Reference no: EM133121314 , Length: word count:1500
BSBPMG531 Manage Project Time
Task - Performance and Skills Assessment
Task summary
This assessment task requires you to undertake market research relevant to a product or service available in today's marketplace.
This project requires you to complete the assessment tasks in a real workplace (your current workplace can be used). If you are not working, select a workplace you are familiar with.
Required
You are required to demonstrate your ability to:
- manage project time on at least two occasions. In the course of the above, the candidate must:
- develop a project schedule using project management tools and techniques
- conduct a review of project scheduling and recommend improvements for the future
Task 2 - Performance and Skills Assessment
Complete this task using the Indo Aust Jaya scenario and the corresponding project brief. Read through the brief & complete corresponding questions in each "part".
• Part A - Work breakdown structure
• Part B - Estimation of duration & effort for each task
• Part C - Project Schedule
• Part D - Measuring, recording & reporting
• Part E - Improvements
Part A - Work breakdown structure
- Prepare a work breakdown structure for your project (table provided below**).
- Refer to section 5 of the project brief.
Part B - Estimate of duration and effort for each task
Provide an estimate of duration and effort for each task of your project as well as task sequences and dependencies. (300 words)
You will need to use the work breakdown structure you completed in Part A to identify the tasks. List each one under the appropriate work breakdown structure heading. Next to each task, note:
- tasks that must be completed before the task can commence
- how long each task will take?
- who will complete each task?
- any equipment or materials required to complete the task
Part C - Project schedule
- Develop the project schedule using appropriate software and techniques (Refer to your online readings/learner guide for software and techniques).
- It is recommended that you use a Gantt chart for this task.
- **Please upload your project schedule with this assessment task to canvas upon completion.
- Your project schedule should link to the estimation that you prepared in Part B.
Part D - Measuring, recording and reporting progress
- You are to provide an updated project schedule reflecting a variation and a progress report, this includes a project schedule reflecting the variation, and the Project status report (300 words).
- The project involves implementing a Customer Relationship Management (CRM) system.
- Refer to the case study context below for responding to Part D, the Gantt chart is recommended.
Context:
Gary Jazgar manages IAJ's IT department. The IT Department at IAJ is responsible for:
• supporting IAJ staff
• planning and coordinating infrastructure
• performing website maintenance
• testing and planning for disaster recovery
• adhering to the strategic plan for keeping hardware and software up to date
• monitoring and maintaining computer hardware operating systems and applications
• troubleshooting system and network problems and diagnosing and solving hardware/software faults
• providing procedural documentation to users
• evaluating and running projects as required
• ensuring security of the network
During the conversation, Gary requested a change to the schedule. The change is an extension of time for a specific task/phase due to the following reasons:
• unavailability of a staff member involved in the task; and
• delays in being able to purchase required hardware
You are to provide an updated project schedule reflecting a variation and a progress report.
This includes a project schedule reflecting the variation, a Gantt chart is recommended and the Project status report (300 words).
Part E - Improvements
Write a short reflection discussing the changes you could make to your time management control mechanisms/project schedule in order to manage project time more effectively. (100 words)
Attachment:- Manage project time.rar
|
Determine the tangency portfolio weights
: a) Determine the Tangency portfolio weights and calculate its expected return, standard deviation and Sharpe Ratio. Assume short sales are allowed.
|
|
Determining the current share price-hughes co
: Hughes Co. is growing quickly. Dividends are expected to grow at a 28.5 % rate for the next three years, with the growth rate falling off to a constant 5.6 % th
|
|
What is the value of the call option
: The price of Ervin Corp. stock will either be $62 or $87 at the end of the year. Call options are available with one year until expiration.
|
|
Find number of shares outstanding
: Q. In your role as a consultant at a wealth management firm, you have been assigned a very powerful client who holds one million shares of Netflix, Inc. purchas
|
|
Prepare a work breakdown structure project
: This Assessment task requires you to undertake market research relevant to a product or service available in today's marketplace
|
|
How much additional liquid cash would be required
: If they were to also repay their debts and cover other lump-sum needs, how much additional liquid cash would be required?
|
|
What is the value at risk
: Suppose you invested $50,000 in a stock with mean return of 9% and variance of return of 225. Assuming an approximately normal distribution, what is the Value a
|
|
What is the present value of cd
: What is the present value of CD with 4% annual interest that matures in 1 year with a value of $3000? If you had $3,000 right now, with the same rates for the s
|
|
What is the after tax salvage value of the equipment
: Solar Inc. is considering a new project that complements its existing business. The company bought a piece of land three years ago for $200,000. This land is cu
|