Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
Reconsider Prob. 12-16. Using EES (or other) software, verify the validity of the last Maxwell relation for refrigerant-134a at the specified state.
Prob. 12-16
Verify the validity of the last Maxwell relation (Eq. 12-19) for refrigerant-134a at 80°C and 1.2 MPa.
An embarkment will be constructed with the soil compacted to 95 percent of the max dry density. the borrow material, is deposited at a uniform density of 75 percent of the max dry density. the roadway embankment will require 75,000 cubic yards of fil..
An engineer in a developing country observes that his project bankaccount has grown from 1,600,000 to 1,769,279 (local currencyunits) in 20 days with no deposits or withdrawals being made.
design a bar screen for a peak average flow of 0.46m3/s.you can consider reasonable assumptions.
If the static port of an aircraft became blocked during a climb the vertical speed indicator would: 1.Remain at the previously indicated rate of climb 2.Fall to zero rate of climb indication 3.Indicate a maximum rate of climb 4.Indicate a maximum rat..
A gate valve is located at the end of the pipe. If the valve is closed suddenly, determine the maximum water hammer pressure that will develop in the pipeline. The water level in the reservoir is 98.4 ft above the outlet.
mg/L of salt. The new owners propose to flush the pond into their discharge pipe leading to the Atlantic Ocean, which has a salt concentration above 30,000 mg/L.
To avoid boredom, employees are assigned all three tasks at different times during the shift. Each employee has to work at least half an hour at each station during a five hour shift. How much time should each employee spend at each in order to maxim..
A structural steel beam is attached to a column with bolts. The downward force on the connection is 150 kips. What bolt sizes must be used if the allowable shear stress is 25.0 ksi
Discuss the method of investigation for upgrading gravel road to bituminous paved road,40km long
Why is aluminum preferred over iron-based alloys in the aerospace industry and iron-based alloys over aluminum in structural numbers of bridges and buildings
If 30% of supplied water is retained within the consumption areas ( as garden water,...) determine daily average, daily maximum and daily minimum of wastewater using both tabulated coefficients and Gift's formula for peaking factor. N.B. Conduit I..
Water flows in a circular pipe of diameter D at a depth y (
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd