CASE: Designing Toshiba's Notebook Computer Assembly Line

Toshihiro Nakamura, manufacturing engineering section manager, examined the prototype assembly process sheet (shown in Exhibit 6A.18) for the newest subnotebook computer model.

With every new model introduced, management felt that the assembly line had to increase productivity and lower costs, usually resulting in changes to the assembly process. When a new model was designed, considerable attention was directed toward reducing the number of components and simplifying parts production and assembly requirements. This new computer was a marvel of high-tech, low-cost innovation and should give Toshiba an advantage during the upcoming fall/winter selling season.Production of the subnotebook was scheduled to begin in 10 days. Initial production for the new model was to be at 150 unitsper day, increasing to 250 units per day the following week (management thought that eventually production would reach 300 units per day). Assembly lines at the plant normally were staffed by 10 operators who worked at a 14.4-meter-long assembly line. The line could accommodate up to 12 operators if there was a need. The line normally operated for 7.5 hours a day (employees worked from 8:15 A.M. to 5:00 P.M. and regular hours included 1 hour of unpaid lunch and 15 minutes of scheduled breaks). It is possible to run one, two, or three hours of overtime, but employees need at least three days' notice for planning purposes.

The Assembly Line

At the head of the assembly line, a computer displayed the daily production schedule, consisting of a list of model types and corresponding lot sizes scheduled to be assembled on the line. The models were simple variations of hard disk size, memory, and battery power. A typical production schedule included seven or eight model types in lot sizes varying from 10 to 100 units. The models were assembled sequentially: All the units of the first model were assembled, followed by all the units of the second, and so on. This computer screen also indicated how far along theassembly line was in completing its daily schedule, which served as a guide for the material handlers who supplied parts to the assembly lines. The daily schedules were shared with the nearby Fujihashi Parts Collection and Distribution Center. Parts were brought from Fujihashi to the plant within two hours of when they were needed. The material supply system was very tightly coordinated and worked well. The assembly line consisted of a 14.4-meter conveyor belt that carried the computers, separated at 1.2-meter intervals by white stripes on the belt. Workers stood shoulder to shoulder on one side of the conveyor and worked on the units as they moved by. In addition to 10 assembly workers, a highly skilled worker, called a "supporter," was assigned to each line. The supporter moved along the line, assisting workers who were falling behind and replacing workers who needed to take a break. Supporters also made decisions about what to do when problems were encountered during the assembly process (such as a defective part). The line speed and the number of workers varied from day to day, depending on production demand and the workers' skills and availability. Although the assembly line was designed for 10 workers, the number of workers could vary between 8 and 12. Exhibit 6A.18 provides details of how the engineers who designed the new subnotebook computer felt that the new line should be organized. These engineers design the line assuming that one notebook is assembled every two minutes by 10 line workers. In words, the following is a brief description of what each operator does:

I. The first operator lays out the major components of a computer between two white lines on the conveyor.

II. The second operator enters the bar codes on those components into a centralized computer system by scanning the bar codes with a hand-held scanning wand. On a shelf above theconveyor, portable computers display the operations that are performed at each station.

III. The next six steps of the assembly process involve a large number of simple operations performed by hand or with simple tools, such as electric screwdrivers. Typical operations involve snapping connectors together or attaching parts with small screws. All tools are hung by a cable above the operators, within easy reach. Although the individual operations are simple, they require manual dexterity and speed.

IV. The last two operations are the hardware and shock tests. Toprepare for the hardware test, an operator inserts a memory card into the USB port containing software designed to test different components of the computer circuitry. Because it takes nearly four minutes to load the testing software, the cycle time of this operation is longer than the other cycle times on the line. To achieve a lower cycle time for the line, the hardware test is performed in parallel on three different units. The units remain on the moving conveyor, and the tests are staggered so that they can be performed by a single operator. The shock test (the last operation on the assembly line) tests the ability of the computer to withstand vibrations and minor impacts. The computers are moved to a burn-in area after the assemblyline shock test. Here computers are put in racks for a 24-hour 25 ° C "burn-in" of the circuit components. After burn-in, the computer is tested again, software is installed, and the finished notebook computer is packaged and placed on pallets.

Tweaking the Initial Assembly Line Design

From past experience Toshihiro has found that the initial assemblyline design supplied by the engineers often needs to be tweaked. Consider the following questions that Toshihiro is considering:

1 What is the daily capacity of the assembly line designed by the engineers?

2 When it is running at maximum capacity, what is the efficiency of the line?

3 How should the line be redesigned to operate at the target 300 units per day, assuming that no overtime will be used? What is the efficiency of your new design?

4 What other issues might Toshihiro consider when bringing the new assembly line up to speed?

Reference no: EM13859274

Questions Cloud

Design an algorithm to input student records : Design an algorithm to input student records; each record contains a student name, registration code, and credits field. A registration code of 1 indicates that the student is a resident. A registration code of 2 indicates that the student is a nonre..
Combinatorics-passing by reference : Create a new project (called, for example, "homework05"), for this assignment. Do not use spaces in the name. Follow the same process as you did in the first assignment; if you need a refresher, please refer back to Homework 1.
Use matlab to verify the central limit theorem : Use Matlab to verify the central limit theorem for the sum of N independent exponential RVs (with a=0 and b=2) for N= 10 and 20. Repeat for the sum of N independent Weibull RVs (with a=1 and b=4). Comment on the fit to the approximate Gaussian pdf..
Write an algorithm for the hangman game : 1 Write an Algorithm for the Hangman game(include step by step instructions for the game)2 Variable list for Hangman    Variable Name           Data Type        What it holds
What is the daily capacity of the assembly line : What is the daily capacity of the assembly line designed by the engineers? When it is running at maximum capacity, what is the efficiency of the line
What is the annual dividend on the preferred stock : Story Inc. has 5,000 shares of 6%, $100 par value, cumulative preferred stock and 50,000 shares of $1 par value common stock outstanding at December 31, 2013. What is the annual dividend on the preferred stock?
What is the assembly-line efficiency? : What is the assembly-line efficiency?
Why cap on price of gasoline would hurt middle class people : Explain to truck drivers why a cap on the price of gasoline would hurt middle class people more than the high price of gasoline hurts.
Calculate the bending moment and shearforce diagrams : Matlab code that will calculate the bending moment and shearforce diagrams for the attached file. It must be possible to input lengths,udl values fro each element and the programme must calculate the reaction forces at A,B,C

Reviews

Write a Review

Case Study Questions & Answers

  What issues do you think vp of human resources might raise

What issues do you think the VP of human resources might raise

  Perform a swot analysis of estern gear

Perform a SWOT analysis of Estern Gear. In doing so identify what you believe their distinctive competence is or should be?

  Explore a few of the concepts in greater depth

Create a report in which you address the four Case Study Questions, using external literature sources to support your answers.  You may use additional literature to the ones you researched in Assignment One should that prove appropriate.

  How can these people try to minimize high levels of stress

Stress is mentioned throughout this case study. How does this stress occur? What stress outcomes occur for people in these types of jobs? How can these people try to minimize high levels of stress

  Case study:disney animation - john lasseter

What forms of interpersonal power are evident in the case? Provide evidence to support your answer - In what ways do the two faces of power appear in this case?

  Research paper-impact on an organization marketing ovrerseas

As with any company, Cochlear must take into account the varied macro and micro factors when deciding on their target market and then developing the appropriate marketing mix.

  Discuss how the redesigned network needs to operate

Identify and describe which service would be the best fit with the needs of the mobile computing that the organisation is moving towards.

  What process did jeff use in deciding to grow

What process did Jeff use in deciding to grow when he decided to put this thing on steroids - what process should he have used?

  What capabilities would you like to see in the car of future

Which capabilities of internationalization systems will be most critical for manufacturing or selling the cars of the future? What capabilities would you like to see in the car of the future?

  What specific mechanisms did michael have available to him

What specific mechanisms, or opportunities did Michael have available to him for enlisting others? To what extent did Michael take advantage of these?

  Case study on barrys plumbing

BP provide emergency plumbing repairs of all types (sewerage, burst pipes, leaks, etc). They do not do new installations unless it is to replace  an existing installation. BP have a head office at Campsie in Sydney with branch offices at Kotara in..

  Create class diagrams and dynamic models

Create class diagrams and dynamic models (sequence, collaboration, state and activity diagrams) with UML notation and compare the syntax, semantics and pragmatics of UML

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd