Part-1

Your company operates an underground nickel mine producing 1.2 million tonnes of ore at a grade of 2.8% nickel. The orebody dips at 70° fairly regularly and is extensive along strike and down dip. Orebody width varies between 14 and 30 metres and averages 25 metres.

Until now the method of stoping has been by the sub-level blasthole stoping method, however due to dilution problems from a weaker than expected dunite hanging wall the decision to change mining method to mechanised transverse cut and fill stoping has been made. The UCS of dunite is 30 to 110 MPa.

The ore consists of a fine pentlandite disseminated in quartz dolerite. The UCS of the ore averages 250 MPA in a small range. The ore tends to be massive with little evidence of jointing or other structural features.

Cut and fill stope widths are to be 8 metres with 4m separating pillars, pillar recovery is to occur at a later date. Mining will be by 3 metre lifts using horizontal benching. Mechanised drilling is to be employed and 3m3 LHD's are to be used to haul ore to the mill holes. The mill holes are to be equipped with grizzlies with 0.5m apertures.

Occasionally the ground will be wet, but dry conditions are generally experienced.

1.Design the drilling/blasting pattern showing hole diameter, hole depth, burdens, spacings, explosive types, primers and initiation system and indicate the initiation sequence.

2.Select drill types, makes and models and estimate the number of drill units required to maintain production at existing levels. For the purposes of this exercise assume adjacent stopes can be accessed through pillars and that a 2 production shifts per day system is used

3. Calculate average figures for tonnes/round and powder factors in kg/tonne

Part-2

A gold mine has just completed mining waste pre-strip prior to commencing grade control mining. The waste rock was drilled and blasted for the pre-strip using 200mm diameter blast holes using a rotary blasthole drill and achieved a mining rate of 15,000 m3 per day. Blast parameters for the pre-strip were:

1.Blasthole burden5.7m
2.Blasthole spacing6.5m
3.Bench height15m
4.Subgrade drilling1.6m
5.ExplosiveANFOdensity 0.85 g/cc
6.Powder Factor0.57 kg/m3

Fragmentation in the waste was acceptable for the excavators; these will be used for grade control mining as well as bulk waste mining. Grade control mining is to be undertaken using 115mm diameter holes to achieve sampling control; these will be drilled using a tophammer hydraulic drill. Bench height for grade control mining is to be 5m.

The waste rock has a density of 2,600 kg/m3, ore has a density of 3,200 kg/m3 due to sulphides and alteration minerals.

1.Scale down the waste blast parameters from 200mm to 115 mm diameter blastholes and determine explosive consumption in the waste and ore rocks.

Note: in addition to ANFO the full range of Heavy ANFO's is available from the supplier.

2. Determine the drill metres required to achieve a production rate from grade control blasting of 6,000 m3/day

3. The penetration rate for the hydraulic drill is estimated to be 50m/hr. Determine the drill productivity based on one rod change that takes 30 seconds going down the hole and 45 seconds withdrawing it from the hole. In addition two samples are collected, this stops the drill for 30 seconds per sample and tramming between holes takes 1 minute 30 seconds.

4. Based on two 12 hour shifts per day, giving an effective 10.5 hours of drilling (assuming two 30 minute crib breaks and a 30 minute service period at the end of each shift) will one hydraulic drill be capable of the required production?

5.Based on the following accessory life calculate the accessory requirements and cost:

ShankLife 600 mCost $130.00
CouplingLife 500 mCost $85.00
Drill Steel (3.6m length)Life 1000mCost $230.00
Drill BitLife 210mCost $165.00

6. Calculate the total drilling cost per m3 based on the following:

Drill fuel $9.50 per drill operating hour
Drill labour cost $22.00/shift hour
Drill maintenance $11.50/drill shift hour
Ownership cost $11.50/drill shift hour based on 20,000 hours working life

7. Calculate the total drill and blast cost based on the following blasting costs:

Explosives $550.00/tonne
Blast initiation $11.30/blasthole
Blast labour $80.00/tonne of explosive

Reference no: EM13351313

Questions Cloud

Jake and janelle prised to prepare gourmet meals for : jake and janelle prised to prepare gourmet meals for friends and family. they started a business of preparing theme
Q1 the precursors of todays engineers listed in the : q1. the precursors of todays engineers listed in the quotation from wickenden had no classes and few or no books from
1 - choose one of these products-chocolate bars or bottles : 1 - choose one of these products-chocolate bars or bottles of expensive perfume-and describe how marketers can apply
Can you think of any financial innovation in the past ten : can you think of any financial innovation in the past ten years that has affected you personally? has it made you
Part-1your company operates an underground nickel mine : part-1your company operates an underground nickel mine producing 1.2 million tonnes of ore at a grade of 2.8 nickel.
1 time is important in roundabout production however not in : 1. time is important in roundabout production however not in direct production. is this statement true or false?
The demand function for newtons donuts has been estimated : the demand function for newtons donuts has been estimated as followsqx -14 - 54px 45py 0.62axwhere qx represents
1 a company is considering an expansion projectnbsp the : 1. a company is considering an expansion project.nbsp the companys cfo plans to calculate the projects npv by
1 describe how welfare creates work disincentives2 : 1. describe how welfare creates work disincentives.2. education is habitually used as an example of a positive

Reviews

Write a Review

Civil Engineering Questions & Answers

  What size of orifice is needed to produce a change in head

What size of orifice is needed to produce a change in head of 9m for a discharge of 2 m^3/s of water in a 1-m diameter pipe.

  Calculate the effluent concentration from the reactor

You plan to use a tank of total volume V= 10 m3 to remove a contaminant at concentration Cin = 1 g/m3 from a waste stream with a flow rate of Q = 1 m3/h. The reaction is first order with a rate constant k1 = 0.5 h-1.

  What is the diameter d of the smallest-sized particles

In a hydrometer test, the data recorded at 60 minutes after the start of the test are as follows: Gs = 2.6, temperature of water T = 24°C and L = 9.2 cm. What is the diameter D of the smallest-sized particles

  What flow rate do you need to reduce the risk by 95 percent

A new sponge iron factory has an annual capacity of 100,000 tons/year of Iron production. Benzopyrene is produced during this process at a rate of 0.00006% of Iron produced.

  Draw a cross-section of the specified pavement design

The roadway to be constructed is 3 miles long and 60 feet wide. • The following pavement design specifications have been issued: - Base coarse: 6" DGA - Stabilized base: 4" - Bottom coarse of asphalt: 3" - Top coarse of asphalt: 2"

  Calculate the detention time and surface overflow rate

Two rectangular primary sedimentation tanks each 27 m long, 5 m wide and 3.8m deep treat 6000 m3/day wastewater from a community. Total effluent weir length is 50m (both tanks).

  Find what is the flow in cfs if the pressure at 3 diameter

Oil (specific gravity 0.752) flows through a 6" horizontal pipe under a pressure of 60 psi. Assuming no losses, what is the flow in cfs if the pressure at a 3" diameter reduction is 20 psi

  How many gallons of water are contained in the tank

Develop a table that shows: 1) How many gallons of water are contained in the tank if the volume is measured in increments of 1 ft from the bottom to the top. 2) The mass of water at each increment, expressed in lbm.

  Determine the energy loss due to the gradual enlargement

Determine the energy loss due to the gradual enlargement from a 25 mm pipe to a 75 mm pipe when the velocity of flow is 3 m/s in the smaller pipe and the cone angle of enlargement is 20°C.

  Design the ramp for the highest horizontal curve

The entrance to Mt. Hood Meadows (elevation 3,075 ft at the point of crossing) is grade separated from Viking highway (elevation 3,050 ft at the point of crossing) and will have to be connected. The two roadways intersect at a right angle.

  Determine what is the submerged discharge head loss

What is the submerged discharge head loss. By what percentage is this loss reduced if the provision of a draft tube increases the discharge flow area to six times the size.

  What is the uniform flow in cfs when the pipe is half full

A concrete (n=0.013) stormwater channel, 6-feet in diameter, has a bed slope of 0.01%. What is the uniform flow in cfs when the pipe is half full

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd