Manufactures two electrical products

Assignment Help Operation Management
Reference no: EM13844307

The Attaran Corporation manufactures two electrical products: portable air conditioners and portable heaters. The assembly process for each is similar in that both require a certain amount of wiring and drilling. Each air conditioner takes 3 hours of wiring and 2 hours of drilling. Each heater must go through 2 hours of wiring and 1 hour of drilling. During the next production period, 240 hours of wiring time are available and up to 130 hours of drilling time may be used. Each air conditioner sold yields a profit of $15. Each heater assembled may be sold for a $11 profit. I need to know the optimum solution for x and y.

Reference no: EM13844307

Questions Cloud

What is this investment currently worth : A certain investment will pay $10,000 in 20 years. If the annual return on comparable investments is 8%, what is this investment currently worth? Show your work.
Calculate the appropriate descriptive statistics : Use the IBM APA software to calculate the appropriate descriptive statistics for the variables in your assigned data
Does changing to integrated marketing communications : Does changing to integrated marketing communications (IMC) require organizational structure changes? If not, why? If so, how?
Consider a discount bond with a face value : Consider a discount bond with a face value of $500 and a maturity date of January 1, 2019.a.  Suppose that on January 1, 2016, when the market's (nominal) yield to maturity is 6.0 percent per year, you buy the bond at price P1. What will P1 be?
Manufactures two electrical products : The Attaran Corporation manufactures two electrical products: portable air conditioners and portable heaters. The assembly process for each is similar in that both require a certain amount of wiring and drilling. Each air conditioner takes 3 hours of..
The broad definition of computer crime can be described : According to the text, the broad definition of computer crime can be described
Weighed simple random sample of porter-house steaks : Weights of Steaks A student of the author weighed a simple random sample of Porter-house steaks, and the results (in ounces) are listed below. The steaks are supposed to be 21 oz because they are listed on the menu as weighing 20 ounces, and they los..
Determine whether king is better off or is gross correct : Howard Gross, chief accountant, cautions Dan, however. Gross says that since King changed its method of inventory valuation, there is a consistency problem and it is difficult to determine whether King is better off. Is Gross correct? Why or why n..
Decentralized system in supply chain network design : What are the advantages and disadvantages between centralized and decentralized system in supply chain network design?

Reviews

Write a Review

Operation Management Questions & Answers

  Provides mechanism for project planning and control

Explain how activities, precedence relations, and task times relate to an analytic framework that provides a mechanism for project planning and control.

  What is the optimal solution

Define the decision variables and write the linear program appropriate for maximizing monthly profit contribution. What is the optimal solution?

  What is the annual cost of ordering and carrying tea

How many cases should be ordered at a time? How often will tea be ordered? What is the annual cost of ordering and carrying tea?

  Distinguish between utilization and efficiency

What are the four special considerations for a good capacity decision? Distinguish between utilization and efficiency.

  Why has the joint venture been successful to date

GM entered the Chinese market at a time when demand was very limited. Why? What was the strategic rational?

  Aircraft component project-what is the scope of the project

What is the scope of the project? What does it deliver? Describe how the project tasks and work are organized. What are the weak points with using bar charts for planning this project? It has received an order from an aircraft manufacturer to design ..

  Describe the bottlenecks that may occur in the new process

Identify three TQM tools that may be used for ongoing process improvement. Be sure to describe who will use the tool, when it will be used, and what interval and how it will lead to process improvement.

  Describe an individual''s quest for need satisfaction

According to Maslow's theory of human motivation, why can we describe an individual's quest for need satisfaction as progressive progress

  Find the optimum number of units to be produced

Find the optimum number of units to be produced in one batch (economic production quantity). Round the number to nearest integer.

  Briefly describing snmp and its commands

Write a two-and-a-half-page report briefly describing SNMP and its commands and describing MIB-1/MIB-2, including the hierarchical tree, object identifier (OID), groups, and object types.

  More cost-effective

A designer estimates that she can (a) increase the average time between failures of a part by 5 percent at a cost of $550, or (b) reduce the average repair time by 10 percent at a cost of $100. Which option would be more cost-effective? Currently, th..

  Top three reasons meetings fail-purpose of a meeting

As meetings are visible ways to demonstrate professional competence, it is best to have a reputation of being a(n) In terms of the 4 P's of effective meetings, the purpose of a meeting:  Top three reasons meetings fail: Minutes of a meeting are neces..

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd