Q1 There can be numerous factors that contribute to failed information technology projects. Are there consistent factors that emerge in in all failed projects or is each project unique? Analyse the case history of an IT system that failed and explain why it failed. Propose interventions that might have prevented the failure include explanations for why you think these interventions should work.
For all Assignments: Your document should have 750-1,000 words (not including the list of works cited), but it is the quality of the answer that matters, not the number of words. Cite and reference all sources using the Harvard Liverpool Referencing System.
Q2 How will your group plan the work breakdown structure (WBS) for your Project Plan Outline? What factors do you need to establish as a basis for scheduling, designing network diagrams, PERT and Gantt charts and establishing critical paths of information?
And, what human resource management structures will you include in your project schedule? You have had two Weeks to work on this portion of the Project Plan Outline.
How to use WBS to create a project estimate.
Please make any required changes to the earlier sections of your project plan and note the revision history. To complete this Group Project
2: Project Estimates: Create a single document. Embed both text and images in the document, if possible. You can do this by using screenshots of the COCOMO estimate. Group Project 2: Project Estimates should be submitted in the following format: 2.0 Project Estimates
This section presents a set of estimates for the completion of the project, including people, hardware and software.
1.People costs
1.Historical or researched data used for estimates (Requires annotation listing where you got this information)
2.Salary requirements 2.Equipment costs (Requires costs for all hardware and software used. It is assumed that all hardware and software will be new.)
1.Hardware
2.Software
3.Estimation techniques and results 1.COCOMO 2.Process-based 3.Triangulation results These sections should have 750-1,000 words.
Embed everything in the Word file, if possible. You can do this by using screenshots of the COCOMO estimate.
For all Assignments: Your document should have 750-1,000 words (not including the list of works cited), but it is the quality of the answer that matters, not the number of words.