Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
A railroad needs to move the maximum amount of material through its rail network. The numbers given on the arcs are capacities (the maximum amount that can flow along those arcs). Formulate the LP model to determine this maximum possible material that can be moved through the network based on the following network diagram.
a) Word-process the linear programming model below.VariablesXij = Flow from Node i to Node j,
Objective Function
Constraints
b) Set up the spreadsheet for Excel Solver. Copy and paste the spreadsheet below.
c) Copy and paste the Answer report below.
d) Write the Optimal Solution below. Note: The Optimal Solutions should include the optimal values for the non-zero variables as well as the objective function.
The Good Chocolate Company makes a variety of chocolate candies, including a 12-ounce chocolate bar (340 grams). The output of the machine that fills the bar molds is approximately normal with a mean of 340 grams and a standard deviation of 1.5 grams..
In past few years, traffic problems for Lynn's hometown have gotten worse. Which route will minimize Lynn's expected travel time. Which route will maximize Lynn's utility.
Lead times are sometimes called rubbery. What accounts for this concept of elasticity in lead times?
You are the owner of a local beach bar and you are considering the purchase of a new alcohol distribution system to keep your bartenders from swiping all of your good stuff
Demand for a surgical procedure at St. Use the trend projection method to forecast demand in year 6. Please type only the forecast amount as a whole number by rounding.
An automobile brake supplier receives an average of 1,000 orders per week. An average of 500 orders are waiting to be processed. What is the average time spent by each order waiting to be processed?
Construct a c-chart for test errors, and set the control limits to contain 99.73% of the random variation in test scores. What does the chart tell you? Has the new math program been effective?
The following table shows orders to be processed at a machine shop as of 8:00 a.m. Monday. The jobs have different operations they must go through. Processing times are in days. Jobs are listed in order of arrival.
A manufacturing company has been inspecting units of output from a process. Each products inspected is evaluated on five criteria. If the unit does not meet standards for the cirteria it counts as a defect for the unit.
Managers like Janis Blancero face a more complicated decision when evaluating personal requests of employees versus evaluating employees individual work performance. Explain.
pre-occupied with keeping up with changes in their environment that they can never stick with anything long enough to get very, very good at it?
If there are 120 total defects from 10 samples, each sample consisting of 10 individual items in a production process, which of the following is the fraction defective that can be used
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd