Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
A beam having an overall length of 24' has a 4' overhang at one end. The left support is a pin connection, and the right connection is a roller. A concentrated downward force of 2000 lb. is located 6' from the left support, and a uniformly distributed load of 200 lbs./lin. ft. begins 6' to the right end of the member. What force must be applied at each connection to maintain equilibrium?
Determine the magnitude of reaction at point A (in kips) of a 20' beam with 5kips at 4' of the beam and 2kips at 9' of the beam at 350lbs./ft.
(a) Use differentiation to find a general expression for the rocket's velocity as a function of time, (b) When is the velocity zero?
Also calculate the deflection of the beam to check that it complies with the design limit of L/200. Only variable actions are required for deflection check.
What is the velocity head expressed in atmospheres for a rapid filter operated at a surface loading rate of 475 m/d when the local porosity is 0.40?
a quartzite sample in a compression testing mechine is 180mm long and 54mm in diameter. what is the stress under a load of 100kN? if the modulus of elasticity is 102kN/mm2, find the strain develope in the sample.
At a section in a beam the tensile stress due to bending is 70 N/mm 2 and there is a shear stress of 25 N/mm 2 . Determine from first principles, the magnitude and direction of the principal stresses and calculate the max shear stress.
A proposed earthen dam will contain 5,000,000 cubic meters of earth. Soil to be taken from a borrow pit will be compacted to a void ratio of 0.78. The void ratio of soil in the borrow pit is 1.12. Estimate the volume of soil (cubic meters) that mu..
Write a paper on steel sustainability.
the 3.5mg engine is suspended from a 500 kg spreader beam and hoisted by a crane which gives it an acceleration of 4m/s^2 when it has a velocity of 2m/s. determine the force in chains AC and AD during the lift.
A trapezoidal channel is carrying water at a normal depth of 5.2 ft, the channel has a bottom width of 10 ft and side slopes of 2 H to 1 V. It is running on a slope of 0.005 ft/ft. What will be the shear stress in lb/ft^2 exerted on the channel be..
what is elastic wave tomography , flat jack, push shear test in masonary?
A 0.3-m diameter pipeline terminates in a nozzle of outlet diameter = 0.15 m. When water flows through this pipe at a rate of 0.25 m3/s, the force required to hold the pipe (N) is most nearly.
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd