A student wants to schedule a project using PERT. She has determined the following activities, precedence relationships and time estimates in days for the project. TIME estimate Exp Time Variance Act to tm tp te Vt a 4 6 7 5.83 0.250 b 1 2 3 2.00 0.111 c 5 5 5 5.00 0.000 d 7 9 12 9.17 0.694 e 2 4 8 4.33 1.000 f 6 9 10 8.67 0.444 1. Name all potential paths and their path durations. 2. Calculate ES, EF, LS, LF, and slack for all activities. 3. How many days can activity "c" be delayed without extending project duration? A company has developed a project and wants to accelerate (crash) the schedule if possible. Below network diagram and table show all information needed. Dotted arrow represents a “dummy” = no activity, but precedence. Partial crashing is available. 4. For the network, how many potential paths exist? 5. For present schedule, how long will project take? 6. What activity should be crashed first to accelerate the project by 1 day? 7. What activity should be crashed next to accelerate the project by another day? 8. What is the completely accelerated project duration after maximum crashing? 9. What is the total additional cost for reducing the duration by the maximum?
“How a firm behaves toward existing competitors is a major determinant of whether it will face entry by new competitors.” Explain.
What were their major concepts. Process of theory proposed. Process - Driven Quality Requirements
Consider what are the parameters and considerations that must be made when developing the employee schedules for the retail stores at Feets. Are there software packages to assist in this activity
Develop a five-year strategic plan with cost estimates and a time line and exhibits. Your plan should include/address the following points:
You are scheduled to interview with the Board of Directors for the open Chief Operating Officer position at Under Armour.
The coffee breaks are staggered, starting at 90 min into every shift. Meal breaks also staggered starting 3.5 hrs into every shift. Create a simulation model of this system. In the simulation, draw a simple layout of the above system.
Data collected on the yearly demand for 50-pound bags of fertilizer at Wallace Garden Supply are shown in the following table. Develop a 3-year moving average to forecast sales.
The Lynx Company uses a functional system for their sales system. It takes the orders from their salesmen in the field, processes those orders in the office, sends the information to accounting, and distributes the pick orders to the warehouse for pi..
Managing (or not managing) conflict in organizations is a key behavioral dynamic. How well do you feel organizations manage conflict? Please no copy and paste.
write a 700- to 1050-word executive summary that addresses the followingcompare and contrast scheduling approaches to
ABC sells no-spill syrup in bottles. Management is evaluating four different machines with standard deviations of .006, .01, .022, and .04 ounces for Machines A, B, C, and D, respectively. The specification limit is s 11.95 and 12.05 ounces. Which ma..
What are other benefits or what actions might a company do to keep a really valuable employee from leaving? Explain (again, use textbook concepts)
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd