Product C is assembled from components D and E. Item D is made from item F and Item G. Item F is made from item J and item K Item E is made from item H and item I. Item H is made from Item J. All parent items require 1 unit of their respective component items. The lead times are as follows Item C D E F G H I J K Lead time(weeks) 3 5 6 5 1 1 3 1 3 a.) What is the lead time required to respond to a customoer order for product C, assuming that there are no existing inventories or scheduled receipts? b.) What is the customer response time if items J and K are in stock (i.e., do not need to be ordered)? c.) If you are allowed to keep either item G or item I in stock (along with items J and K from part b), which one would you choose and why?
Assume a midpoint of $32,000 per year and a 40% range spread. The individual is curretnly being paid at an 83% compa-ratio. The individual receives a 7% pay increase. On January 1, 2014 the entire pay grade increases by 2.5%
Determine the alternative that provides Andrew the greatest Expected Monetary Value. What is this EMV?
What are the differences between MNEs and global organizations? How do organization types affect HR management?
The following is a payoff table giving profits for various situations. States of Nature Alternatives A B C Alternative 1 100 120 180 Alternative 2 120 140 120 Alternative 3 200 100 50
The objective is to find a production plan that maximizes the daily profit. Formulate your model mathematically and solve it by using the Excel solve
Discuss three issues that can deter high performance when outsourcing a project.
Specifications for a piece of material used in the manufacture of a bed mattress require that the piece be between 59.28 and 60.72 inches. The process that produces the piece yields a mean of 60 and a standard deviation of 0.6 inches.
An engine system consists of three main components in a series, all having the same reliability. Determine the level of reliability required for each of the components if the engine is to have a reliability of 0.998.
There is negligble fixed cost if the item is purchased, a numerically controlled machine costs $124,000, and a machining center costs $217,000.
Explain whether these responses have been effective or not. Explain your answer and share with the class.
Which process step has the highest capacity? d. If the wage rate is $ 36 per hour per person, what is the direct labor cost per unit?
Be as creative also innovative as you need. Imagine which you are one of his top advisors also which he will take your suggestions seriously." Tour C & D A batch flow process also A machine paced line flow process, illustrate what degree does ver..
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd