A machine shop makes small-run, precision woodworking tools on the following machines:
• Four Grinders
• Two Drill Presses
• Three Lathes
• One Borer
• One Planer
Each product generates a certain amount of gross profit (defined as the selling price less the cost of raw materials and manufacturing). These quantities, together with the time required from each machine for manufacture (in hours) are given in the table below. A dash indicates that the product does not need that particular machine as part of its manufacturing process.
Tool Produced |
Gross profit |
Grinder |
Drill Press |
Lathe |
Borer |
Planer |
Dowelling Jig |
10 |
0.5 |
0.1 |
0.2 |
0.05 |
|
|
Square |
6 |
0.7 |
0.2 |
|
0.03 |
|
|
|
Kerf Ruler |
8 |
- |
- |
0.8 |
- |
0.01 |
|
|
|
Tenon Jig |
4 |
|
0.3 |
- |
0.07 |
- |
|
|
|
Saw Aligner |
11 |
0.3 |
|
|
0.1 |
0.05 |
|
|
Center Scribe |
9 |
0.2 |
0.6 |
|
|
|
|
|
|
Honing Guide |
3 |
0.5 |
|
0.6 |
0.08 |
0.05 |
|
There are limitations on how many of each tool the manager believes the company can sell in each month. Unfortunately, during the next 6 months (Jan - June), certain machines will have to be taken offline for maintenance. The limit to demand and maintenance schedule can be found in the table below
|
Dowelling Jig |
Square |
Kerf Ruler |
Tenson Jig |
Saw Aligner |
Center scribe |
Horning guide |
Tools Offline |
January |
500 |
1000 |
300 |
300 |
800 |
200 |
100 |
1 Grinder |
February |
600 |
500 |
200 |
0 |
400 |
300 |
150 |
2 Lathes |
March |
300 |
600 |
0 |
0 |
500 |
400 |
100 |
1 Borer |
April |
200 |
300 |
400 |
500 |
200 |
0 |
100 |
1 Drill Press |
May |
0 |
100 |
500 |
100 |
1000 |
300 |
0 |
1 Grinder and 1 Drill Press |
June |
500 |
500 |
100 |
300 |
1100 |
500 |
60 |
1 Planer and 1 Lathe |
It is possible to store up to 110 of any completed tool at any time at a cost of 40c per unit per month. There are no tools in stock at the moment, but management would like to have 50 of each tool on hand at the end of the 6 months. The factory works two 8-hour shifts a day, 6 days a week, 25 days a month.
(a) Formulate a linear program to determine the production schedule that maximizes profit?
(b) Someone has suggested that, instead of having the machine maintenance schedule as it is, could the schedule be rearranged to improve profit? Copy and modify your original model to accom¬modate these changes.
New dimension of community policing
: Explain how Intelligence Led Policing is a new dimension of community policing and how this infusion can either reduce or prevent crime
|
Issues stage of product cycle
: A typical total product curve goes through four stages, namely introduction, growth, maturity, and decline. As the product moves through the different stages different aspects of the operations management become relatively more or less important.
|
Problem regarding the business consulting
: Remember Bill? He was the gentleman that you helpedto start up his business in week 4. Well his business is doing well, but he has come to you with some questions and concerns.
|
Static electricity problems-molding and handling operations
: A manufacturer of small plastic injection molded parts (caps, closures, fitments and pipettes) was experiencing static electricity problems during various steps in their molding and handling operations. The static caused the plastic parts to cling to..
|
Problem about operation research by ampl program
: Problem about operation research by AMPL program - write variable and objective and constriction for each part
|
Produces product for which the annual demand
: Bruce Woodworth’s company produces a product for which the annual demand is 10,000.Because it operates 20 days per year, demand is about 50 per day. Daily production is 200 units. Holding cost is $1 per unit per year; setup cost is $200. If you wish ..
|
What is the multifactor productivity ratio
: It takes the Kwinzee shipyard six months with 500 workers to build a small tanker. Material costs are $32 million and overhead costs are $2 million. Workers cost $40 per hour including benefits and work 40 hours per week. The ship sells for $75 milli..
|
According to an exponential distribution
: There is only one copying machine in the student lounge of the business school. Students arrive at the rate of? = 40 per hour (according to a Poisson distribution). Copying takes an average, of 40 seconds, or? = 90 per hour (according to an exponenti..
|