There are two ways to get from City One to City Three, (a) directly or (b) via City Two. Let A be the event that the road from City One to Three is open. Similarly, B is for City One to Two and C is for City Two to Three. If snow is forecast for the next day, one can assume from past experience that Pr[A] = 0.6, Pr[B] = 0.7, Pr[C] = 0.4, Pr[C|B] = 0.5, and Pr[A|BC] = 0.4. Pr[A|BC] is the probability of A occuring conditional on BnC occuring. A, B, and C are NOT independent.
a) What is the probability that one can travel to City Three via City Two?
b) Which route ( One to Three or One to Two to Three) should you take? Explain
c) What is the probability that one can travel from City One to Three (directly OR via City Two)
Write a MATLAB program that loads the sensor_new.dat file. The sensor readings were actually taken every second over a period from 0 to 19 seconds. Create a time vector going from 0 to 19 in 1 second increments.
The left-hand span is 16 ft and the right-hand span is 20 ft. The beam supports a uniform load of 900 plf, which includes its own weight, over the entire 36 ft and also a concentrated load of 10,000 lb applied at a point that is 5 ft from the left..
Make a sketch indicating the incorrect and correct positions of such an original section corner and also the positions of the adjacent corners used in relocating that corner
What is the maximum length of trench that can excavated by hand economically rather than by a trenching machine. it cost 900.00 to transport a trenching machine to the job and back to the storage yard
The inflow to a small reservoir during a storm may be described by the equations Q=1000(1-e^-kt) where Q= flow in cfs k= runoff rate = 1.0 per hour t = time in hours The outflow through the dam gates is held constant at 800 cfs.
Then calculate a 6% tax on the total and display the total amount owed (including the tax) Round your answer to two decimal points and include the dollar sign in your display as appropriate.
Rainwater runoff from a 200 x 500 ft parking lot is to drain through a circular concrete pipe that is laid on a slope of 5 ft/mi. Determine the pipe diameter if it is to be full with a steady rainfall of 1.5 in/hr
the jib crane is supported by a pin at c and a rod at ab if the load has a mass of 2Mg with its com located at g determine the horizontal and vertical components of the reaction at the pin c
write a c++ code for two classes one being automobile and one being motorcycle both being the base class then at least one derived class from each
Two remediation options are being considered for a contaminated land area formerly used for industrial operations. Option 1 involves removing all of the contaminated soil over a two-year period at a cost of $2.2 million per year
A 12inx1inx3in ASTM 36 steel bar is loaded with an axial load of 90,000lbs and a transversal load of 288,000lbs (force applied perpendicular to the 1in side) The proportionality limit is 34,000psi.
If arm OA rotates with a constant clockwise angular velocity of theta dot(first dirivatie)=1.5 rad/s. determine the force arm OA exerts on the smooth 4-lb cylinder B when theta=45 degrees.
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd