Unforeseen conditions are a common occurrence for addition and remodeling projects. The architect and engineer complete as-built drawings by verifying the existing conditions. These as-built drawings are then used for the addition or remodeling project design. As the proposed drawings are completed and the construction has started there still may be problems that require attention.
Suppose that a remodeling project calls for the demolition of a wall. However, it turns out there is a roof drainpipe within the wall cavity that is selected for demolition. The roof drain is now located within an open area and requires the roof drain to be relocated. In your discussion response, answer the following questions:
• What are steps in the process to relocate the roof drain?
• What disciplines are required to assist in this relocation?
• Why didn't the A/E firm locate the roof drain during the initial filed work?
• Who pays for the relocation?
What system will you use to ensure that changes are properly posted in all copies of your EOP after it is distributed?
You are an analyst for a firm that imports and distributes specialty oils and vinegars, and your company wants you to evaluate its options for taking advantage of cutting-edge business analytics. What are its choices? What will you recommend?
Alternative One reduces wasted motion (walking) to 1% of total labor used on the assembly line. Physical lifting is reduced to no more then 12 pounds. Six people will be required on the assembly line. Productivity in finished goods per 8-hour shif..
Speculate on applicability of Gunelius's analysis to your business idea for this course. Do you think se trends will remain relevant through next decade. Illustrate what changes do you think will occur also explain why.
The key to event mitigation is establishing and maintaining a stable, relatively predictable environment. Control is lost and security breaches occur if the environment of the event is not stabilized.
Present an example of a business situation that you believe would lend itself to the use of a quantitative business model.
Describe managerial skills and behaviors that would be required to manage effectively in a functional department.
Define each component of an information system. Define how you can use the Five Component model to guide your learning and thoughts about information systems.
This reduction in demand will push equilibrium price back down to its original level. Since equilibrium price will remain unchanged, smokers will consume same number of cigarettes." Do you agree or disagree with this view. Explain.
descirbe millennium development goals (MDGs) current degree of progress/achievment in the USA or any other country ?
Consider the following Linear Programming Problem: MIN Z= 6x1 + 4x2 Graph an objective function line. What is the optimal solution? What is the optimal objective value?
Explain how could Stryker utilize insights gained from the experiences of the Freiburg team to address the ongoing quality problems with the actual orthopaedic implants.
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd