Using finite element method to find temperature of the poker

Assignment Help Civil Engineering
Reference no: EM1383452

One end of a poker is placed in a fire. The poker is made of steel with k = 50 W/m-oC, and it has a diameter of 0.2 m. The left end of the poker in the fire is at a constant temperature of 350 oC. The air around the poker is at a temperature of 30 oC with h = 5 W/m2-oC. The length of the poker between the fire and the handle is 0.6 m long.

Determine:

a. The temperature of the poker at the third points of the poker using three elements of equal length. Use the finite element method. You may use Mathcad to solve this problem. If you do, please show all work and add comments to the Mathcad solution to indicate your process.

b. The heat flux through element one.

Reference no: EM1383452

Questions Cloud

Identify the variables for which you would need values : Identify the variables for which you would need values to be able to calculate an actual forecast for a future month (using the forecasting method you selected).
Surface overflow rate-horizontal flow through velocity : A rectangular clarifier with a length:width ratio of 3:1 receives a flow of 850m3/day. the clarifiers depth is 4.0m and the detention time of the water inthe clarifier is 2.4 hrs, what are the surface overflow rate and the horizontal flow through ..
A pizza delivery company promises to deliver all customer : A pizza delivery company promises to deliver all customer orders within one hour of receiving an order at one of its stores. Actual data for all pizza delivered during the past week showed that the average delivery time was 40 minutes and standar..
Finding approximate frequencies of phenotypes : The boss in your laboratory has just heard of a proposal through another laboratory that genes for eye color & the length of body bristles may be linked in   Drosophila .
Using finite element method to find temperature of the poker : The temperature of the poker at the third points of the poker using three elements of equal length. Use the finite element method. You may use Mathcad to solve this problem. If you do, please show all work and add comments to the Mathcad solution ..
A company that manufactures ladies hand bags wants : A company that manufactures ladies hand bags wants to determine if their buffing process is working properly. They take 4 observations per day and record the amount of time
Elevation and stationing of the low point : A 1600 ft long sag verical curve (equal tangent) has a pvc at station 1200+00 and elevation o 1500 ft. the initial grade is -3.5% and the final grade is 6.5%. determine the elevation and stationing of the low point, pvi and pvt.
Density of the original culture : Assume you count the number of bacteria in 5 of the 1/400mm^2 small boxes of the central grid on the Hemocytometer.
Businesses not only respond and react to external forces : Businesses not only respond and react to external forces, but can also attempt to influence them

Reviews

Write a Review

Civil Engineering Questions & Answers

  Determining the crest and sag vertical curves

Determine, for the crest and sag vertical curves required, the stationing and elevation of the PVCs and PVTs given that the PVC of the crest curve(on westernmost level highway section) is at station 0+00 and elevation 100 ft.

  Force required to maintain this motion

The viscosity of the film of oil separating the piston from the cylinder is 0.020 lb.s/ft. Calculate the force required to maintain this motion.

  Minimizing the tension tab

What should TAC , TAB and the acute angle ? between TAB and the vertical to minimize the tension TAB ? Take o and W = 1,000 N. Hint: Consider various possible force triangles and decide on inspection how to minimize TAB.

  Gathering the data information

What additional data and information should he gather,and how should he go about gathering the data information ?

  Write a report on toxic and hazardous waste

Toxic and Hazardous waste: how are they treated, safety measures, regulations in USA about hazardous waste.

  Writing case study about bridge collapse

Writing case study about bridge collapse

  Average waiting time in the queue

What is the average length of queue, the average time spent in the system, and the average waiting time in the queue?

  Principal stresses and the orientation of planes

A direct shear test is performed on a saturated specimen of loose sand. A normal stress equal to 100 kPa is applied and a maximum shear stress of 75 kPa is measured in the shear test. Determine the principal stresses and the orientation of these p..

  Uniform deterministic arrival rate

Processing begins when the lane reaches capacity, what is the uniform deterministic arrival rate if the vehicle queue is cleared in 35 minutes after vehicles begin to arrive (in veh/min.)?

  Expanded depth of the bed after the backwash

Find the expanded depth of the bed after the backwash when initial depth of the bed is 3 ft using given conditions. μ = 0.01g/cm/sec, T = 25oC, ρs = 2.65, ρ=1, washrate = 1.5 cm/sec, ks2 = 196. (Assumed single size)

  Density of traffic stream in lane

Assume you are observing traffic in a single lane of a highway at a specific location. you measure the average headway and average spacing of passing vehicles as 3 seconds and 150 ft, respectively. calculate the flow, average speed, and density of..

  Transportation and management

In the construction management, there is a lot of procurement route that are necessary and suitable for the construction industry.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd