1. A workstation must produce 400 units an hour. It takes 24 minutes to receive the necessary material for production from the previous workstation. Output is moved between workstations in containers holding 44 units. If the process uses a safety factor of 10%, then the number of kanbans that should be circulating between this workstation and the previous workstation is

A. 2

B. 4

C. 6

D. 240

2. A linear regression model that relates demand to time is known as a linear trend line.

True or False

3. Sequencing involves releasing work orders to the shop and issuing dispatch lists for individual machines

True or False

4. Coordinated workflow, production and procurement can lead to all of the following except

A. production fficiencies

B. slower response times

C. improved ervice

D. faster time to market

5. Lean production would consider producing items that cannot immediately be sold

True or false

Reference no: EM1390185

Questions Cloud

What would you say are the cultural differences between chin : What would you say are the cultural differences between Chin and Google? Once describing these cultural differences, diagnose the spheres of culture and their interactionc
Three sigma x chart and the three sigma r-chart : Auto pistons at Yongpin Zhou's plant in Shanghai are produced in a forging process, and the diameter is a critical factor that must be controlled. Construct the 3-sigma x-chart and the 3-sigma R-shart for this dimension, using the data observed in ..
Nutrients differs from the flow of energy in an ecosystem : Understand and discuss how the flow of nutrients differs from the dlow of energy in an ecosystem.
Pooled estimation of the variance : The men took an average of 20.5 hours per year of personal time with a standard deviation of 2.75 hours. What is the pooled estimate of the variance? Round to three decimal places.
Necessary material for production from the previous : A workstation must produce 400 units an hour. It takes 24 minutes to receive the necessary material for production from the previous workstation.
Construct three sigma p-chart : The results of inspection of DNA samples taken over the past 10 days are given below. Sample size is 100.
Write down the principle of energy conversion : Write down the principle of energy conversion and give an example for single and double excited system.
Control limits for bad sectors on diskettes : A computer diskette manufacturer is concerned that some diskettes have bad sectors that would cause a diskette to hold less information than it was intended to hold.
When manager monitors the progress of an affirmative : when manager monitors the progress of an affirmative actionprogram to advance minoriites within the corporation;reviewing progress on changing in staff attitude

Reviews

Write a Review

Operation Management Questions & Answers

  How many hours should each incinerator operate

how many hours should each incinerator operate each day with the least cost to Marshall County? Write an LP for this problem

  Ow many dozen cookies should you make with each batch

The same bakery also makes gourmet chocolate-chip cookies by the dozen to sell to local grocers. The bakery is contracted to supply 30 dozen cookies a day to the grocers.

  Advise if the process is at an acceptable level for an exist

Calculate the process capability index and advise if the process is at an acceptable level for an existing process defend your answer

  Illustrate what is multifactor productivity ratio

University fans support $192 ticket price increased overhead cost to 30000 from 25000 per section increase average class size.  Illustrate what is multifactor productivity ratio.

  Describe burger prince one of the largest hamburger chains

Burger Prince then ran advertisements saying which its pure beef burgers were better than Captain Hooks which used fillers. Which of the subsequent is true.

  Construct a pie chart that plots the percentage of patients

Construct a pie chart that plots the percentage of patients unssatisfied with their meals. Set the control limits to include 99.73% of the random variation in meal satisfaction. Comment on the results.

  Define the term de facto corporation and list the terms

Define the term de facto corporation and list the 3 terms that must exist in order for it to exist. Define the term corporation by estoppel.

  The length of a table leg in centimeters was measured

Five samples of table legs produced in an automated cutting process were taken each hour for 20 hours. The length of a table leg in centimeters was measured

  Illustrate what is the probability that the overall rate

Illustrate what is the probability that the overall defective rate is still at 1percent if in fact, exactly two of the five are defective in this sample.

  Illustrate what will the demand level be for mark sailboat

based on this information and the multiplicative seasonal model, illustrate what will the demand level be for mark's sailboats in the spring of 2011

  Case problem a make-or-buy analysis

Develop a report for management of Wagner Fabricating - What savings are associated with your recommendation as compared with the other alternative?

  Formulate a linear programming model

a company produces two products that are processed on two assembly lines. Assembly line 1 has 100 available hours, and assembly line 2 has 42 available hours

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd