Reference no: EM132822814
Project Management Assignment
You have been assigned as the Project Manager to oversee the maintenance requirements for The James River Bridge and the Hampton Roads Bridge Tunnel in Virginia. You also have the flexibility to determine the time frame (how long the maintenance will require). The Project Manager will authorize the work that must be done and provide the following project elements in a detailed statement that will explaining each area: The eight maintenance items you need to discuss is for the james river bridge: electrical lighting, grates, inspection structure, greasing hydralic motors, and pot hole repair. For the hampton bridge tunnel: structure inspection, cleaning of the celing and walls, electrical lighting, pothole repairs, emergency broadcasting inspection.
1. Contract requirements: a general structure of mangerial, reporting and performing responsisbilities, , suppliers, subcontractors,managerial requirements and agreements, and reporting requirements.
2. Schedules: A list of of all major events, tasks, and subschedules, from which a master schedule is devepoled
3. Resource: The overall project budget for all resource requirements and procedures for budgetary control.
Manual system for managing information
: You are the senior technician in an expanding laboratory. You have been using a manual system for managing information and storing data.
|
Expanding the talen pool-recruitment case study imprimax
: Imprimax is a family business, specializing in commercial printing, that has been operating for more than 45 years. The founder's son, who now heads the company
|
What is maximum amount of cca hector will be able to claim
: What is the maximum amount of CCA Hector will be able to claim this year? Hector has two residential rental properties that are mortgaged
|
Calculate Gross Profit and Closing Inventory using LIFO
: Labor = 20000 Rs per 5,000 units. Overheads = 50% of total labor cost. Calculate Gross Profit and Closing Inventory using LIFO and FIFO
|
Project management project
: Project Manager to oversee the maintenance requirements for The James River Bridge and the Hampton Roads Bridge Tunnel in Virginia.
|
What was bennett basis in fedderman shares
: What was Bennett's basis in Fedderman shares for determining gain or loss from the sale to Gibbs? Bennett and Malik each owned 100 shares of 200 issued shares
|
Calculate income from continuing operations
: Gain on sale of FV-NI investments (before tax), $14,400; loss from operation of discontinued division (net of tax), $40,200; Calculate income from operations
|
What is the purpose of the national employment standards
: What is the purpose of the National Employment Standards in reference to employers and employee rights and responsibilities.
|
Explain the value of identifying one strengths
: Explain the value of identifying one's strengths, weaknesses, habits, and behavioral patterns and include examples of how this can increase personal growth
|