Reference no: EM1368792
Discuss Earned Value Management (EVM) and Firm Fixed Price (FFP)
1. What is the Contracting Officer's (CO) role in Earned Value Management (EVM)?
2. For the following, choose whether you would use a Firm Fixed Price (FFP ) or a Cost Plus contract (and defend your choice):
o The removal of a malignant tumor from your brain.
o A physical exam required by your new employer as a condition of hiring.
o Arthroscopic knee surgery to repair damaged cartilage.
o Changing your car's oil.
o Fixing the loud, grinding noise your car makes whenever you start it on a very cold morning.
o Replacing your kitchen faucet with a new Moen Model X900 faucet.
o Eliminating whatever is causing water to leak through your basement ceiling.
o Treatment of a mysterious rash on your neck that itches terribly.
o Curing your recurring bouts of severe depression.
o Having a lawyer write a will for you.
o Having a lawyer defend you in an auto accident case in which the other party is claiming negligence on your part.
o Hiring someone to teach your daughter to play the violin well enough to get selected for the school orchestra.
|
Managerial decisions for company
: Higher unemployment caused by ression and higher prices have contributed to substantial reduction during 2008 in the number of vehicles on bridges, roads, and in tunnels.
|
|
Explain conclusions differ from recommendations
: Explain Conclusions differ from recommendations in that conclusions suggest what ought to be done about the facts
|
|
Design in c a unix utility program gasp
: Design in C a Unix utility program gasp. Command gasp [options] STRING FILE... must read listed files (FILE...) and copy each line from input to stdout if it contains STRING.
|
|
How high above the water was
: A car travelling at 19 {rm m/s} runs out of gas while travelling up a 21^circ slope. How far would the car go up the hill before it runs out of gas.
|
|
Show earned value management and firm fixed price
: Show Earned Value Management and Firm Fixed Price also defne what is the Contracting Officer's role in Earned Value Management
|
|
Solving population based question
: The Bureau of Labor Statistics announced that in February 2008, of all adult Americans, 145, 999,000 was employed, 7,381,000 were unemployed, and 79,436,000 were not in labor force.
|
|
Explain the lifecycle and the age to be in that lifecycle
: Explain the lifecycle and the age to be in that lifecycle and Describe nutritional challenges associated with that particular lifecycle.
|
|
Define the force exerted by water on the bottom
: A swimming pool has dimensions 32 m 9 m and a flat bottom. The pool is filled to a depth of 1.50m with fresh water. What is the force exerted by water on the bottom.
|
|
What is the minimum mass of the droplet
: A falling stone takes 0.28 s to travel past a window 2.2 m tall. From what height above the top of the window did stone fall.
|