Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
The Good parts Company produces a component that is subsequently used in the aerospace industry. The component consists of three parts (A, B, C) that are purchased from outside and cost 40, 35, and 15 cents per piece, respectively. Parts A and B are assembled first on an assembly line 1, which produces 140 components per hour. Part C undergoes a drilling operation before being finally assembled with the output from assembly line 1. There are in total six drilling machines, but at present only three of them are operational. Each drilling machine drills part C at a rate of 50 parts per hour. In the final assembly, the output from assembly line 1 is assembled with the drilled part C. The final assembly line produces at a rate of 160 components per hour. At present, components are produced eight hours per day and five days per week. Management believes that if need arises, it can add a second shift of eight hours for the assembly lines.The cost of assembly labor is 30 cents per part for each assembly line; the cost of drilling labor is 15 cents per part. For drilling, the cost of electricity is one cent per part. The total overhead cost has been calculated as $1,200 per week. The depreciation cost for equipment has been calculated as $30 per week.e. The product is sold for $4.00 per unit. Assume that the cost of a drilling machine (fixed cost) is $30,000 and the company produces 8,000 units per week. Assume that four drilling machines are used for production. If the company had an option to buy the same part for $3.00 per unit, what would be the break-even number of units?
Illustrate what is average time spent waiting in line to get to ticket window. Illustrate what is probability which re are more than two people in system? More than three people or more than four.
A bank has set a standard that mortgage applications be processed within a certain number of days of filing. If, out of a sample of 2,500 applications, 85 fail to meet this requirement, what is the epmo metric and what sigma level does it correspo..
Teams have different needs, and people in organizations should be selected for a team to ensure diversity and expertise to fill various roles. Study the nine team roles and share one role you personally played in a team. How did it go? Be sure to ..
How would each company determine the location of their facilities? List the specific needs and requirements of each company when determining location.
President Abraham Lincoln very succinctly explained his rationale for his condemnation of and opposition to slavery, to wit: "As I would not be a slave, so I shall not be a master." Lincoln's reasoning best exemplifies what ethical theory?
Put on your computer forensics hat and use your imagination to discuss various ways of convicting a criminal based on computer usage evidence.
What is the crossover point between the existing process and the proposed process? If the owner expects to sell 9,000 pizzas, should he get the new oven?
Should you play at all? (5%) If you play, what is your expected (net) monetary value? (15%)
Determine the coordinate of potential sites for hospital to be built at such distance of hospital to furthest town is minimizes. State any assumptions.
Assume a plant operates 2000 hours per year, demand for its parts is 100,000 per year and it takes a full 24 hours for a Kanban container
Project involves 12 activities and the precedence relationship is provided below in brackets. Draw an activity on arrow network to represent the project tasks and their dependence.
we have seen many changes and innovations in the application of technology to operations management in recent years.
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd