Produce a project plan for building a house

Assignment Help Civil Engineering
Reference no: EM13841647

Tasks:

1. Produce a project plan for building a house. Follow the phases and tasks shown on the web page. You can click on each to see background information on that phase or task, so you can better understand it. You can present this project as a "Project Task Sheet" using Excel. Include the following in your sheet:

• Provide each task with a task ID number

• Show phases, tasks and sub-­-tasks - use indentation of the tasks to represent this. Each takes a single row in the spreadsheet.

• Show the prerequisites for each task - set up a column with the taskIDs of any pre-­-requisites for each task.

• Provide a "Procurement" column. Mark the task with X in this column if the task is a procurement phase/task/sub-task.

• You do not need to arrange tasks in strict chronological order, but do try and make it logical and easy to read.

• Add a column called "comment". This can be left blank for nonprocurement tasks.

2. For each of the tasks you find, highlight those that are procurement-related and consider the dot points below. Where procurement-related tasks should be used (but are not mentioned), add detailed procurement/purchasing tasks that must be undertaken and create tasks to represent these.

• If the tasks are extra to those in the website, add these tasks to your Project Task Sheet

• Integrate new tasks with the other tasks

• Highlight all procurement tasks with X in the "Procurement" column

• In the "comment" column for each procurement task, write 2 to 3 sentences explaining:

• what the task is

• the forms/templates/documents associated with it (see next section). You can use the document's "reference number"

• Methods for ensuring integrity of the task (eg. Sign-offs, inspections, etc).

3. Provide a list of procurement-related documents that are associated with your procurement plan.

• You should create a useful title for each document.

• You do NOT need to design the documents - only the title is required.

• Provide a one sentence description of the document's purpose

• You may wish to create a document "reference number"

• Cross reference this list with the procurement tasks in your project plan

• You can put this list in the same spreadsheet as the plan.

In designing your procurement plan, consider that it needs to:

• Define Requirements

• Select Suppliers

• Produce Agreement

• Administer Day-to-Day

1. Procurement Integration Assignment (Individual)

In this assignment you will integrate procurement tasks into a project. Have a look at the following website: https://www.infoforbuilding.com/build-­-a-­-house.html. It outlines the steps required to build a house. Note that is also offers materials for sale. You are NOT required to purchase anything from this site. Use it only for information to complete your project.

Tasks:

2. Produce a project plan for building a house. Follow the phases and tasks shown on the web page. You can click on each to see background information on that phase or task, so you can better understand it. You can present this project as a "Project Task Sheet" using Excel. Include the following in your sheet:

a. Provide each task with a task ID number

b. Show phases, tasks and sub-­-tasks - use indentation of the tasks to represent this. Each takes a single row in the spreadsheet.

c. Show the prerequisites for each task - set up a column with the taskIDs of any pre-­-requisites for each task.

d. Provide a "Procurement" column. Mark the task with X in this column if the task is a procurement phase/task/sub-task.

e. You do not need to arrange tasks in strict chronological order, but do try and make it logical and easy to read.

f. Add a column called "comment". This can be left blank for nonprocurement tasks.

3. For each of the tasks you find, highlight those that are procurement-related and consider the dot points below. Where procurement-related tasks should be used (but are not mentioned), add detailed
procurement/purchasing tasks that must be undertaken and create tasks to represent these.

a. If the tasks are extra to those in the website, add these tasks to your

Project Task Sheet

b. Integrate new tasks with the other tasks

c. Highlight all procurement tasks with X in the "Procurement" column

d. In the "comment" column for each procurement task, write 2 to 3 sentences explaining:

i. what the task is

ii. the forms/templates/documents associated with it. You can use the document's "reference number"

iii. Methods for ensuring integrity of the task (eg. Sign-offs, inspections, etc).

In designing your procurement plan, consider that it needs to:

• Define Requirements

• Select Suppliers

• Produce Agreement

• Administer Day-to-Day

Your mark will be based on the strength of your plan, its integrity, and its efficient integration into the project. A marking guide will be issued shortly on BB.

2. Project procurement Assignment (Individual)

In this assignment you will create a Request For Tender (RFT) document that is to be issued to a single sub-­-contractor to build all aspects of a large residential house such as the one in the individual integration assignment.

You should consider the following in preparing this RFT:

• You will need to research formats for the RFT document you will be producing. This will include an understanding of what the sections of an RFT should be and what should be included in it (and what shouldn't)

• Refer to the "Individual Integration Assignment" to help you plan your RFT.

• You need to make the RFT realistic but it does not have to be precise, and you can make assumptions.

• Your RFT should also address the assessment process.

3. Case Analysis (Individual)

They report on the aspects of massive problems for the National Broadband Network (NBN) project.

Using the principals you have learnt in this unit, and researching relevant information related to this project, answer the following questions:

1. What are the procurement problems you found in this case

2. For each problem you found, what solution would have prevented it.

Support this with at least one external reference (not the text book).

3. What are the complications that large, nationally important projects impose on the procurement process.

Approximately 10 Pages in length.

Reference no: EM13841647

Questions Cloud

What is dumping and why is it considered anti competitive : What is whistle blowing and what are the concerns about this practice. What is dumping and why is it considered anti competitive. Does the United States allow dumping
Identify relevant major processes in an apparel factory : Identify relevant major processes in an apparel factory. (you need a web survey). List and prioritize the processes suitable for conversion to a CIM environment.
Draw a ppf-budget constraint-indifference curve diagram : Draw a PPF-Budget Constraint-Indifference Curve diagram for each country that shows the autarky (no-trade) equilibrium, indicate what the country is producing and consuming in each equilibrium and the relative prices in this equilibrium.
Phenomena on the world market for loanable funds : Illustrate the effect of these phenomena on the world market for loanable funds. Which way does this argument predict the interest rate to adjust?
Produce a project plan for building a house : Produce a project plan for building a house. Follow the phases and tasks shown on the web page. You can click on each to see background information on that phase or task, so you can better understand it
Data management-erd diagram definition : The entity relationship diagram is crucial to the  creation of a successfully implemented application and database. A good understanding of how to identify the components that define the Entity Relationship Diagram is needed. Select one of the fol..
The fed raise the federal funds rate : What were the immediate consequences of this decision on the financial markets on Thursday and Friday. Was this anticipated to be the reaction. If the Fed was convinced that the economy was developing moderately, why not raise rates and why should..
E-commerce transaction : Question 1: Suspicious e-commerce transaction includes orders placed by a customer in one country that are shipped to another country. In fact there are no such orders in the Northwind db,  so create a few by modifying some of the "Germany
Calculate the rate of growth of real gdp : Show nominal GDP, the GDP price index for the data above for any 10 years; make sure that one of the years is the base year. Put both real and nominal GDP I the same graph.

Reviews

Write a Review

Civil Engineering Questions & Answers

  Compute the required weight of coarse aggregate per cubic

A concrete mix with a 3-inch slump, w/c ratio of 0.50 and a sand with a fine modulus of 2.4 contains 1700 lb/cubic yard of coarse aggregate. Compute the required weight of coarse aggregate per cubic yard.

  Find dimension parameters that affect the drag coefficient

The flow is incompressible, but friction and inertia influences the flow pattern. Use dimensional analysis. Find the dimension parameters that affect the drag coefficient.

  How will the operator change affect the oxygen requirement

an operator at a wastewater treatment plant decided to increase the SRT from 5 days to 10 days. How will this change affect: a) the oxygen requirement b) MLVSS in the aeration tank.

  Determine the normal depth-velocity and the froude number

A PVC pipe with a diameter of 30 inches will carry a flow of 20 cfs. the bottom slope is 0.005 and the roughness coefficient is 0.015. determine the normal depth, critical depth, velocity and the froude number.

  Find the distance downstream to the location

Water enters a very wide rectangular channel (Manning’s n = 0.0149) at a velocity of 12.2 ms-1 and a depth of 0.61 m. An H3 curve forms downstream and the water jumps to a depth of 2.4 m some distance downstream. Find the distance downstream to the l..

  Find what is the temperature of the water-steam mixture

A pressure cooker maintains a constant pressure while food cooks in a water-steam mixture. If the pressure is higher than atmospheric, the water in the cooker boils at a higher temperature and makes cooking faster.

  What is the steady-state concentration of radon in the house

Consider a house into which radon is emitted through cracks in the basement. The total volume of the house is 650 m3 (assume that the volume is well mixed throughout).

  Estimate the rate of heat transfer from the compressor

50 kmol per hour of air is compressed from p1 = 1.2 bar to P2 = 6.0 bar in a steady-flow compressor. Delivered mechanical power is 98.8KW. Temperature and velocities are: T1= 300K T2= 520K u1= 10m s^-1 u2= 3.5m s^-1

  Calculate the wet density in pounds per cubic feet

A small chunk of the original sample had a wet weight of 140.9 grams and weighed 85.2 grams after drying. Compute the water content, using the correct number of significant figures.

  What is the maximum exiting velocity and maximum height

A fireman reduces the exit area on a nozzle so that the velocity inside the hose is quite small relative to the exiting velocity. What is the maximum exiting velocity and what is the maximum height

  Determine what is the darcy velocity of the groundwater

An unconfined, gravel-sand aquifer has a porosity of 0.23, and a hydraulic conductivity of 1000 m/day. Two monitoring wells are 260 m apart, and the difference in their water levels is 0.3 m.

  What is the concentration of the mixture of the stream

Directly below the discharge point is a prime fishing spot and the fish are intolerant to salt concentrations above 200 mg/L. How much salt should be removed per day from the plant effluent stream in order to maintain a concentration of salt

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd