Probability of finding a bad rivet

Assignment Help Civil Engineering
Reference no: EM1382901

Samples of 20 rivets for a steel structure are checked for quality every hour. The probability of finding a bad rivet that has to be scrapped is 1%.assume that x is the number of parts in the sample of 20 that have to be scrapped. What is the probability that x exceeds its mean by three standard deviations? What is the probability that x exceeds 1 in at least one of the next five hours of quality checks?

Reference no: EM1382901

Questions Cloud

How many containers are needed : Assume a plant operates 2000 hours per year, demand for its parts is 100,000 per year and it takes a full 24 hours for a Kanban container
Personal conduct and job problems : Discuss the hardship losing your assignment will cause your family? Any other mitigating factors you can think of.
Evaluate the result to the actual size : Let us use the uncertainty principle to (very roughly) estimate the size of a hydro- gen atom. Picture the hydrogen atom as an electron orbiting a proton at close to the speed of light.
Everyone knows how important it is to make great people : Everyone knows how important it is to make great people decisions, and yet we see examples all around us of failure to do so
Probability of finding a bad rivet : Samples of 20 rivets for a steel structure are checked for quality every hour. The probability of finding a bad rivet that has to be scrapped is 1%.assume that x is the number of parts in the sample of 20 that have to be scrapped.
Develop two single dimension arrays-floating-point numbers : Develop two single dimension arrays which contain 10 floating-point numbers in each array. Develop third single dimension array to hold sum.
What is the resulting total profit : Formulate a linear programming model for this problem and use the graphical method to solve this model. What is the resulting total profit?
What are the factors a manager must consider when attempting : What are the factors a manager must consider when attempting to lead a team that includes members from other cultures
Decision making-behavioral traps : These're the five different types of behavioral traps: The time delay trap the investment trap deterioration trap the ignorance trap collective trap.

Reviews

Write a Review

Civil Engineering Questions & Answers

  Di-atomic ideal gas

Air can be assumed as a di-atomic ideal gas. Find the final temperature and the amount of work ( in kW) required for air compression at a rate of 100 mol/s , from an initial condition of 1 bar an 25 C to 10 bar; for the following ways:

  Aggregate in the wheelbarrow weight

You fill a 2-cubic foot wheelbarrow to the top with aggregate. if the specific gravity of the aggregate is 2.548 and 18% of the aggregate is void spaces, how much does the aggregate in the wheelbarrow weight?

  Design a three story office building

Design a three story office building

  Number of revolutions tub makes

A tub of a washing machine is rotating at 50 rad/s when the power is turned off. If it takes 15s for the tub to come to rest, determine (a) the constant angular deceleration, and (b) the total number of revolutions the tub makes.

  Darcy-weisbach equation for flow in a pressure conduit

In using the Darcy-Weisbach equation for flow in a pressure conduit, what percentage error is introduced in Q when f is misjudged by 20 percent?

  Principal stresses and the orientation of planes

A direct shear test is performed on a saturated specimen of loose sand. A normal stress equal to 100 kPa is applied and a maximum shear stress of 75 kPa is measured in the shear test. Determine the principal stresses and the orientation of these p..

  Deriving the eom for building

Working a problem where there are two one-story buildings of different heights next to each other. Earthquake imparts a base motion z(t) that is a cosine function. I'm given a shape function for a column of height L when deriving the EOM for each ..

  Total energy per unit weight of fluid

A fluid flowing in a pipe 30cm in diameter has a uniform velocity of 4m/s. The pressure at the center of the pipe is 40KPa, and the elevation of the pipe's centerline above an assumed datum is 4.5m. Compute the total energy per unit weight of the ..

  Evaluate the pressure head at point

Evaluate the pressure head at point a and determine the vertical effective stress at point b and evaluate the lateral pressurein the brown clay

  Effective thermal capacity in climates

For energy conservation, materials with a high thermal capacity are effective in climates in which the heat flow through the building envelope is:

  Writing case study about bridge collapse

Writing case study about bridge collapse

  Components of ownership

The IIT components of ownership cost based on average annual value are: Tax-3%, Insurance -4%, and Interest-7%. a) What is the average annual value?

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd