Use to evaluate alternatives that your team may develop

Assignment Help Operation Management
Reference no: EM132245574

Hank Kolb was whistling as he walked toward his office, still feeling a bit like a stranger since he had been hired four weeks ago as director, quality assurance.1 All last week he had been away from the plant at an interesting seminar entitled “Quality in the 80s” given for quality managers of manufacturing plants by the corporate training department. He was not looking forward to really digging into the quality problems at this industrial products employing 1,200 people. Hank poked his head into Mark Hamler’s office, his immediate subordinate, the quality control manager, and asked him how things had gone last week. Mark’s muted smile and an “Oh, fine” stopped Hank in his tracks. He didn’t know Mark very well and was unsure pursuing this reply any further. Hank was still uncertain of how to start building his relationship with him since Mark had been passed over for the promotion to Hank’s job—Mark’s evaluation form had stated “superb technical knowledge; managerial skills lacking.” Hank decided to inquire a little further and asked Mark what had happened. Mark replied: Oh, just another typical quality snafu. We had a little problem on the Greasex line last week (a specialized degreasing solvent packed in a spray can for the high-technology sector). A little high pressure was found in some cans on the second shift, but a supervisor vented them so that we could ship them out. We met our delivery schedule! Since hank was still relatively unfamiliar with the plant and the products he asked Mark to elaborate. Painfully, mark continued: We’ve been having some trouble with the new filling equipment, and some of the cans were pressurized beyond our acceptable standard on a psi (pounds per square inch) rating scale. The production rate is still 50 percent of standard, about 14 cases per shift. Mac Evans (the inspector for that line) picked it up, tagged the cases “Hold” and went on about his duties. When he returned at the end the shift to write up the rejects, Wayne Simmons, first-line supervisor, was by a pallet of finished goods finishing sealing up a carton if the rejected Greasex: the reject “Hold” tags had been removed. He told Mac that he had heard about the high pressure from another inspector at coffee break, had come back, had taken off the tags, individually turned the cans upside down and vented every one of them in the rejected eight cartons. He told Mac that production planning was really pushing for the stuff, and they couldn’t delay by having it sent through the rework area. He told Mac that he would get on the operator to run the equipment right next time. Mac didn’t write it up but came in about three days ago to tell me about it. Oh, it happens every once in a while, and I told him to make sure the filling machine was adjusted; and I saw Wayne in the hall and told him that he ought to send the stuff through rework next time. Hank was a bit dumbfounded at this and didn’t say much—he didn’t know if this was a “big deal” or not. When he got to his office he thought again what Mr. Morganthal, general manager, had said when he had hired Hank. He warned Hank about the “lack of quality attitude” in the plant and said that Hank “should try to do something about this.” He had further emphasized the quality problems in the plant. “We have to improve our quality, it’s costing us a lot of money, I’m sure of it, but I can’t prove it! Hank, you have my full support in this matter; you’re in charge of these quality problems. This downward quality-productivity-turnover spiral has to end!” The incident had happened a week ago; the goods were probably out in the customer’s hands by now; everyone had forgotten about it (or wanted to!); and there seemed to be more pressing problems than this for Hank to spend his time on; but this continued to nag at him. He felt like the quality department was being treated as a joke, and it also felt ti him like a personal slap from manufacturing. He didn’t want to start a war with the production people but what could he do? He was troubled enough to cancel his appointments and spend the morning talking to a few people. After a long and very tactful morning, he learned the following: A. From personnel—the operator for the filling equipment had just been transferred from shipping two weeks ago. He had had no formal training in this job but was being trained by Wayne, on the job, to run the equipment. When Mac had tested the high-pressure cans, the operator was nowhere to be found and had only learned of the rejected material from Wayne after the shifts were over. B. From plant maintenance—this particular piece of automated filling equipment had been purchased two years ago for use on another product. It had been switched to the Greasex line six months ago, and maintenance had had 12 work orders during the last month for repairs or adjustments on it. The equipment had been adapted by plant maintenance for handling the lower viscosity Greasex, which it had not originally been designed for. This included designing a special filling head. There was no scheduled preventive maintenance for this equipment, and the parts for the sensitive filling head, replaced three times in the last six months, had to made at a nearby machine stop. Non-standard downtime was running at 15 percent of actual running times. C. From purchasing—the plastic nozzle heads for this new Greasex can, recently designed by a vendor for this new product on a rush order, were often found with slight burrs on the inside rim, and this caused some trouble in fitting the top to the can. An increase in application pressure at the filling head by maintenance adjustment had solved the burr application problem or had at least “forced” the nozzle heads on despite burrs. Purchasing said that they were going to talk to the sales representative of the nozzle head supplier about this the next time he came in. D. From product design and packaging—the can, designed especially for Greasex, had been contoured to allow better gripping by the user. This change, instigated by marketing research, set Greasex apart from the appearance of its competitors and was seen by the designers to be “significant.” There had been no test of the effects of the contoured can on filling speed or filling hydrodynamics from a high-pressured filling head. Hank had a hunch that the new design was acting as a venturi when being filled, but the packaging designer thought that “unlikely.” E. From manufacturing manager—he had heard about the problem; in fact, Wayne had made a joke about it, bragging about how he beat his production quota to the other foremen and shift supervisors. Wayne was thought to by the manufacturing manager to be one of the “best foremen we have… he always gets his production out.” His promotion papers were actually on the manufacturing manager’s desk when hank dropped by. Wayne was being “strongly considered” for the promotion to shift supervisor. The manufacturing manager, under pressure from Mr. Morganthal for costs improvements and reduced delivery times, sympathized with hank but said that the rework area would have just vented with their pressure gauges that Wayne did by hand. “But, I’ll speak with Wayne about the incident.” F. From marketing—the introduction of Greasex had been rushed to beat competitors to market and to a major promotional/advertising campaign was now underway to increase consumer awareness. A deluge of orders was swamping the order-taking department right now and putting Greasex high on the back-burner list. Production “had to turn the stuff out”; even a little off spec was tolerable because “it would be better to have it on the shelf than not there at all. Who cares if the label is a little crooked or the stuff comes out with a little too much pressure. We need market share now in that high-tech segment.” What bothered Hank the most was the safety issue of the high-pressure in the cans. He had no way of knowing how much of a hazard the high pressure was or if Wayne had vented them enough to effectively reduce the hazard. The data from the can manufacturer which Mark had showed him indicated that the high pressure which the inspector had found was not in the danger area; but then again the inspector only used a sample testing procedure to reject the eight cases. Even if he could morally accept that there was not product safety hazard, could he make sure that this never happened again? Hank, skipping lunch, sat in his office and thought about the morning’s events. Last week’s seminar had talked about “the role of quality,” “productivity and quality,” “creating a new attitude,” and the “quality challenge” but where had they told him what to do when this happens? He had left a very good job to come here because he thought the company was serious about the importance of quality, and he wanted a challenge. Hank had demanded and received a salary equal to the manufacturing, marketing, and R&D directors and was one of the direct reports to the general manager. Yet he still didn’t know exactly what he should or shouldn’t do or even what he could or couldn’t do. Questions. 1. Describe the data and information collection tools that you will use to analyze this problem. Be specific. For the data you will collect, design the data form(s) that will be used. You may also identify data that may be within the organization data bases that you will analyze. 2. Generate a data set (since you cannot actually collect the data) and show how you would use one or more analysis methods to analyze the data. 3. Establish design criteria that you will use to evaluate alternatives that your team may develop. 4. From the information in the case, as well as any other data/information that you have, make recommendations on how to improve the quality management system in the organization. Create an evaluation system that you will use to track the results of your team’s recommendations.

Reference no: EM132245574

Questions Cloud

What is the crossover point in units for the two operations : What is the crossover point in units for the two operations?
Convey a business voice in management writing : Identify sentence and paragraph level language needed to convey a business voice in management writing.
Explain crowdsourcing : Explain Crowdsourcing? Explain the 4 types of crowdsourcing, how can you use each of them.
Customer activity repository : NEED HELP understanding SAP CAR (Customer Activity Repository) and Omni-Channels.
Use to evaluate alternatives that your team may develop : Establish design criteria that you will use to evaluate alternatives that your team may develop.
What kinds of communication challenges have you experienced : What kinds of communication challenges have you experienced at work and what strategies did you use to address them?
What would be good promotions plan : What would be a good promotions plan for a new style of Internet provider? explain and describe.
Strategic acquisitions and accelerated integration : Strategic Acquisitions and Accelerated Integration of Those Acquisitions are a Vital Capability of Cisco Systems
What are the three pillars of sustainability : How would you define a sustainable business? What are the three pillars of sustainability?

Reviews

Write a Review

Operation Management Questions & Answers

  Traditional and non-traditional sources of job leads

Examine the concept of exploring and networking the Traditional and Non-Traditional sources of job leads.

  Beyond conformance to standards

How can organisations compete on quality and go beyond conformance to standards.

  What are some recent trends in supply chain management

1. What is a supply chain?2. What are some recent trends in supply chain management?3. What are the elements of supply chain management?

  Management identifies and prioritizes improvement projects

In our Six Sigma program, management identifies and prioritizes the improvement projects that will be scheduled and initiated each year.

  Calculate the level of consumer surplus retained

Calculate the level of consumer surplus retained by consumers at this price.

  Constantly monitor the legislative and judicial processes

The marketer must constantly monitor the legislative and judicial processes in the United States to stay abreast of new legislation and court decisions that might impact the marketing environment. The Act prohibits a number of activities, including t..

  Different types of terrorist organizations

Compare and contrast the different types of terrorist organizations that you have learned about in this section. Discuss the following:

  Key functions of the agency for healthcare research

What are the key functions of the Agency for Healthcare Research and Quality

  Create a compelling vision for the organization

Leaders today must be able to create a compelling vision for the organization. They also must be able to create an aligned strategy and then execute it.

  Used most by arbitrators in arriving at arbitration decision

Which of the following is not one of the "top three" factors used the most by arbitrators in arriving at the arbitration decision?

  Managing inventory-discussing the role of holding costs

Managing Inventory Explain economic order quantity (EOQ) by discussing the role of holding (carrying) costs,

  How many books must be sold to break even

How many books must be sold to break even? If the fixed cost increased, would the new break-even point be higher or lower?

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd