Reference no: EM131337065
Co-op training report - industrial engineering
Help me with the coop training report. I trained in logistic company and I need to summarize my train in one report.
My company is LSS warehouse logistic company. Company website: https://www.lss.com.sa
- That what I have for this report , you can add more projects if you have more ideas.
- About Measurement, you can assume numbers from the internet.
- You can take ideas from the old reports that I uploaded to you
Project 1: Inspection quality problem using DMIAC
Subject: delay inputing out the material if their is a quality failure.
Problem: After a quality inspection failure, the company sending email to the client waiting to get replay to take the responsibility to the handle shipment.
Solution: All employs /Material Handel should be trained / given proper training to handle any quality failure or taking the responsibility to react in such situation. Later will inform to the client regarding the quality failure.
This problem I want to love it by DMAIC
Define the problem:
Measurement:
Shipment arrival time
|
Quality inspection time
|
Quality inspection statues
|
inform to client
|
Putout time
|
9:30 AM
|
9:35 AM
|
FAIL
|
9:45 AM
|
4:00 PM
|
10:30 AM
|
10:35 AM
|
PASS
|
NA
|
10:55 AM
|
|
|
|
|
|
etc.. for 10
|
|
|
|
|
Analyzing: You can check ISE 323 Project in analyzing part.
Improve: Is the solution of the problem.
Project 2 - Packaging design
Problem: The Company using a machine that takes a long time for packing also it can be damaged also it can be fall during transport by forklift.
They use this machine:
https://www.rocketindustrial.com/stretch/wrappers/manual/fox-manual-stretch-wrapper.html
Here we have to design for two things:
1- Packaging machine
They use this machine: https://www.rocketindustrial.com/stretch/wrappers/manual/fox-manual-stretch-wrapper.html
Designing should be similar way that we have in the old reports.
2-forklift design
They use this forklift which is old one (cannot go backward, limit load, and more disadvantages that you related to our problem (pack can be fall during transport)).
Project 3 -
Problem is when you have a longer FiFo lane but not enough space on the shop floor. In this case, you may break the FiFo lane into different parallel segments.
LSS is using Drive in racking system
Their are systems that is better than Drive in racking system:
- Shuttle system
- Selective racking system
This project can be solved by facility planning.
Assignment Link - https://www.dropbox.com/s/pewqshz7oylv26w/Assignment.rar?dl=0
Do you agree with her valuation recommendation
: What constant growth rate would that analyst recommend using if she believes in capital market efficiency and the Capital Asset Pricing Model? Do you agree with her valuation recommendation? Why or why not?
|
Procurement planning and project management process
: Running short on a deadline. Procurement class. Can someone: Examine the relationship between procurement planning and the project management process groups and knowledge areas defined in the 2013 A Guide to the Project Management Body of Knowled..
|
Find and report cost of equity capital for large size firms
: Find and report the cost of equity capital for large-size firms in one of the sample industries and then compare it to the cost for small firms in the industry.
|
Determine the allowable electrical power dissipation
: A vertical array of circuit boards of 150-mm height is to be air cooled such that the board temperature does not exceed 60°C when the ambient temperature is 25°C.
|
Project - inspection quality problem using dmiac
: Project 1: Inspection quality problem using DMIAC. Subject: delay inputing out the material if their is a quality failure. Problem: After a quality inspection failure, the company sending email to the client waiting to get replay to take the respons..
|
Define market research and describe the importance of that
: Define market research.If your selected company uses marketing research, identify the different types of marketing research it uses and describe the importance of that research to the company using the provided template.
|
Capital gain of the tips in percentage terms
: TIPS Capital Return Consider a 2.75% TIPS with an issue CPI reference of 184.60. At the beginning of this year, the CPI was 191.70 and was at 201.60 at the end of the year. What was the capital gain of the TIPS in percentage terms? (Do not round t..
|
Explain the relationship between leadership and control
: Explain the relationship between leadership and control. Explain what is meant by the phrase "in the flow." Identify and explain two methods or ways to increase skill and competency.
|
The expected return on the market portfolio
: Acetate, Inc., has equity with a market value of $23.1 million and debt with a market value of $9.24 million. Treasury bills that mature in one year yield 6 percent per year, and the expected return on the market portfolio is 11 percent. The beta of ..
|