Use of lead in making plates, forks and knives

Assignment Help Other Engineering
Reference no: EM13798545

1- What are the three components of "Venn" (sometimes written as Wen) Diagram-select from the followings circle them?

a-imagine,

b-due diligence
c-see

d-test

e-draw or write

2- Where does the "Product" occur within Venn diagram? a-does not occur in this diagram

b-outside of the three circles

c-where three circles intersect

3- List the phases of any "Product Development" in the order in which they happen?

4- What is the meaning of "Bidding" phase?
a- Coming up with a concept
b- Take the design development to construction documents
c- Finding prices from qualified builders or manufacturers
d- None of the above

5- What is the meaning of "Due Diligence"?
a- Testing the materials thru non-destructive methods
b- Finding out the rules and regulations that will facilitate or block the development of the
project
c- Write the bidding documents
d- None of the above

6- Where does the marketing and research fit in within the engineering field;
a- Almost everywhere when the product is being used by public
b- It has no place in the engineering field
c- Plays very minor role
d- None of the above

7- How many times is the billing rate larger than the pay rate (we are talking about generic types)?

8- Companies or corporations typically offer paid vacation and sick leave; where is this money calculated in your invoices to the clients?

9- It is best and recommended that you do not obtain approval from your client before you start the next phase of your project?

a- TRUE

b- FALSE

11- Which of the listed materials below are considered ancient materials?
a- Titanium
b- Silver
c- Stainless Steel
d- None of the above

12- What have been the "basic needs" by which human history has been shaped by: a-
b- c- d-
13- If the billing rate for someone in an engineering office is $150/hr, what is this person's payrate?
a- $25/hr
b- $32/hr
c- $50/hr
d- $65/hr

14- You have worked on a project for 40 hours in your office; your invoice to your client is $6,000; if your payrate is 1/3 of your billing rate, then what will be your payrate per hour and what is you paycheck for that week excluding any withholdings;
a- $50/hr, $2000 week
b- $55/hr, $2500 week
c- $65/hr, $4500 week
d- None of the above
15- Aqueducts are for transferring
a- Heat b- Oil

c- Gas d- Water

16- Write all the phases of engineering contract along with their abbreviations:

17- What were the problems regarding the use of "lead" in making plates, forks and knives?

18- Write 5 items that help an engineer keep up with the changes in his or her field;

19- What are the "Smart Metals":

20- Write ten by-product of oil that we use in our daily lives.

Reference no: EM13798545

Questions Cloud

Write summary of article a successful life without college : Write a summary of the article "A Successful Life Without College".
Describe the hazard type : Describe the task being performed when the risk might occur (washing dishes, moving a desk, etc.). Locate where the risk may occur (office, garage, etc.). Describe the hazard type
What is meant by civil society : Normal 0 false false false EN-US X-NONE X-NONE What is meant by civil socie..
Use of lead in making plates, forks and knives : Companies or corporations typically offer paid vacation and sick leave; where is this money calculated in your invoices to the clients?
Write a summary of the given article : Write a summary of the article "A Survey of Push and Pull Motivations of Green Event Tourists" by Yu-Fen Chen and Huai-En Mo.
Write a summary of the article aint i a woman : Write a summary of the article "AIN'T I A WOMAN".
Write an essay about my life as a drug peddler : Write an essay about My Life as a Drug Peddler.
Discuss what gdp is and what it measures : Discuss what the shortcomings (limitations) of GDP as a measure of well-being and welfare of a nation are?

Reviews

Write a Review

Other Engineering Questions & Answers

  What would the maximum possible voltage be

If the total range of voltages started at zero and there are 512 intervals, what would the maximum possible voltage be?

  Write procedures to manipulate queues

Write a procedure (make-queue) that produces independent first-in-first-out queue objects, using a message-passing style.

  Aircraft structure problem question in the attached

question in the attached file. ltbrgt1.the tapered stiffened beam below is loaded by forces s1 s2 and s3 as shown. the

  A small company is designing a new rigid commercial vehicle

a small company is designing a new rigid commercial vehicle. you are tasked with developing a spread sheet that allows

  Inspection planning problem

Formulate a binary linear programming model for the above inspection planning problem by defining you decision variables and writing the objective and objective function and the constraints in terms of your decision variables.

  Manufacturing planning

Define the nodes, what they represent, and node values and define the arcs, arc costs, arc capacities if any.

  Find the ultimate bod of the river water

Environmental engineering, CEE 357 Winter 2014. HW#6 Assignment: -  Find the ultimate BOD of the river water as it enters the lake. Find the value of the rate constant for BOD utilization in the river, k d,riv .

  Athens medical claims reengineering

Athens Administrators is an open indemnity claims administration services organization. Athens identified a growing trend of future medical claims within their client's population, descriptive statement and one (1) sample of a prescriptive statemen..

  Calculate heat capacity for both heat and cold flow

Calculate Heat capacity for both heat and cold flow - Since cold flow has higher heat capacity rate means hot flow has lower heat capacity rate

  Determine the initial gas in place

Determine the initial gas in place and what percentage of the initial gas in place will be recovered at a p/z of 1000?

  The completion of this assignment will entail the design of

the completion of this assignment will entail the design of the structural fire protection for a simple warehouse

  Determine the volume of seawater

CEE 357 Win 2014 HW#1:  What volume of seawater would have to be processed to recover one kilogram of silver, assuming an extraction process with 100% efficiency?

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd