Production of sub-assemblies in lot sizes

Assignment Help Operation Management
Reference no: EM13806624

Read "Space Age Furniture Company".  Must be 10 to 12 double-spaced pages in length.  Respond to the following and include any Materials Requirement Planning (MRP) calculations:

a. Develop an MRP for Space Age Furniture Company using the information in the case including the production of sub-assemblies in lot sizes of 1,000.

b. The lot size of 1,000 for sub-assemblies has produced a lumpy demand for part 3079. Suggest ways for improvements over sub-assemblies in lot sizes of 1,000.

c. Analyze the trade-off between overtime costs and inventory costs.

d. Calculate a new MRP that improves the base MRP.

e. Compare and contrast the types of production processing-job shop, batch, repetitive, or continuous-and determine which the primary mode of operation is and why.

f. Describe ways that management can keep track of job status and location during production.

g. Recommend any changes that might be beneficial to the company and/or add value for the customer.

Also:

1. What options are open to Coral to address this problem?

2. How would reducing the minimum quantity of subassemblies help?

3. What are the costs of carrying excess items in inventory at each stage?

4. What is the trade-off between overtime costs and inventory costs?

Space Age Furniture Company

The Space Age Furniture Company manufactures tables and cabinets to hold microwave ovens and portable televisions. These products are made in various sizes and with various features, but all follow basically the same production and assembly operations. However, two of these products-the Saturn microwave stand and the Gemini TV stand-have a part (no. 3079) that requires machining on a special lathe used only for making that part. At present the machine is run by Ed Szewczak, a machinist who also operates other machines in Space Age's shop. Once set up and started, the lathe can run nearly unattended. However, the machinist must be present (even if not actually attending the machine) any time one of the machines, including the lathe, is in operation. At present, Ed works a regular 40-hour week. However, due to the workload for producing part 3079, it has been necessary to schedule frequent overtime for him in order to finish the necessary parts on time.

Coral Snodgrass, operations manager for Space Age, has just heard from Ed's foremen that Ed is becoming unhappy about so much overtime. As Coral knows, Ed has been with the company a long time and is an excellent, reliable employee. Skilled machinists with Ed's experience and employment record are extremely difficult to find. Coral wonders what can be done to alleviate this problem.

Recently, Space Age began using an MRP system that has helped reduce inventories greatly and improve on-time deliveries. In fact, Space Age carries no finished-goods inventory. Instead, everything in the master schedule is being produced for customer orders, so all products are shipped almost immediately. Previously Space Age had estimated that it cost $1.25 per week to store each Gemini and $1.50 per week to store each Saturn that wasn't shipped immediately. The master schedule for producing these two items for the next six weeks is shown below.

Master Schedule

Week

 

1

2

3

4

5

6

Gemini

600

400

700

500

400

600

Saturn

300

400

400

600

300

300

The part in question, 3079, is used in two different subassemblies: no. 435, which is used in the Gemini TV stand, and no. 257, which is used in the Saturn microwave stand. One of part 3079 is used in each subassembly, and one of each subassembly is used in each of the final products.

Part 3079 may be produced in any quantity since the lathe that makes it is not used for anything else. However, both of the subassemblies are produced using the same equipment. To minimize change over time, Space Age has decided that these subassemblies should be made in minimum quantities of 1,000 at a time, although there is no problem with capacity on the equipment that makes them. In fact, an order for 1,000 of subassembly 435 is due to be received in week 1, as is an order for 1,000 of subassembly 257. Lead time for both these subassemblies is one week, and no inventory is expected to be on hand for either part at the beginning of week 1. There is not any on-hand inventory of part 3079, and there are no orders in process.

Ed Szewczak earns $22 per hour and gets a 50% premium for any overtime work. Whenever part 3079 is made, there is no set-up time, but processing takes 0.03 hour per unit. It costs $0.25 per week to hold any of these parts over from one week to the next. The cost of holding each subassembly in inventory is $0.75 per unit per week.

5. What options are open to Coral to address this problem?

6. How would reducing the minimum quantity of subassemblies help?

7. What are the costs of carrying excess items in inventory at each stage?

8. What is the trade-off between overtime costs and inventory costs?

Reference no: EM13806624

Questions Cloud

Thinking about and working-information technology problems : Throughout the duration of this course, you have been thinking about and working through information technology problems. The final project will APPLY the steps of analyzing, evaluating, and designing a solution to the information system problem.
Competence and core competence of selected company : State what you believe is the distinctive competence and core competence of your selected company. Give an example of how the values and mission statement help to shape planning.  Also give some internal and external factors that may influence the ..
Procedures for the negotiation of a government contract : The FAR Part 15 provides the policies and procedures for the negotiation of a government contract. These guidelines protect both the government and the organization that submits a proposal for consideration, whether a competitive or other-than-com..
Use of social media online based problems : What is the probability that the person thinks that "Made in America" ads boost sales and uses social media online?
Production of sub-assemblies in lot sizes : Develop an MRP for Space Age Furniture Company using the information in the case including the production of sub-assemblies in lot sizes of 1,000.
Design a modularized body mass index program : You are the nutritional coach for a local high school football team. You realize that some of the players are not up to par having returned from summer break. Realizing nutrition plays a key in a productive team, you decide to implement a Body Mas..
Create risk responses : Create risk responses (reduce probability, reduce impact, and respond) for each of the 15 risks you identified and assessed in the prior unit.
Case of supply chain management : Both the operations manager and the warehouse manager have been impressed with your argument in making a case of supply chain management and quality management within the company.
Changes in employment relationships : What changes in employment relationships are likely to occur as the population ages? Do you think increasing age diversity will create new challenges for managers? What types of challenges do you expect will be most profound?

Reviews

Write a Review

Operation Management Questions & Answers

  Recently launched a quality improvement initiative

Identify a business that has recently launched a quality improvement initiative (Harley Davidson would be just one of many examples). Your business could be one that is primarily product-providing or one that is primarily service-providing. Do some i..

  Illustrate what can a organization do to detect

Illustrate what can a organization do to detect also combat the efforts of unscrupulous foreign suppliers to deceive inspection/compliance teams.

  Use the data set to setup the control limits for the hides

lazy b ranch produces leather hides for use in the furniture and automotive upholstery industry. the company has taken

  Uses a two card kanban production system

Super seven Corp. uses a two card kanban production system. Inventory levels are roughly proportional to the number of kanbans. For one part, the average usage rate is 1,400 parts per day, container size is 50 parts, and cycle time per batch is 2 hou..

  Global standardization strategy and localization strategy

Based on your country of choice, develop scenarios where firms may invest in your country using the following strategies: Global standardization strategy. Localization strategy. Transnational strategy

  Determine optimal order size also minimum annual total cost

Annual cost of carrying a pound of cheese in a refrigerated storage area is $12. Determine optimal order size also minimum annual total inventory cost.

  Describe and define the system archetype

Describe and define the System Archetype being reflected in this current issue. Then, based on the "Seven Action Steps" associated with that Archetype, describe the fix you would implement to offset the archetype. Include as many potential solut..

  Define the scope of the business process outsourcing

define the scope of the business process outsourcing transaction and discuss the importance of each in relation to outsourcing

  Expalin how has scope creep influenced a project on which

scope creep happens when requirements even small ones are added to a project without regard for how they affect the

  What is the value of the coefficient of determination

What is the value of the coefficient of determination in this problem? What does this mean?

  Show percent productivity change for labor and investment

a. Show the productivity change, in loaves per dollar, with an increase in labor cost (from 640 to 800 hours). b. Show the productivity change with only an increase in investment ($100 per month more). c. Show the percent productivity change for l..

  Customer service representative job description

Describe up to 10 bulleted details that should be found in a customer service representative job description. What level of education and experience should be necessary for a customer service representative, and why

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd