Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
Vehicles arrive at a tollbooth according to the function λ(t) = 5.2 - 0.20t, where λ(t) is in vehicles per minute and t is in minutes. The toll booth operator processes one vehicle every 20 seconds. Determine total delay, maximum queue length, and the time that the 20th vehicle to arrive waits from its arrival to its departure.
CE 3303 – Solids – MWF – Spring 2014 - Homework Set 23, – The pipe shaft of the auger, rotating at a constant angular velocity, is subject to the axial force and torque shown. Determine the stress state at points A & B and show on a stress element.
A soil borrow material in its natural state in the ground has a unit weight of 118pcf. Its natural water content is 7%. What is the dry unit weight of this material?
An approach to a pretimed signal with a 60 sec cycle has nine vehicles in the queue at the beginning of the effective green. Four of the nine vehicles in the queue are left over from the previous cycle.
Samples of 20 rivets for a steel structure are checked for quality every hour. The probability of finding a bad rivet that has to be scrapped is 1%.assume that x is the number of parts in the sample of 20 that have to be scrapped.
Explain about pres-stressed concrete
Measure the distance PA, PB, PC etc. from p to various point with chain or tape and plot them to scale along the co responding rays. Join the points a, b, c, etc. to give outline of survey.
Using the USLE, estimate the annual erosion from a 100 ha. forested watershed assuming the following: R =112 tonnes/ha/year. The forest is in fair condition with 40% cover; Average slope is 3%; The soils are clay loam in hydrologic group C.
If the queue clears exactly at the end of the effective green D/D/1 queuing applies, determine the total vehicle delay in the cycle (in veh-sec) .
Differentiate between construction loan and mortgage loan based on your understanding (using your own words). Define the following terms in your own words: (a) cap rate, (b) economic value of a project, and (c) gap financing.
A dense sand has an effective friction angle of 43 and c'=0. A dry, 2.8-inch diameter sample is tested in drained triaxial shear with a confining pressure of 2500 psf. What axial load, P (in pounds), will be required to fail the sample?
A regular hexagonal pyramid has an upper base edge of 16 ft. and a lower base edge of 28 ft. if the volume of the frustum is 18041 ft^3., find the lateral area of the frustum.
A fluid flowing in a pipe 30cm in diameter has a uniform velocity of 4m/s. The pressure at the center of the pipe is 40KPa, and the elevation of the pipe's centerline above an assumed datum is 4.5m. Compute the total energy per unit weight of the ..
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd