Mean and standard deviation

Assignment Help Basic Statistics
Reference no: EM1312204

A sample of 10 high school students completed a course designed to increase SAT scores. Test scores (sum of X) = 5846  (sum of X squared) = 3428148

A) Mean and standard deviation are 584.6 and 34.28

B) What scores mark the cutoff for the most deviant 10%

C) In the past the average score was 542 can we conclude that there was a significant difference in the new test. We have to write a statistical statement and an English one.

D) If a student scored a 500 what would his percentile rank be?

Reference no: EM1312204

Questions Cloud

Marketplace price dropped : Elucidate how much profit will it earn at that output rate. If the marketplace price dropped to $10, illustrate what should the firm do.
Marginal cost-profits and graph equilibrium : Draw a diagram showing the current situation of the firm. In addition to the above information, suppose the price of the output is $13/unit, if the firm wants to maximize its profit, what should it do? Explain in detail with the aid of a diagram.
Estimating sample size for population mean : We want to estimate the population mean within 5, with a 99% confidence level. The population std dev is estimated to be 15.  How large is the required sample size?
Income tax is unfair to those who work hard : The income tax is unfair to those who work hard to earn their incomes  is an example of positive economic analysis.
Mean and standard deviation : Mean and standard deviation are 584.6 and 34.28
Hypothesis test for difference in mean processing time : In past, mean processing time was 45 days.  At 0.05 level of significance, is there evidence that mean processing time has changed from 45 days?
Significance of neurotransmitters in neurotransmission : Discussing the significance of the neurotransmitters within the neurotransmission. Describing a relationship between the dietary fat intake and related health concerns.
Determining multiple cash flows for a year : Determining multiple cash flows for a year and Present value of $1000 annuity when R=6 3/8% compounded annually and t=3
Questions in capital budgeting : Multiple choices in capital budgeting - Coffer Co. is analyzing two projects for the future.Assume that only one project can be selected.

Reviews

Write a Review

Basic Statistics Questions & Answers

  Explain the trend in the export of fish

Draw two pie charts, which allow the total yearly exports to be compared. Explain the trend in the export of fish as shown in the two pie charts.

  Frequency polygon concept

A frequency polygon: does not depend on one variable. True-False

  World record time in the marathon

The world record time (in minutes) in the marathon is plotted versus the year in which the record was set for men and women separately. The plotting symbol o is used for men and x for women. The data include only records set between 1908 and 1988.

  Produce a new confidence interval

Which of the following would produce a new confidence interval with smaller width based on these same data and produce a new confidence interval

  The bootstrap method of inference relies on

A permutation resample for a two-sample test

  Designing a linear programming problem

Design a Linear programming problem for the flair Furniture Company and find the combination of tables and chairs that the company must produce to maximize profits.

  Standard deviation for this suv model

What is the city mileage standard deviation for this SUV model?

  Estimating the mean-median and mode values

What is the arithmetic mean selling price?

  Difference between the t and z distributions

The correct set of hypotheses to test the effect of the bonus plan, the difference between the t and z distributions

  Probability based on binomial distribution

Let X be the number of yes votes obtained from a random sample of 200 out of the entire voting population. What is the expected value of X if, in fact, 65% of all voters supported the dictator?

  Time plot of the values of variable

Consider the following time plot of the values of variable Y for each month of a 60-month period.  This plot displays

  Sample variance and sample standard deviation

Compute the sample variance and sample standard deviation as a measure of volatility of monthly total return for Chevron (to 2 decimals): Sample variance and Sample standard deviation.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd