What is the annual worth of this investment

Assignment Help Civil Engineering
Reference no: EM13564974

Carlisle Company has been cited and must invest in equipment to reduce stack emissions or face EPA fines of $18,500 per year. An emission reduction filter will cost $75,000 and have an expected life of 5 years. Carlisles MARR is 10 percent/year.

What is the annual worth of this investment?

Reference no: EM13564974

Questions Cloud

Estimate the percentage of time headways that will be 10 sec : At a specified point on a highway, vehicles are known to arrive according to a Poisson process. Vehicles are counted in 20-s intervals, and vehicle counts are taken in 120 of these time intervals.
What is the annual worth of each investment : The engineering team at Manuels Manufacturing, Inc., is planning to purchase an enterprise resource planning (ERP) system. The software and installation from Vendor A costs $380,000 initially and is expected to increase revenue $125,000 per year ever..
Determine whether a jump may occur at an initial depth : A horizontal channel 4 m wide carries a discharge of 16 m3/s. Determine whether a jump may occur at an initial depth of 0.5 m or not. If a hydraulic jump occurs, determine the sequent depth (conjugate depth) to this initial depth. Also determine the ..
Find the discharge and froude number when the total depth : The bottom of a triangular channel is designed to be the best hydraulic section for critical flow at a depth of 1.25m; the sidewalls above the bottom section are vertical and the same width as the triangular section.
What is the annual worth of this investment : Carlisle Company has been cited and must invest in equipment to reduce stack emissions or face EPA fines of $18,500 per year. An emission reduction filter will cost $75,000 and have an expected life of 5 years. Carlisles MARR is 10 percent/year.
What amount will you be able to withdraw each year : At a specified point on a highway, vehicles are known to arrive according to a Poisson process. Vehicles are counted in 20-s intervals, and vehicle counts are taken in 120 of these time intervals. It is noted that no cars arrive in 18 of these 120 in..
Calculate the drawdown at the well : A gravel-packed well with an effective diameter of 36 in is to be constructed in an aquifer with T = 2.6 x l04 gpd/ft and S = 2.3 x 10-5. The design flow of the well is 1000 gpm. Calculate the drawdown at the well
Find the bottom width and the depth of water channel : A simply supported beam carries with a span of 7.5 m carries a uniformly distributed load of 25 N/mm. if the maximum allowed deflection of the beam is 1/325 of its span, detemine the cross-sectional dimensions of the beam. assume the beam has a recta..
Determine the initial temperature and total enthalpy in the : A 10 kg of refrigerant R-134a at 300 kPa fills rigid container whose volume is 14 L. The container is then heated until the pressure is 600 kPa.

Reviews

Write a Review

Civil Engineering Questions & Answers

  Determine whether the crystal structure for this alloy is

Some hypothetical alloy is composed of 12.5 wt% of metal A and 87.5 wt% of metal B. If the densities of metals A and B are 4.27 and 6.35 g/cm3, respectively, whereas their respective atomic weights are

  Determine the force at its bottom needed for equilibrium

If it is subjected to the load of 20kN and the soil provides a frictional resistance that is uniformly distributed along its sides of w = 3kN/m , determine the force at its bottom needed for equilibrium. Neglect the weight of the post.

  Determine the force in wire ab

The specified concrete strength fc for a new building is 6000 psi. Calculate the required average strength fc for the concrete ( a) if there are no prior test results for concrete with a compressive strength within 1000 psi of fc made with sim-ilar m..

  Calculate the maximum temperature and maximum pressure

in an air standard otto cycle , the air at the beginning of the compression stroke is at 95 kpa and 22c ,and the cylinder volume is 0.0028 m^3 . the compression ratio is 9 and 4.3 kj are added during the heat addition process

  Find an expression for the flowrate and average velocity

Water flows steadly in an open topped channel of rectangular cross section. The channel width is B and the depth of the water is D. The flow is designed using a rectangular coordinate system whose orgin is at the free surface midway

  How many tons of coarse aggregate will be required to fill

how many tons of coarse aggregate will be required to fill a trench 5 ft deep, 3 feet wide and 300 feet long. the coarse aggregate unit weight equals 93.6 lb per cu ft.

  What is the station of the pt on a single-lane highway

A Horizontal curve on a single-lane highway has its PC at station 123+70 and its PI at station 130+90. The curve has a super-elevation of 0.06 ft/ft and is designed for 70 mph. What is the station of the PT

  Write equilibrium equations in the x-y and z directions

The traffic light shown in Figure 3 is supported by a system of cables. Points A and B are in a vertical plane which is parallel to x-z plane. Point C is in y-z plane. The traffic light has a mass of 75 kg.

  Write a computer program to calculate deflection at midpoint

Two 52 kN loads are maintained 2.5 m apart as they are moved slowly across beam AB. Write a computer program to calculate the deflection at the midpoint C of the beam for values of x from 0 to 9 m, using .5 m increments.

  Calculate the overconsolidation ratio of the clay layer

From the results of an oedometer test on an undisturbed sample of clay taken at a depth of 10 m from the ground surface, the maximum vertical preconsolidation pressure (s'vmax or s'c) was found to be 560 kPa.

  Express mass moment of inertia of solid with respect to x

The area shown is revolved about the x axis to form a homogeneous solid of revolution of mass m. Using direct integration, express the mass moment of inertia of the solid with respect to the x axis in terms of m and h

  Compute stationing of pvc-pvi and pvt curve points

The profile of the bridge and tunnel. Devise a vertical alignment to connect the tunnel and bridge by determining the highest common design speed for the sag and crest (equal tangent) vertical curves needed.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd