If bod5 and ultimate bod of a municipal wastewater are 200mg/l and 457 mg/l respectively what is the reaction rate constant? a) .265 b) .050 c) .115 d) .165
Land is extremely valuable in this area therefore to win this job you need to consider innovative approach to reduce the waste areas
A fluid flowing in a pipe 30cm in diameter has a uniform velocity of 4m/s. The pressure at the center of the pipe is 40KPa, and the elevation of the pipe's centerline above an assumed datum is 4.5m. Compute the total energy per unit weight of the ..
Develop a simple urban constructed wetland design.
There are many parallels between the industrialization of the United States after Reconstruction and the modernization of the American workforce in the last twenty to thirty (20-30) years as it transitions from industry to a service-oriented econo..
Determine the minimum distance from the diversion that a road sign should be located informing drivers of the temporary change on the highway. The letter height on the road sign is 5 inches.
Measurements indicate that to cause this flow the force acting on the contents of the control volume is 40i lb. Determine the net rate of flow of linear momentum through the control surface.
A slurry containing 20 percent by weight of limestone (CaCO 3 ) is processes to separate pure dry limestone from water. If feed rate is 2000kg/h, how much CaCO 3 is produced per hour?
An approach to a pretimed signal with a 60 sec cycle has nine vehicles in the queue at the beginning of the effective green. Four of the nine vehicles in the queue are left over from the previous cycle.
Find the expanded depth of the bed after the backwash when initial depth of the bed is 3 ft using given conditions. μ = 0.01g/cm/sec, T = 25oC, ρs = 2.65, ρ=1, washrate = 1.5 cm/sec, ks2 = 196. (Assumed single size)
Determine, for the crest and sag vertical curves required, the stationing and elevation of the PVCs and PVTs given that the PVC of the crest curve(on westernmost level highway section) is at station 0+00 and elevation 100 ft.
Critical review the decision making of a failed major construction/property project within the UK in the last ten years.
The tape is stretched over three equal spans. Calculate the tape corrections under the following conditions at field, temperature = 85ºF, pull = 18kg, E= 2.109 x 10 6 kg/cm 2
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd