Process flow diagram and identify the bottleneck

Assignment Help Operation Management
Reference no: EM131350411

A cost effective alternative to a foodtruck is the "elTACOBIKE", which requires some assembly. Each year, the manufacturer receives many requests to assemble the elTACOBIKE for their franchise owners, which they are happy to do for an assembly fee. The manufacturer has hired four workers to do the assembly. Doug removes the parts from the carton, which takes about two minutes, and lays them out at one end of three long work tables, checking to make sure that all parts are present. The layout and checking process takes about four minutes. When something is missing (about 10% of the time), Doug searches through available spare parts and finds the part or parts that will complete the kit; this takes about five minutes.

Pat removes the plastic caps from the front axle and discards them, then places the metal capnut on one end of the axle and taps it into place with a hammer, which takes about two minutes, on average. He then slides the uncapped end of the axle through one of the front wheels, the holes in the body and the other wheel, then taps the second capnut in place with the hammer and tugs to make sure the axle and wheels are secure. This step takes three minutes.

After Pat's work is completed, Kate begins the rear wheel assembly, first placing one pedal on the pedal crank, positioning a washer in the pedal slot, and driving the pedal crank through the washer until it is securely fit within the pedal, then pulls on it to make sure it is secure. This takes Kate two minutes. She then slides the crank through a wheel insert, which positions the crank securely, and the rear wheel, then slides on the remaining insert and positions the second pedal. This takes another two minutes.

Lisa completes the assembly by inserting the handlebar post through the hole in the body of the elTACOBIKE, inserting two screws, one through the front and one through the back, then tightening them. She finally places the preassembled metal taco box-container in the front frame between the wheels. This takes, on average, three minutes.

Draw the swim-lane process flow diagram and identify the bottleneck. Label everything clearly and completely.

Reference no: EM131350411

Questions Cloud

Industrial manufacturing of furniture : You are asked to explain whether or not your organization (industrial manufacturing of furniture) should pursue ISO 14001 certification for its environmental management system. Provide a summary of your recommendation, along with supporting detail..
Write the sum of the two vectors in phasor notation : When adding sinusoidal expressions like 4 sin (3.14t + 20°) and 5 sin (3.14t 70°), electrical engineers sometimes use phasors, which are vectors in polar form.
Important metrics for operations managers : Develop a listing of what you believe are the most important metrics for operations managers. (Hint: Be sure to consider the triple bottom line.) Howdoes each metric support the overall financial performance of the organization?
Write a polynomial function to model the set of data : An airplane flies at an air speed of 425 mph on a heading due south. It flies against a headwind of 50 mph from a direction 30° east of south. Find the airplane's ground speed and direction
Process flow diagram and identify the bottleneck : Draw the swim-lane process flow diagram and identify the bottleneck. Label everything clearly and completely.
What areas for improvement in your leadership skills : Continuing on the themes of the Module 1 and 2 Case Assignments, for this module you will also be doing a self-assessment as well as applying the concepts from the module to your own organization. Make sure to thoroughly review the required backgr..
What was the intention of the film or filmmaker : How was the story presented? What was the intention of the film and/or filmmaker? Was this intention fulfilled or met? Did the way the movie was produced and presented affect the content
Arecibo observatory : Watch the following video "Arecibo Observatory" Time (18:33 min) "https://www.youtube.com/watch?v=YX4PZ-fW2YA"
Emergency services safety and survival : Your response should be at least 200 words in length class is fire science principal of fire and emergency services safety and survival

Reviews

Write a Review

Operation Management Questions & Answers

  Societies value efficiency and place a dollar value on time

Most Western societies value efficiency and place a dollar value on time. Western cultures are often described as monochronic (Hall, 1976) while Latin American and Middle Eastern cultures are described as polychronic. How important are timekeeping te..

  What is modern management theory

What is modern management theory because are we not just working from the Scientific Management Theories of the 40s and 50? so what is more modern?

  What is the acronym for earnings before interest and taxes

The Idaho Corporation earned $23,458,933 before interest and taxes for the year ended December 31, 2016. If the interest expense was $1,645,123, calculate the tax obligation for the year. What will be the average tax rate? Also, what is the acronym f..

  Project schedule has been determined

As the project manager, you have made all of the role assignments, and the project schedule has been determined. One prominent stakeholder, Mr. Money, had asked for and was assigned a key role in the project—to secure donations for the project. What ..

  Determine the probability of waiting in line

Sharp Discounts Wholesale Club has two service desks, one at each entrance of the store. Customers arrive at each service desk at an average of one every six minutes.

  How they are indicative of successful total rewards program

Assume an organization wants to gauge the success of its total rewards program. Discuss at least two possible metrics or outcomes it might use. Be sure to explain why you chose the metrics you discuss and how they are indicative of a successful total..

  Compute the mad

Forcast demand for each week, including week 10 using exponential smoothing with a= 5 (initial forescast = 20).

  Use both positive and negative reinforcement

If you, as a manager, had to help change an employee’s behavior to make him or her more productive, what course of action would you take? How might you use both positive and negative reinforcement?

  How would you characterize best buy''s competitive strategy

How would you characterize Best Buy's competitive strategy? Should it be classified as a low-cost provider strategy? A differentiation strategy?

  Determine the cost of goods sold-fifo cost flow

Nejedly Company completed 80,000 units during the year at a cost of $1,520,000. The beginning finished goods inventory was 8,000 units at $96,000. Determine the cost of goods sold for 53,000 units, assuming a FIFO cost flow.

  Why is it important for a company to have a cash budget

What are some steps an entrepreneur can take to improve the company's cash position?

  Sinking to salvage equipment and personal possessions

On May 29, Cappy took his boat out on Blue Lake for a day of fishing and relaxation. At about 2:00 p.m., a violent storm blew in, and Cappy’s boat overturned and sunk. Cappy survived, and planned to return to the site of the sinking to salvage equipm..

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd