The management of Albatross Packaging Corporation is concerned about overhead cost allocations.  The corporation has been using the plant-wide rate based on direct labor costs since it began operations.   The CEO, J.J. Smith, has been hearing a lot about Activity Based Costing and is beginning to think the Corporation needs to adopt such a system.   He has decided to hire you as a consultant to evaluate overall overhead allocation system and prepare recommendations. 

He tells you that a number of problems have arisen in the past few months.  Several large, potentially profitable jobs have been lost due to underbidding by the competition.   There also seems to erosion in the market share of the generic cardboard boxes as competitors are beginning to undercut the company's current selling price.

In addition, some of the specialty jobs that have been won do not seem to improving the bottom line as much as anticipated. In total, profits in the past three years have been gradually eroding.  Since prime costs are fairly standard and stable for the industry, he is beginning to suspect that the overhead costs are not being allocated in the proper manner and/or may be out of line with the competition. 

The next part of your analysis concerns the use of activity based costing to assign the overhead to the jobs.  Assume the following five cost pools exist in the Albatross Packaging Corp. 

Overhead costs assigned to activity pools

 

Cost drivers

Activity

Pool rate

Maintenance

        975,000.00

        100,000.00

Machine hours

 

Material handling

        650,000.00

           2,600.00

material moves

 

Setups

     3,250,000.00

              236.00

number of setups

 

Inspections

        750,000.00

         10,000.00

Inspection hours

 

Other

        600,000.00

   15,000,000.00

Units produced

 

Total overhead costs

     6,225,000.00

 

 

 

Each of the jobs completed use the number or amount of resources identified in the schedule below.

 

 Activities used by each job

Generic

18

19

Generic 2

20

21

22

23

Maintenance

1800

230

375

1800

365

220

280

425

Material handling

10

4

6

10

4

6

4

4

Setups

1

1

1

1

1

1

1

1

Inspections

345

25

35

340

28

20

27

125

Other

500000

12500

25000

500000

20000

10000

15000

35000

Required

1.      Prepare a schedule showing total cost per pool and the pool rates.

2.      Prepare another schedule showing the total costs attached to each of the jobs above using the pool rates above to apply the overhead and the prime costs found in part 1.  It is suggested that you first prepare a schedule to show the overhead costs assigned.

3.      Prepare a final schedule comparing the total cost, unit costs broken down by material, labor and overhead for both ABC and for the traditional costing methods.  (Pull the information from the costs computed in the first part and compare to the information calculated for the ABC costing method.)

4.      Compare the income statements broken down by job using the plant wide rate and ABC.  Compute the gross profit margin for each job as well as gross profit in total. 

5.      Prepare a chart comparing the costs assigned for overhead for the two methods evaluated in part 1 and part 2.

6.      Discuss, in memo format, the impact on the costs and bids using the plant-wide rate and activity based costing.  Include the recommendation for one of these two methods.  Be sure to include proper rationale and at least one schedule or graph that you've prepared.

Reference no: EM13501492

Questions Cloud

Explain the concentration of the solution in units : Lactose, C12H22O11, is a naturally occurring sugar found in mammalian milk. A 0.335 M solution of lactose in water has a density of 1.0432 g/mL at 20 degrees Celsius. What is the concentration of this solution in the following units
What was the speed of the clay immediately before impact : A 13.0-g wad of sticky clay is hurled horizontally at a 90-g wooden block initially at rest on a horizontal surface. The clay sticks to the block. what was the speed of the clay immediately before impact
Prepare absorption costing income statements : If the company wishes to earn an after-tax income of $3,000,000, what is the break even in units?  Assume that the corporate income tax rate is 40%.
What fraction of the neutrons kinetic energy : A neutron in a nuclear reactor makes an elastic, head-on collision with the nucleus of a carbon atom initially at rest. What fraction of the neutron's kinetic energy is transferred to the carbon nucleus
Prepare a chart comparing the costs assigned : Compare the income statements broken down by job using the plant wide rate and ABC.  Compute the gross profit margin for each job as well as gross profit in total.
Evaluate the mass of unknown solid required to prepare : Calculate the mass of unknown solid required to prepare 100 mL of a solution that is 100 ppm in Ca by assuming that the sample contains 50 wt% CaCO3.
What is the proper shutter speed at this setting : A camera lens is initially set at f/16 for a shutter speed of 1/160s. what is the proper shutter speed at this setting
Indicate whether this overhead is under or over applied : Calculate the predetermined overhead rate for the current year and use this rate to apply overhead to the jobs that are worked during February.
Explain the procedure use to determine anion pairs : Describe the procedure you will use to determine those cation/anion pairs that produce precipitates. Make sure you include all equipment and amounts of materials you expect to use

Reviews

Write a Review

Managerial Accounting Questions & Answers

  Flexibility to change budgeted costs

We want a flexible budget because costs are difficult to predict. We need the flexibility to change budgeted costs as input prices change.' Does a flexible budget serve this purpose? Explain.

  The managing director of sigar plc has recently attended a

the managing director of sigar plc has recently attended a seminar on total quality management and hasexpressed

  What is full costing

What is full costing? Define and compare job order costing and activity-based costing.

  Vintech company standard costing

Vintech Company is planning to produce 1,800 units of product in 2011. Each unit requires 4 pounds of materials at $6 per pound and a half hour of labor at $17 per hour. The overhead rate is 70% of direct labor

  Preview of financial accountant-forecasting

Generally forecasting and planning is considered the preview of the financial accountant or the forecasting and planning department.

  Process costing-solution set

The following information relates to activities in the mixing departments for June: Beginning WIP, June 1, 100,000 pounds. Cost in beginning WIP inventory were as follows:

  How the short term nature of such measures

"Both Return on Investment (ROI) and Economic Value Added (EVA), when used as performance measures in an organisation, encourage managers to be short-term in their focus and decision making".

  Job-ordering costing system

Recognize three firms from 2009 FSB 100 which need a job-order costing system. Describe why they would most likely employ a job-order costing system.

  Calculation of equivalent units lo 2 mcmillian tire company

calculation of equivalent units lo 2 mcmillian tire company produces tires used on small trailers. the month of june

  Milton and rhodes perform consulting services for

milton and rhodes perform consulting services for e-commerce consulting and information systems in western australia.

  Asignacioacuten individual t3ai 2 relevant costratios

asignacioacuten individual t3ai 2 relevant costratios analysis1. the current ratio for a company with current assets of

  Identify two potential problems that could arise

Identify two behavioural advantages that could arise and identify two potential problems that could arise.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd