The rocket assembly of the gauchito 7/8 scale

Assignment Help Other Engineering
Reference no: EM131834251

Locking Scope

In this Assignment, you will be taking the fully decomposed WBS found in your predecessor's "Gauchito Project Workbook.xls,"and familiarizing yourself with the full scope of the project, titling the project to distinguish your project from other projects in the portfolio, and indenting and renumbering the WBS numbers to reflect the priority of the project.

You may use Micrsoft Excel to accomplish this Assignment.

Review the Assignment instructions. Because you are the new PM for the Gauchito project, and the company is using the Gauchito EVM Tool your predecessor set up for this project, you will need to familiarize yourself with the tool immediately.

You were a team member during the planning stage of the Gauchito rocket project. The PM is now gone and the sponsor has made you the PM. The sponsor wants you to take the old PM's decomposed WBS, validate it, and align it with the other projects in the rocket assembly portfolio.

The Gauchito project is priority 5 out of 10 rocket assembly projects in the organization's portfolio of rocket projects for the scaled composites customer.

Here is what you will need to do:

Set up and familiarize yourself with the engineering specifications for the rocket assembly of the Gauchito 7/8 scale demonstration-validation rocket from your engineering specs following the Gauchito rocket assembly project.

If you need some refreshing with some of the Excel functions, go the Atomic Learning modules and become very familiar with this tool. Failure to do so may adversely affect your ability to properly conduct the qualitative and quantitative analysis required for successful completion of an industry standard EVM application.

Following the engineering specifications for the rocket assembly of the Gauchito 7/8 scale demonstration-validation rocket from your engineering specs in Excel to ensure there are no multiple activities and that the WBS numbering and indentation reflect the Gauchito Rocket Project Title as "5.0".

Reference no: EM131834251

Questions Cloud

Critical event or revelation that occurs in an indoor scene : Is there a connection that can be made between what happens in that scene and the theme of the whole story?
Determine why organizations can have higher productivity : Determine why organizations can have higher productivity when top managers encourage supervisors to set goals, assess performance, and provide feedback.
Impact of GST on tata tiscons supply chain : Prepare a report on Impact of GST on Tata Tiscons Supply Chain - Impact of GST on Indian Steel Sector
Washingto from up from slavery : Washington--from Up From Slavery, DuBois--from The Souls of Black Folk, and Ellison--"Battle Royal"
The rocket assembly of the gauchito 7/8 scale : Set up and familiarize yourself with the engineering specifications for the rocket assembly of the Gauchito 7/8 scale demonstration-validation.
Major contributing factor to the american revolution : That Crown Proclamation of 1763 set in motion Pontiac's Rebellion and, inevitably, was a major contributing factor to the American Revolution.
Explain how the emancipation proclamation : Explain how the Emancipation Proclamation changed the meaning of the Civil War. What were at least two specific developments
Define ethical implications of decision making : Companies and other organizations are faced with important, and often difficult, decisions all the time. These decisions, and the outcomes.
Previous calls to end slavery in the united states : How did the Abolitionist Movement that began in the 1830s differ from previous calls to end slavery in the United States?

Reviews

Write a Review

Other Engineering Questions & Answers

  Characterization technology for nanomaterials

Calculate the reciprocal lattice of the body-centred cubic and Show that the reciprocal of the face-centred cubic (fcc) structure is itself a bcc structure.

  Calculate the gasoline savings

How much gasoline do vehicles with the following fuel efficiencies consume in one year? Calculate the gasoline savings, in gallons per year, created by the following two options. Show all your work, and draw boxes around your answers.

  Design and modelling of adsorption chromatography

Design and modelling of adsorption chromatography based on isotherm data

  Application of mechatronics engineering

Write an essay on Application of Mechatronics Engineering

  Growth chracteristics of the organism

To examine the relationship between fermenter design and operating conditions, oxygen transfer capability and microbial growth.

  Block diagram, system performance and responses

Questions based on Block Diagram, System Performance and Responses.

  Explain the difference in a technical performance measure

good understanding of Mil-Std-499 and Mil-Std-499A

  Electrode impedances

How did this procedure affect the signal observed from the electrode and the electrode impedances?

  Write a report on environmental companies

Write a report on environmental companies

  Scanning electron microscopy

Prepare a schematic diagram below of the major parts of the SEM

  Design a pumping and piping system

creating the pumping and piping system to supply cool water to the condenser

  A repulsive potential energy should be a positive one

Using the data provided on the webvista site in the file marked vdw.txt, try to develop a mathematical equation for the vdW potential we discussed in class, U(x), that best fits the data

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd