1. What are the processes for developing a new mine in Australia? Give your answer as per your geographic location.

2. What are strategic risks? How would you manage these risks?

3. Define short, medium and long term planning?

4. Discuss some of the factors that an engineer needs to account for when planning a mining operation.

5. What techniques of pit optimisation are available?

6. Define the following in relation to network techniques (CPM and PERT)
a) Earliest start time
b) Latest start time
c) Earliest finish time
d) Latest finish time
e) Slack
f) Float

7. Discuss the floating cone process.

8. Describe three problems with regard to the application of the floating cone technique. What are the positive aspects of the floating cone technique?

9. Summarise the steps in the Lerchs-Grossmann 2D algorithm

10. Define the terms:
a) Project year
b) Production year
c) Calendar year

11. Summarise the basic concepts behind Lane's algorithm

12. A project is defined by the list of activities detailed in Table 1.
a) Draw the network as an activity on the arc network
b) Find the critical path
c) Find the slack for each activity

Table 1

Activity

 

Immediate predecessors

Duration days

 

A

-

3

B

-

4

C

-

3

D

C

2

E

B

1

F

A

5

G

B

2

H

B

3

I

C

11

J

D, E

3

K

F, G

1

L

K

4

M

J, H

4

13. The network shown in the next diagram is to be used in the planning of the installation of an underground crusher station. Determine the total project time and the critical path.

754_Figure.jpg

14. Cut-off Grade

Following are the variables for choosing the "Optimum Cut-off Grade":
M = maximum amount of material that the mine can produce in any given time (mine capacity)
C = maximum amount of ore that can be put through the concentrator in any given time (mill capacity)
R = maximum amount of final product that can be produced in the given time period
(production capacity)
m = mining costs, $/t of material mined c = concentrator cost, $/t of ore milled r = smelting, refining, packaging, insurance cost, $/kg of final product f = fixed cost
s = selling price y = recovery
T = length of production period
Qm = quantity of material to be mined
Qc =quantity of ore sent to the concentrator
Qr = amount of product actually produced over this production period

A. Using these above variables, develop the basic equations for

a) total cost, Tc

b) revenue, R

c) profit, P

B. Develop the equations for cut-off grade assuming that

a) mining rate is the governing constraint

b) concentrating rate is the governing constraint

c) refining rate is the governing constraint

15. Define the following terms used with respect to the Lerchs-Grossmann 3D algorithm

a) Directed arc

b) Edge

c) Weight

d) Node

e) Graph

f) Directed graph

g) Sub graph

h) Closure

i) Maximum closure

j) Circuit

k) Chain

l) Cycle

m) Path

n) Tree

o) Root

p) Branch

q) Twig

16. DESIGN PROJECT

The following describes a selection of mineral deposits. The candidate (Note: choose only anyone) is required to select a suitable mining method for the deposit based on the information given and to describe the mining system in detail. For whichever mineral deposit is selected, the candidate should include in their answer the following as required:

1. Describe suitable surface connection(s).

2. Detail development requirements

3. Detail Production requirements including a full description of the method selected.

4. Number of production unit's required/rate of production.

5. Describe loading/haulage requirements

6. Equipment

7. Briefly describe ventilation/drainage/power requirements

8. Personnel

9. Safety

10. Detail permitting and other requirements as required by the local regulator (students can select which jurisdiction the mine is located in from any Australian state or territory)

Students should also report on other salient points as required by the mining system. For economic analysis, use current market prices in A$ for the commodity as required. Accurate costings are not an essential aspect to the project but some notional costings should be undertaken to illustrate the viability of the method detailed.

UNDERGROUND MINING PROJECT

A massive silver/lead/ zinc deposit approximately 250 m in width and 1,500m long ranging in depth from 300m below surface to 900m below surface. Angle of dip is 70°.

SURFACE MINING PROJECT

A copper-gold-silver mine is located in a desert at an elevation of 3,050 m above sea level. Production is 46.9 Mt/y of sulphide ore grading 1.9% copper, containing 776,400 t of copper, 129,000 oz of gold and 3.28 Moz of silver.

The deposit is related geologically to three porphyry bodies intruded along a major fault system. Primary hydrothermal sulphide ore grades at between 0.2% and 1% copper. Subsequent weathering and uplifting created a barren, leached cap, up to 180 m thick, over a high-grade supergene enriched ore, both overlying the primary sulphides. Primary sulphide mineralisation includes pyrite, chalcopyrite and bornite, with covellite and chalcocite in the enriched zone. Some areas contain significant oxide copper oxides overlying the sulphides.

Proven and probable reserves estimated at 1,990 Mt grading 1.23% copper. Initial mining reserves totaled 662 Mt grading 2.12% copper. The stripping ratio will average around 1.7:1 over the full life of the project.

Verified Expert

The attached assignment regarding mining process in Australia is prepared in MS word document. It consists of 26 pages with more than 6000 words count. It answers all the 16 questions asked. It includes three problematic questions and remaining theoretical questions. Needed diagrams and tables were included for some answers where needed. This answers all the questions asked and prepared in the format given.

Reference no: EM131089506

Questions Cloud

Same appeal for older chinese : Why has "OMG! Meiyu" been so successful in China? Why do you think people have responded so well to the program? Do you think it holds the same appeal for older Chinese as it does for younger students?
What is marginal benefit at this level : Your firm’s research department has estimated your total revenues to be R(Q) = 600Q – 4Q2 and your total costs to be 60 + 2Q2. (Note that MB = 600 - 8Q and MC = 4Q). What level of Q maximized net benefits? What is marginal benefit at this level of Q?
Describe an effective leadership style to address a problem : Explain the accountability of the nurse leader for decisions that affect health care delivery and patient outcomes. ?Describe how outcomes or success of the style selected for each situation could be measured.
Formation of the ural and appalachian mountains : How does the theory of plate tectonics explain the existence of this mountain belt in the interior of an expansive continental landmass - Compare and contrast the formation of the Ural and Appalachian mountains, given their similar age.
What are the processes for developing a new mine : What are the processes for developing a new mine in Australia? Give your answer as per your geographic location - what are strategic risks? How would you manage these risks?
Payment systems in services such as medicare : Question:  Analyze the changes that have occurred in recent years regarding the payment systems in services such as Medicare, Medicaid, Managed Care, etc.
Determining the problem of inflation : Monetary policy by the US Federal Reserve is important for the US economy. However,economists disagree about several aspects of Federal Reserve decision-making powers including the composition of the Federal Reserve committees, Federal Reserve goa..
Who is leading the charge to promote safety : A "culture of safety" is a term about which we hear a great deal. Describe the culture of safety at your organization. Who is leading the charge to promote safety? What is your role as a BSN-prepared nurse in ongoing strategies to promote safety?
Effect of importing cheap manufactured goods : What is the effect of importing cheap manufactured goods from out country to the local manufacturers?

Reviews

Write a Review

Civil Engineering Questions & Answers

  Estimate the tensile strength of the wire and the work

A polycrystalline Al alloy contains a dispersion of hard particlesof diameter 10-8m and average center to center spacingof 6x10-8m measured in the slip planes. Estimatetheir contribution to the tensile yield strength,σy, of the alloy.

  Write a test to assess compliance with the following require

Are all the types of requirements covered (environmental,performance, etc). If not, what areas need to be covered byadditional requirements to make the list of requirementscomplete.

  How many moisture of aggregate will be needed

Base course aggregate has a target dry density 119.7 lb/cu ft in place. it will be laid down and compacted in a rectangular street repair area of 2000 ft x 48 ft x 6 in the aggregate in the stockpile contains 3.1% moisture.

  How many cubic yards of soil must be excavated from pit

A 1000 cubic yard embankment is to be built using soil from a borrow pit. The properties of embankment and the borrow pit soil are given below: Embankment: Dry unit weight = 115 pcf; Water content = 15%

  Estimate the constant rate of withdrawal from reservoir

Estimate the constant rate of withdrawal (in m^3/s) from a 1375 ha reservoir in a month of 30 days during which the reservoir level dropped by 0.75 m in spite of an average inflow into the reservoir of 0.5 Mm^3/day.

  Determine the dimensions of the box that will minimise the

Determine the dimensions of the box that will minimise thecosts of materials.Based on material costs alone,how many bins canthe manufacturer produce?

  Difference between the static and stagnation pressures

A Pitot static probe measures the difference between the static and stagnation pressures to be 35 kPa. Calculate the speed of the airplane and the flight Mach number.

  Determine the angle formed by the pipes

Section AB of a pipeline lies in th eyz plane and forms an angle of 37 degrees with the z axis. Branch lines CD and EF join AB as shown. Determine the angle formed by the pipes.

  Determine the amount of air that must be bled off to restore

When the air temperature is 25°C, the pressure gage reads 210 kPa. If the volume of the tire is 0.025 m3, determine the pressure rise in the tire when the air temperature in the tire rises to 50°C.

  How much will be in a high-yield account at national bank

How much will be in a high-yield account at the National Bank of Arizona 12 years from now if you deposit $5000 now and $7000 fi ve years from now. The account earns interest at a rate of 8% per year, compounded quarterly

  Find infiltration rate assuming that entire crack admits air

A room in a single-story building has three 2.5 x 4 ft double-hung wood windows of average fit that are not weather-stripped. The wind is 23 mph and normal to the wall with negligible pressurization of the room.

  Compute the volume of the water squeezed out of the clay

A 10,000 ft3 mass of saturated clay had a void ratio of 0.962 and a specific gravity of solids of 2.71. A fill was then placed over this clay, causing it to compress. However, the volume of the solids remained unchanged.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd