Problem regarding the wiley construction

Assignment Help Business Management
Reference no: EM131040747

Where's My Cart?

The Senior Seminar at Allegheny State requires students to complete a process improvement project with local industry. Jim Davis and Leanna Hearn have been assigned to Wiley Construction. Here is their report.

Wiley Construction

Company History

Founded in 1975, Wiley Construction was one of the first designers and builders of wooden roof trusses. Over the past 40 years Wiley has prospered, and it now has office and manufacturing space of approximately 132,200 square feet and additional lumber storage facilities of about 22,300 square feet, on a 60-acre site near the Monongahela River in Pittsburgh, Pennsylvania. Utilization of this space has never been difficult, and in the fall of 2000 Wiley proudly opened a new 6000-square-foot showroom, which serves as an educational building center and showcase for many of the products it builds and/or sells. In addition to its core roof truss business, Wiley now has over 200 employees designing and building floor truss systems and preconstructed interior and exterior wall systems.

Joseph Wiley, the founder and chairman of Wiley Construction, not only wanted to build superior roofing systems, he also envisioned the idea of prepackaging an entire house. The package of materials, from foundation blocks to roofing shingles, would be available through one source. This idea soon led for a custom-designed line of homes, called Wiley Homes. The key selling point to these "prepackaged" homes besides convenience and accuracy, was that, while the interior layout was universally applicable, the exterior of the home was designed with a very local flavor.

The exemplary reputation of the Wiley Home program as well as attention to customer service, prompt delivery times, and accurate product specifications allowed Wiley to become an international supplier of quality building products. Their products have been shipped to dozens of countries, including Russia, Germany, Spain, Japan, Korea, China, Greece, Turkey, Mexico, and Chile.

Gary Cox replaced Joe Wiley as president of Wiley Construction in January 2013. Executive Vice President Ciro Alvarez is one of the many highly skilled and motivated Wiley professional management employees. To accomplish its diverse objectives, the company has assembled a team of employees with degrees in Architecture, Building Construction, Civil Engineering, Math, Forestry, Wood Science, Accounting, Business, International Relations, Computer Science, Architectural Technology, and Biological Systems Engineering.

Technology

From the days of hand drafting and manually designed framing layouts, Wiley now utilizes highly automated methods of production as well as completely computerized design programs. These technologies have resulted in annual sales approaching $25 million. The most automated piece of equipment at their Pittsburgh facility is a Uni-saw, a highly sophisticated machine capable of simultaneously making the necessary angle adjustments on four circular saw blades. One of Wiley's newest endeavors is the construction of prefabricated wall panels, for which it now has a new wall panel machine to more efficiently construct a higher quality wall panel. The new partially computer-controlled machine was designed especially for Wiley and is one of the best in the industry. In order to maximize the utility of its automated capabilities, Wiley employs nearly 50 computer operators and programmers experienced in engineering, design, export, sales, and accounting software systems. Central to the operation is the highly specialized wooden-truss design program used by the engineering staff. To ensure that all of this technology results in the highest quality products, the Wiley production facility is one of a very small percentage of facilities that opens their doors to the rigid quality-control specifications of the Pre-Fab Construction Industry.

Current Production Process

Wiley Housing Systems, Inc., is a batch production company that specializes in make-to-order timber housing systems. The manufacturing facility is over 100,000 square feet in size (see the accompanying figure) and is sectioned off into different areas such as wall, floor, and roof truss assembly, raw material cutting, and metal storage. Each of the assembly lines is fed by a common 26,000 square foot on-site supply point. The only required materials are common-sized lumber (i.e., 2 × 4, 2 × 6, etc.), aluminum connecting plates, and nails. However, each of the processes is tailored to meet customer demands and specifications.

All of Wiley's products are constructed of standard dimensional lumber that arrives via truck or train and is stockpiled in its lumber yard. Typically, Wiley has enough lumber on site for two weeks of continuous operation without replenishment. All other inventory, work-in-process, and common materials are stored inside the production facility. Once an order is received, the staff engineers design the truss system and electronically queue the order for manufacture. The production foreman then assigns the order to a cutting team. This team consists of two men-the sawer and the tailor. The sawer is responsible for saw setup, as well as lumber retrieval and optimization, while the tailor stacks and labels the cut lumber for assembly. Mr. Alvarez explained that his major concern was the amount of setup time required by the cutting teams. He said that up to 45% of production time was spent adjusting the saws for each job, a very typical problem in batch production. This is where Wiley's problem and our challenge began.

Process Improvement

After our initial plant tour, where we noted the large amount of work-in-process inventory waiting in carts between the saws and the assembly stations, we spent a day interviewing workers on the assembly teams. It was brought to our attention that at certain points during the day the backup of WIP carts was in fact problematic, from the standpoint of worker safety and from the ability to locate the required cart quickly and easily. There are approximately 80 to 90 carts in use at any given time, which are loaded with raw materials on a per-job basis and are tagged with a work order. After the carts are loaded and tagged, they are placed in front of the assembly workstations. Copies of the work orders are taken to the plant control office. The plant supervisor then assigns the jobs to assembly stations by placing the work order copy in assigned bins located on the plant control office wall. The assembly employees will go to their assigned bin, pick their next job ticket, and then locate the corresponding cart for that job. Mr. Alvarez mentioned that locating the cart required for the next job could take anywhere from one to ten minutes depending on the assembly backup (number of full carts used that day) and the location of the cart within the facility. The manufacturing employees are tracked on a 100th-of-the-hour time basis for work, which means that there should, in theory, be very little unproductive time during the day, with the exception of break periods. This also reduces socialization of employees.

We decided to narrow our analysis to the immediate problem of locating the correct cart. After brainstorming possible solutions, we have concluded that Wiley should use an electronic paging system similar to what restaurants use to notify customers that their table is ready. We recommend that the carts be outfitted with long-life, durable, and replaceable lithium battery-powered strobe lights that are activated by a keypad located on the plant control office wall beside the pending job order bins. Each light would have a unique three-digit number assigned to it. These numbers would be handwritten on the work order, by the individual who loads the cart, before it is given to the plant supervisor to be assigned. There is a chance of multiple carts being needed for the same job, but each cart has its own individual work order and therefore would have its own three-digit identification number and light. This is no deviation from the current process. The assembly workers would walk to the plant control office, retrieve their next job from the bin, type the three-digit code into the keypad, and then find the cart that has the strobe light turned on. This process would eliminate all of the guessing currently required to locate the cart with the raw materials and should reduce the overall average time needed to locate a cart. This would also allow remote storage of the carts, rather than stacking as many as 30 carts at the top of the assembly line, a hindrance to traffic flow and safety.

In 1,050 to 1400 words answer the following questions:

  • 1. Identify waste in the current production process.
  • 2. How does the pager suggestion eliminate waste?
  • 3. Have the students and Mr. Alvarez found the root cause of the cart problem? Why or why not?
  • 4. How would you apply the principles of lean production to improve Wiley's situation?

Reference no: EM131040747

Questions Cloud

Engage in systems development life cycle : "Company A" is planning to engage in Systems Development Life Cycle (SDLC) project for a major process within their company (Integrating new Item database with Company A's Tax system for a company-wide project). They have decided to create a proje..
How will that affect your financial institution : Will your presence in this country be helpful in your attempts to invest in other developing countries?
Provide your definition of critical thinking : Critical thinking is essential to effective learning and productive living. Provide your definition of critical thinking and relate how these skills can be transferred from higher education into the workplace.
Business information systems question : How does Scrum (Agile) development address the deficiencies in Business Process Management (BPM) and Systems Development Life Cycle (SDLC)? Be specific and provide details on the benefits and drawbacks of the Scrum development approach.
Problem regarding the wiley construction : The Senior Seminar at Allegheny State requires students to complete a process improvement project with local industry. Jim Davis and Leanna Hearn have been assigned to Wiley Construction. Here is their report.
Celebrity endorsements of bud best : Celebrity endorsement.  L&LAdvertising just signed a contract with movie star Lance Willard for celebrity endorsements of Bud's Best bacon.  The president of the firm assigns the account to Annie, who soon learns the awkward fact that Lance has ju..
Write a proposal of how much money you will keep : The purpose of this section is to develop a narrative that takes the reader down to your specific research question. You might end this section with a statement of your research hypothesis,
Explain the role capitalism plays in corporate decision : Discuss if you believe it is possible for a company to cater to both its best interest and that of the consumer conjointly or if one always has to prevail. Justify your response.
Performance of security analysts : Compare and contrast the performance of security analysts and fund managers using examples wherever possible. Explain the incentives (e.g. performance pay) at play for both security analysts and fund managers and what implications this may have fo..

Reviews

Write a Review

Business Management Questions & Answers

  Explain what is the npv of the project

Explain what is the net cash flow of the project for years 0, 1, 2, and 3? Explain what is the NPV of the project?

  Explain what are some of the common arguments trade

Explain What are some of the common arguments for and against trade restrictions? Choose a position and describe why you think it is valid.

  Describe the cultural factors that affect consumer behaviour

Q1 Briefly describe the cultural factors that affect consumer behaviour with relevant examples. What are the inferences of cultural factors for marketing strategy?

  What will be the total amount of his first monthly payment

Mark purchased a house for $400,000. He paid 21.25% as a downpayment and financed the balance with a 30-year amortized loan at a 10.25% interest rate. His monthly payments will also include property taxes ($4,000 per year) and hazard insurance ($4,89..

  How is nestle water handling changes in demographics

Which trend do you feel is having the greatest impact? Why? Identify which of the four trends is affecting your Nestle Water.

  Merit paywhat is merit pay do you think its a good idea to

merit paywhat is merit pay? do you think its a good idea to award employees merit raises? if yes why? if not why

  Explain what is the relationship between a firm''s customers

Explain What is the relationship between a firm's customers and its business-level strategy in terms of who, what, and how? Why is this relationship important?

  Communication and media theory and concepts

Marshall McLuhan Communication and Media Theory and Concepts - Explain the concept/theory and how it may or may not relate to setting the course for future communications in the information age.

  This is an accord as well as satisfaction and y2k cannot sue

Which of the subsequent statements is correct? a. Y2K's promise to catchphrase from suing Alex wasn't supported by legal consideration

  How can diversity in organizations and planning group

How can diversity in organizations and planning groups lead to greater success with change in a school or organization?

  Calculate the expected npv of project

The probabilities of these three conditions are 30%, 50% and 20%, respectively. Calculate the expected NPV of this project

  Successfully navigated the marketing process

Details: Over the past three weeks you have successfully navigated the marketing process. You have an understanding of your customer needs and the marketing environment through research. You have developed a marketing strategy and begun develop..

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd