Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
You are a construction engineer working on a large concrete foundation project, involving the placement of over 500,000 c.y of concrete. The construction site is adjacent to a salt-water source (bay) & it is decided to set up a concrete batch plant on site. The project schedule shows that the various concrete pours are to take place from April to September.
What considerations would you make with regards to cement type, aggregate, water quality, and admixtures?
A water tank has a height of 120m, and its area of cross-section is 2000m. Water is released from the tank and the water level drops by 1 meter every minute. Find the rate of change in volume.
given bulk density as 1300kg/cubic meter and field capacity as 22% by weight and permanent wilting point as 10% by weight calculate available water capacity.
Q. What is the main objective of NASA's Mars Science Laboratory (MSL) mission? When was it launched and when and where is it scheduled to land on Mars? Explain the major differences between this mission and Mars Exploration Rovers (MER) mission?
Assume Stoke's Law holds true for the following question. You are asked to desgin a settling basin. Flow rates are 16 million gallons/day. The basin must be 4m deep, and 4m wide. Particle size ranges from 0.2-50 mm in diameter.
What is the runoff coefficient in a basin located near the middle of the climatic spectrum, with annual precipitation P = 32 in, ecosystem evapotranspiration ET = 22 in, and baseflow U = 3 in
Find the length and width of a square basin for virus disinfection of a flow of 6 MGD. You may assume a depth of 5 ft, a C•t product of 10 (mg/L) •min for 1.5-log removal, and a target free chlorine residual of 0.6 mg/L.
A conical tube of length 8 m fixed vertically with its smaller end upwards. The velocity head and pressure head at upper ends are 1.27 m and 2.50 m respectively.
Water flows into and out of a 5 liter tank at a rate of 1 L/min. Within the tank, the mineral apatite is dissolving at a rate of 3x10^-10 moles of Si per m^2 per sec. If the tank contains 10g of the apatite with a specific surface area of 2 m^2/g,
why is wood more common in residential construction in the US and concrete more common in commercial construction
Knowing that at t= 3s slider block C has moved 57 mm to the right, Determine the velocity of slider block C at t=0, (b) the acceleration of A and C, (c) the change in position of block A after 5s.
Peg P is driven by the fork link OA along the curved path described by r = (2*theta) ft. At the instant theta = pi / 4, the angular velocity and angular acceleration of the link are (theta-1dot) = 3.0 rad/sec and (theta-2dot) = 1.1 rad/sec^2
An Electrostatic Precipitator must treat 500,000 acfm with 99% efficiency. Assuming an effective drift velocity of 0.4 ft/sec, calculate the required plate area in ft^2, and the number of plates if each is 20 ft tall by 10 ft long, and there are 4..
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd