Process of designing a stormwater management system

Assignment Help Civil Engineering
Reference no: EM13709233

A catchment area consist entirely of loamy sand, which typically has a saturated hydraulic conductivity of 30 mm/h, average suction head of 61 mm, and porosity of .44. Prior to a rain event the soil has an initial moisture content of θi = 0.076. The catchment area is estimated to have a depression storage of 5 mm. You are in the process of designing a stormwater management system to handle the runoff from this area, and have selected the following 1-h storm as the basis of your design:

a) The time of ponding (tp, minutes)

b) The infiltration depth (F) generated by the design storm,

c) The infiltration rate (f) of the soil at the end of the storm,

d) The volume of runoff (Q, m3) generated by the design storm.

1043_Process of designing a stormwater management system.png

Reference no: EM13709233

Questions Cloud

What is the capacitance of capacitor b : Capacitor A and capacitor B both have the same voltage across their plates. However, the energy of capacitor A can melt m kilograms of ice at 0°C, What is the capacitance of capacitor B
Determine the decrease in exergy of the steam : Steam is throttled from 9 MPa and 500V to a pressure of 7 MPa. Determine the decrease in exergy of the steam during this process. Assume the surroundings to be at 25C.
Estimate what is the kinetic energy of the electron : An electron is released from rest at the negative plate of a parallel plate capacitor and accelerates to the positive plate. What is the kinetic energy of the electron just as it reaches the positive plate
Calculate the flow into the well : The permeability in the reservoir is a constant 200 mD. The pressure in the reservoir is 3000 psi. The reservoir is 100 m thick. A 6-inch well is drilled through the reservoir, which has two effects. First, the rock within 5 ft of the well is damaged..
Process of designing a stormwater management system : Process of designing a stormwater management system to handle the runoff from this area, and have selected the following 1-h storm as the basis of your design.
Power cycle operating between hot and cold reservoirs : The data listed below are claimed for a power cycle operating between hot and cold reservoirs at 1500 K and 450 K, respectively. For each case, determine whether the cycle operates reversibly, operates irreversibly, or is impossible.
How far is the boy from the nearest tree : A rope is attached between two trees with a boy hanging from it. The trees are 9.3 m apart and while the boy is hanging onto the rope, How far is the boy from the nearest tree
Determine what the charge of the particle : A moving particle encounters an external electric field that decreases its kinetic energy from 9460 eV to 6990 eV as the particle moves from position A to position B. Determine the charge of the particle
Air enters the turbine of a gas turbine : Air enters the turbine of a gas turbine at 1200 kPa and 1200 K, and expands to two stages. Between the stages, the air is reheated at a constant pressure of 350 kPa to 1200 K. The expansion through each turbine stage is isentropic.

Reviews

Write a Review

Civil Engineering Questions & Answers

  How to design for a cultivated land with sandy loam soil

The bund channel is to be formed by the embankment only. The horizontal distance between two bund s is 50 m. The 1-hr rainfall expected during the recurrence interval of 10 yrs is 8 cm/hr.

  Determine the actual field weight required to mix a 4 bag

Determine the actual field weight required to mix a 4 bag mix using the mix proportions given below. The excess moisture contet of the sand is 6% and that of the gravel is 2% Component Weight ..

  Determine the evaporation rate for a reservoir if the wind

Determine the evaporation rate for a reservoir if the wind speed is 40 mph and the surface temperature is 15 degrees Celsius and the overlaying temperature is 25 degrees Celsius. and the relative humidity is 30 percent

  Which the trailing vortices move downward under their own

An airplane with a weight of 10,000lb/f is flying at 600ft/s at36,000ft., where the airplane pressure is 3.3 p.s.i.a. and thetemperature is -67 degrees F. The lift coefficient is 0.2. The spanof the wing is 54 ft. Calculate the wing area and minimum ..

  What should be the surface area of each tank

Do the problem again but for an alum or iron floc with an overflow rate 20 m3/day.m2?

  Find reservoir in acre-ft that would be required to contain

A hurricane has an average rainfall of 9 in over a 200 mile^2 watershed. What is the reservoir in acre-ft that would be required to contain 20% of the rain completely

  Find what is the op amp output voltage with a digital input

The reference current for the DAC0808 is 2.0 mA. With the DAC output connected to the inverting input of an op amp with a feedback resistor of 5.0 kohms, what is the op amp output voltage with a digital input of 0x80

  Temporary change on the highway

Determine the minimum distance from the diversion that a road sign should be located informing drivers of the temporary change on the highway. The letter height on the road sign is 5 inches.

  Determining maximum acceleration and maximum velocity

The posItIon of a particle along a straight line is given by s = (t 3 - 9t 2 + 1St) ft, where t is in seconds. Determine its maximum acceleration and maximum velocity during the time interval 0 :5: t :5: 10 s.

  Find the hydraulic conductivity of the aquifer

Drawdown at an observation well 15m from the pumped well is 3.0 m and a drawdown at a second observation well 150 m away is 0.30 m. Find the hydraulic conductivity of the aquifer.

  What would be the corresponding increase in kinetic energy

A "slap shot" in the game of hockey can cause an increase in the velocity of a 5 oz puck from 2 ft/sec to 110 ft/sec. What would be the corresponding increase in the kinetic energy (ft-lb) of the puck.

  Uniform deterministic arrival rate

Processing begins when the lane reaches capacity, what is the uniform deterministic arrival rate if the vehicle queue is cleared in 35 minutes after vehicles begin to arrive (in veh/min.)?

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd