19. You have to prepare a Construction Programme for a complex multi level project where activities can logically be inprogress, concurrently on each level.
What specific major advantages are there in preparing a manual hand written logic programme, showing the activity logic connections and durations. Before attempting to data entry them into a computer generated programme like Microsoft Project?
List and explain briefly two (2) advantages
20. What is the major advantage to the Management of a construction project to know what activities in the construction program are non-critical and the amount of total float time for each activity
List and describe the advantages
21. If you add up all the total floats (stacks) of separate chains of non critical activities the total is of vital information for managing the project to finish in the shortest time
True of False?
22. During the progression of a commercial construction project inevitably actual progress is delayed behind the planned progress from the construction programme. Once identified by regular monitoring, what options are available for site management to ‘make up' lost time, to prevent financial loss consequences from Liquidated Damages in the head contract?
Describe in detail an action you can initiate to get back on programme.
23. When drafting the initial Construction Programme for a commercial project. What information/data should be considered to allow for anticipated delays? List four possible issues.
· Seasonal inclement weather:
· Sub-contractor delays:
· Material supplier delays:
· Industrial site issues:
24. Site management staff during the construction process are constantly required to manage the finances of the project by using ‘Cost Benefit' analysis processes
For example, to overcome identified loss time on a project one option is utilising existing manpower resources to work additional daily hours on ‘overcome penalty rates' to make up lost time.
What offsetting benefits can be justified to balance out the additional overtime costs?
List three (3)
25. When preparing the initial Construction Programme the programmer has to take into account some legal requirements included in the Head Contract
List three (3) specific generic commercial contract clauses that would be included.
26. Building Consultants engaged by the Architect on a commercial Construction Project are involved in the documentation of services in the Design phase. Identify circumstances in which these Building Consultants would be involved during the construction of a commercial project. List two (2) circumstances which may affect the Programme.
|
The beta be for the other stock in your portfolio
: What must the beta be for the other stock in your portfolio?
|
|
Calculate how much boeing should borrow or invest
: Calculate how much Boeing should borrow or invest.
|
|
The main actions between doing and improving your activity
: Describe a work task, a hobby, or another activity that you regularly do, and sequentially list the various actions you take in order to complete this activity.
|
|
What is the annual operating cash flow of the project
: What is the annual operating cash flow of the project in years 1 to 6?
|
|
Prepare a construction programme for a complex project
: You have to prepare a Construction Programme for a complex multi level project where activities can logically be inprogress, concurrently on each level.
|
|
Write an opinion in response to a current newspaper article
: Write an opinion in response to a current newspaper article or op/ed piece. The article must be less than one year old.
|
|
Describe e-commerce and define e-contract
: Describe and distinguish among valid, void, voidable, and unenforceable contracts. Describe offer, acceptance, and consideration.
|
|
What factors should you consider after target market
: When considering an investment in a startup tech company, what factors should you consider after target market and problem solving?
|
|
How the theory or model was used in the research study
: Post a summary of the article that you located and explain how the theory or model that you selected was used in the research study.
|