that a given error will be between -2 and 2.
|
What is the economic production order quantity
: The Epic Company manufactures Part No. RPN2322 for use in continuous assembly elsewhere in the firm. When parts are being run, deliveries are made to the assembly area; otherwise, the assembly department draws parts from inventory. What is the econom..
|
Probability that standard normal random variable above 0.85
: Is it likely that a standard normal random variable will have a value less than -4? Explain.- Find a value such that the probability that the standard normal random variable will be above it is 0.85.
|
Why do we need a control chart for the process range
: Compare and contrast the control charts for the process range and the process standard deviation.
|
Define the issues in the real-world scenario
: As much as possible, in this course you'll be completing work that you might actually do as a paralegal. For this assignment, you'll be given a real-world scenario and you'll have to a complete memorandum of law. Again, this is the sort of task ..
|
Calculate ending balance of the operating overhead account
: Determine the cost of each job. Indicate the balance of the Service Contracts in Process account at the end of November. Calculate the ending balance of the Operating Overhead account for November.
|