Question 1 the terminal company is attempting to balance

Assignment Help Operation Management
Reference no: EM13380401

Question 1:

The Terminal Company is attempting to balance its assembly line of high-voltage electrical connectors. The desired output for the line is 50 connectors per hour, and the information on the work elements for this assembly line is as follows.

Work

Elements

Time (sec)

Immediate Predecessor(s)

A

40

--

B

36

A

C

20

A

D

25

A

E

30

B, C

F

34

D

G

35

E

H

 5

F

I

15

E, H

J

40

H

K

38

G, I, J

Use the information from Table 7.15 to balance this line. What is the most efficient solution?

Question 2

The Terminal Company is attempting to balance its assembly line of high-voltage electrical connectors. The desired output for the line is 50 connectors per hour, and the information on the work elements for this assembly line is as follows.

Work

Elements

Time (sec)

Immediate Predecessor(s)

A

40

--

B

36

A

C

20

A

D

25

A

E

30

B, C

F

34

D

G

35

E

H

 5

F

I

15

E, H

J

40

H

K

38

G, I, J


----------------------------------------------------------------------------------

 Use the information from Table 7.15 and the most efficient line balance possible. What work elements are included in the first station?

Question 3

The Terminal Company is attempting to balance its assembly line of high-voltage electrical connectors. The desired output for the line is 50 connectors per hour, and the information on the work elements for this assembly line is as follows.

Work

Elements

Time (sec)

Immediate Predecessor(s)

A

40

--

B

36

A

C

20

A

D

25

A

E

30

B, C

F

34

D

G

35

E

H

 5

F

I

15

E, H

J

40

H

K

38

G, I, J


----------------------------------------------------------------------------------

Use the information from Table 7.15, and assume that the most efficient line balance possible ha been achieved. What is the total idle time for an eight hour work day? 

Question 4

  1. 112. The production of a particular product consists of the following work elements. If the cycle time is 4 minutes and the work-element times are as follows, what is the theoretical minimum number of stations?

Work 

Time (min)

Element

1

2.4

2

0.5

3

2.1

4

2

5

2.7

6

1.1

7

2

8

2.7

9

1.6

10

1.4

   Question 5

  1.  Fun Vehicles, Inc. makes beach buggies on an assembly line. The total productive time to make one buggy is 300 seconds. The current line has a 90-second cycle time and consists of four workstations. The balance delay of this line must be

Question 6

An assembly line has to perform 10 work elements, whose time requirements follow. An operations analyst has found a solution using some heuristics, as shown in the table. If the cycle time of the line is 90 seconds, what is the efficiency of the assembly line?

 

 

Solution

Work

Elements

Time (sec)

 

Station

Work Elements Assigned

A

45

1

A, B, C

B

30

2

D, E

C

15

3

F, H

D

30

4

G, I

E

50

5

J

F

40

 

 

G

30

 

 

H

30

 

 

I

60

 

 

J

80

 

 

Question 7

  1. Table 7.13

The following information is given about an assembly line. The desired output rate is 90 units per hour.

Work

Element

Time

 (sec)

Immediate

Predecessor(s)

A

10

--

B

6

A

C

15

A

D

20

B

E

12

B

F

14

C, E

G

8

D

H

20

F, G

----------------------------------------------------------------------------------------

Use the information in Table 7.13. What is the fewest number of workstations that you need?

Question 8

The following information is given about an assembly line. The desired output rate is 90 units per hour.

Work

Element

Time

 (sec)

Immediate

Predecessor(s)

A

10

--

B

6

A

C

15

A

D

20

B

E

12

B

F

14

C, E

G

8

D

H

20

F, G

 
------------------------------------------------------------------------------------------

Use the information in Table 7.13. Suppose that the desired output rate is increased to 120 units per hour and a solution has been found that has four workstations. What is the efficiency of this new assembly line?

Question 9

A company makes four products that have the following characteristics: Product A sells for $75 but needs $20 of materials and $20 of labor to produce; Product B sells for $90 but needs $45 of materials and $20 of labor to produce; Product C sells for $110 but needs $50 of materials and $30 of labor to produce; Product D sells for $135 but needs $75 of materials and $40 of labor to produce. The processing requirements for each product on each of the four machines are shown in the table.

 

Processing Time (min/unit)

Work Center

A

B

C

D

W

8

4

12

10

X

12

9

10

6

Y

8

12

14

5

Z

10

9

5

5

Work centers W, X, Y, and Z are available for 40 hours per week and have no setup time when switching between products. Market demand is 50 As, 60 Bs, 70 Cs, and 80 Ds per week. In the questions that follow, the traditional method refers to maximizing the contribution margin per unit for each product, and the bottleneck method refers to maximizing the contribution margin per minute at the bottleneck for each product.

Question 10

A company makes four products that have the following characteristics: Product A sells for $75 but needs $20 of materials and $20 of labor to produce; Product B sells for $90 but needs $45 of materials and $20 of labor to produce; Product C sells for $110 but needs $50 of materials and $30 of labor to produce; Product D sells for $135 but needs $75 of materials and $40 of labor to produce. The processing requirements for each product on each of the four machines are shown in the table.

 

Processing Time (min/unit)

Work Center

A

B

C

D

W

8

4

12

10

X

12

9

10

6

Y

8

12

14

5

Z

10

9

5

5

Work centers W, X, Y, and Z are available for 40 hours per week and have no setup time when switching between products. Market demand is 50 As, 60 Bs, 70 Cs, and 80 Ds per week. In the questions that follow, the traditional method refers to maximizing the contribution margin per unit for each product, and the bottleneck method refers to maximizing the contribution margin per minute at the bottleneck for each product.

Reference no: EM13380401

Questions Cloud

Write three pages about dns and how we use dns within a : write three pages about dns and how we use dns within a windows server 2008 environment. in your paper please focus
1 consider the following code fragment for the mips five : 1. consider the following code fragment for the mips five stage pipelined processorinstruction1 add 1 8 3 1 8
Find the x-and y-intercepts ofline represented by the : find the x-and y-intercepts ofline represented by the equatics with stepy by step instructions and explained in
Question 1 a single ticket taker can tear tickets and : question 1 a single ticket taker can tear tickets and direct movie patrons to their seats at a rate of 90 per
Question 1 the terminal company is attempting to balance : question 1 the terminal company is attempting to balance its assembly line of high-voltage electrical connectors. the
S900 team development please write 1000 wordsin 1965 bruce : s900 team development please write 1000 wordsin 1965 bruce tuckman proposed four stages of group development. after his
I900 nbspmanaging diverse virtual teams nbspplease write : i900 nbspmanaging diverse virtual teams nbspplease write 1000 wordsas organisations merge and grow in a global
Question 1 the summerville vitamin company manufactures : question 1 the summerville vitamin company manufactures bottles of animal-shaped chewable vitamins for children. this
1 student tuition at abc university is 150 per semester : 1. student tuition at abc university is 150 per semester credit hour. the state supplements school revenue by matching

Reviews

Write a Review

Operation Management Questions & Answers

  Explain the concepts of lean production

Explain the concepts of lean production. Describe its relation to Six Sigma. Please provide examples of the pros and cons for linking them.

  Explain seldom performed even slightest investigation

explain seldom performed even slightest investigation of property before recommending it to managing members. Eric also purchased a couple of rental properties on his own account.

  Who in the organization needs to be involved in designing

Who in the organization needs to be involved in designing and implementing a MRP system?

  What has been the impact of the law

One of the consequences of the terrorist attack of 9/11 was the passage by Congress of the Patriot Act. From an HR perspective, what has been the impact of the law? Should Americans be asked to give up privacy for national security?

  Adding a room to your home

Using alternatives specified in the PMBOK® Guide, discuss what kind of contract pricing might be best for the following procurement situations. Arrange to select a topic "round-robin style" so that you select the next topic that has not already been ..

  Determine the best defense against payment

Pete, a Quality Company employee, is authorized to use Quality checks to buy supplies. Pete alters one of the checks to increase its $700 amount by $100, and exchanges it at Retail Office Supply for $700 worth of supplies and $100 cash.

  What would you do in hannas place

What would you do in Hanna's place?

  Why capitalism has changed

Does the story of the American fur company hint at how and why capitalism has changed and has been changed over the years?

  Identify sources of risk for each member of buying center

Assume that you make scanners and this situation is pretty typical of what you would find. How would this information influence your marketing activities? Be as specific as possible.

  What type of steel should be used to construct the bridge

What type of steel should be used to construct the bridge?

  Case study - new york city resident

In April, Burt, a New York City resident, asked Amy, a 16-year old paid intern for his company, to go to Tours, Inc. (Tours), a travel agency, and book a vacation trip for him in early June.

  What is the concurrent engineering approach

what is the concurrent engineering approach and why should project managers be aware of it?

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd