Tackling the problem of making tunnel

Assignment Help Civil Engineering
Reference no: EM1383444

You are a Project Manager on site where work for 3K.m. long Tunnel has been undertaken. The site is remote and takes about 2 days travel to nearest town. Supervisors, Technicians & Skilled Workers are engaged in dangerous / hazardous work. Absenteeism due to sickness, quarrels, drinking are adding to less output of work and chances of accidents on site are increasing. Management has urged to do something so that time targets can be achieved. Discuss how will you tackle the problem and increase the output of the work.

Reference no: EM1383444

Questions Cloud

Businesses not only respond and react to external forces : Businesses not only respond and react to external forces, but can also attempt to influence them
Some important biochemistry questions : he p K 1 , p K 2 , and pK R  of the amino acid lysine are 2.2, 9.1, and 10.5, respectively. The p K 1 , p K 2 , and pK R  of the amino acid arginine are 1.8, 9.0, and 12.5, respectively
Imagine that you are the chief operations officer : Imagine that you are the chief operations officer (COO) of Amazon.com. You are interested in creating a competitive advantage for your company (compared to other online retailers)
Executives at your company are now interested in motorcycles : Executives at your company are now interested in motorcycles with larger motors and would eventually like to produce motorcycles in the touring class
Tackling the problem of making tunnel : You are a Project Manager on site where work for 3K.m. long Tunnel has been undertaken. The site is remote and takes about 2 days travel to nearest town. Supervisors, Technicians & Skilled Workers are engaged in dangerous / hazardous work.
Technique to separates rna and dna : Discuss and explain why is it difficult to separate large amounts of RNA and DNA using gel electrophoresis?
Possible characteristic or property of sanstone : Give one possible characteristic or property of sanstone and of the quartzite that made you decide not to select it for your concrete project?
Describe the strategies which dupont''s management : Describe the strategies which DuPont's management used to respond to the ozone controversy before the 1978 ban. Identify the social costs and risks associated with these strategies and the populations that bore these costs and risks
Define cultural products and give three examples of them : Define cultural products, and give three examples of them. Identify how cultural products are considered in the development of a strategic plan.

Reviews

Write a Review

Civil Engineering Questions & Answers

  Total energy per unit weight of fluid

A fluid flowing in a pipe 30cm in diameter has a uniform velocity of 4m/s. The pressure at the center of the pipe is 40KPa, and the elevation of the pipe's centerline above an assumed datum is 4.5m. Compute the total energy per unit weight of the ..

  Analyze a structural system of a building

Use modern software tools to analyze a structural system of a building.

  Acceleration along a pathline

The velocity along a pathline is given by V (m/s) = s^2 x t^(1/2) where s is in meters and t is in seconds. The radius of curvature is 0.5 m. Evaluate the acceleration along and normal to the path at s = 2m and t = 0.5 seconds.

  A sewage treatment works stw

A sewage treatment works (STW) with 4 single-stage trickling filters has become organically overloaded due to the discharge of a biodegradable industrial effluent to the STW. This is causing effluent to pond on the surface of the filters.

  Minimizing the tension tab

What should TAC , TAB and the acute angle ? between TAB and the vertical to minimize the tension TAB ? Take o and W = 1,000 N. Hint: Consider various possible force triangles and decide on inspection how to minimize TAB.

  Total vehicle delay in the cycle with queueing diagram

If the queue clears exactly at the end of the effective green D/D/1 queuing applies, determine the total vehicle delay in the cycle (in veh-sec) .

  Strength to operate the pulley

If the difference in weight between the two baskets must greater than 15 lb they will not have the strength to operate the pulley. The King weighs 195 lb, the princess weighs 105 lb, and the prince weighs 90 lb.

  Mannering traffic and highway engineering

An approach to a pretimed signal with a 60 sec cycle has nine vehicles in the queue at the beginning of the effective green. Four of the nine vehicles in the queue are left over from the previous cycle.

  Projectile shot vertically upward

The height (in meters) of a projectile shot vertically upward from a point 2 m above ground level with an initial velocity of 24.5 m/s is h2+24.5t-4.9t^2 after t seconds. a) When does the projectile reach its maximum height? b) What is the maximum..

  Finding average time in system

If the time required to pay for parking is exponentially distributed with a mean of 15 seconds, find the average time in system.

  Percent by weight of limestone

A slurry containing 20 percent by weight of limestone (CaCO 3 ) is processes to separate pure dry limestone from water. If feed rate is 2000kg/h, how much CaCO 3 is produced per hour?

  Evaluate company performance in relation to GRI standards

Evaluate company performance in relation to GRI standards and comment on Stigler's theory.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd