Make an mrp for space age furniture company by using the

Assignment Help Operation Management
Reference no: EM13391129

Space Age Furniture Company The Space Age Furniture Company manufactures tables and cabinets to hold microwave ovens and portable televisions. These products are made in various sizes and with various features, but all follow basically the same production and assembly operations. However, two of these products-the Saturn microwave stand and the Gemini TV stand-have a part (no. 3079) that requires machining on a special lathe used only for making that part. At present the machine is run by Ed Szewczak, a machinist who also operates other machines in Space Age's shop. Once set up and started, the lathe can run nearly unattended. How- ever, the machinist must be present (even if not actually attending the machine) any time one of the machines, including the lathe, is in operation. At present, Ed works a regular 40-hour week. However, due to the workload for producing part 3079, it has been neces- sary to schedule frequent overtime for him in order to finish the necessary parts on time.

Coral Snodgrass, operations manager for Space Age, has just heard from Ed's foremen that Ed is becoming unhappy about so much overtime. As Coral knows, Ed has been with the company a long time and is an excellent, reliable employee. Skilled machinists with Ed's experience and employment record are extremely difficult to find. Coral wonders what can be done to alleviate this problem.

Recently, Space Age began using an MRP system that has helped reduce inventories greatly and improve on-time deliveries. In fact, Space Age carries no finished-goods inventory. Instead, everything in the master schedule is being produced for customer orders, so all products are shipped almost immediately. Previously Space Age had estimated that it cost $1.25 per week to store each Gemini and $1.50 per week to store each Saturn that wasn't shipped immediately. The master schedule for producing these two items for the next six weeks is shown below.

Master Schedule

Week      1        2         3        4           5          6

Gemini    600    400     700     500     400     600

Saturn      300    400     400    600      300     300

The part in question, 3079, is used in two different subassemblies: no. 435, which is used in the Gemini TV stand, and no. 257, which is used in the Saturn microwave stand. One of part 3079 is used in each subassembly, and one of each subassembly is used in each of the final products.

Part 3079 may be produced in any quantity since the lathe that makes it is not used for anything else. However, both of the subassemblies are produced using the same equip- ment. To minimize change over time, Space Age has decided that these subassemblies should be made in minimum quantities of 1,000 at a time, although there is no problem with capacity on the equipment that makes them. In fact, an order for 1,000 of subassem- bly 435 is due to be received in week 1, as is an order for 1,000 of subassembly 257. Lead time for both these subassemblies is one week, and no inventory is expected to be on hand for either part at the beginning of week 1. There is not any on-hand inventory of part 3079, and there are no orders in process.

Ed Szewczak earns $22 per hour and gets a 50% premium for any overtime work. When- ever part 3079 is made, there is no set-up time, but processing takes 0.03 hour per unit. It costs $0.25 per week to hold any of these parts over from one week to the next. The cost of holding each subassembly in inventory is $0.75 per unit per week

Respond to the following and include any Materials Requirement Planning (MRP) calculations:

  1. Develop an MRP for Space Age Furniture Company using the information in the case including the production of sub-assemblies in lot sizes of 1,000.
  2. The lot size of 1,000 for sub-assemblies has produced a lumpy demand for part 3079. Suggest ways for improvements over sub-assemblies in lot sizes of 1,000.
  3. Analyze the trade-off between overtime costs and inventory costs.
  4. Calculate a new MRP that improves the base MRP.
  5. Compare and contrast the types of production processing-job shop, batch, repetitive, or continuous-and determine which the primary mode of operation is and why.
  6. Describe ways that management can keep track of job status and location during production.
  7. Recommend any changes that might be beneficial to the company and/or add value for the customer.

Reference no: EM13391129

Questions Cloud

Find profit-maximizing price and quantity if seller sells : the individual demand for a slice of pizza is given by qd 6 - p. assume the marginal cost of a slice of pizza is
How is it that people working in their own self-interest : 1 john writes a memo to his employees. putting his thoughts onto paper is an example ofa.nbspnbsp
Determine the supply chain for your prospective : based on the organization you selected write an operational plan of 300-500 words that addresses the following
Estimate what would happen to volume of services and : you are the administrator for a medical practice. assume all of your practices patients are covered by insurance.
Make an mrp for space age furniture company by using the : space age furniture company the space age furniture company manufactures tables and cabinets to hold microwave ovens
How does n the number of firms in the market affect each : consider a monopolistically competitive market with n firms. each firms business opportunities are described by the
Company x is considering changing its capital structure in : company x is considering changing its capital structure in light of the tough business environment. currently company
The company operates deep mines as well as strip mines most : the company operates deep mines as well as strip mines. most of the coal mined is sold under contract with excess
Complete the table and find out the most efficient number : nbspthe time has come for you to go to college and move from your parents home. you are moving approximately 300 boxes

Reviews

Write a Review

Operation Management Questions & Answers

  What must be the map coordinates of the new factory graph

a manufacturer of oak barrels has factories in an area at the location coordinates provided in the following table.

  Impact the organization and bring human resources

Is your supervisor correct in stating that reengineering the service processes can in fact impact the organization and bring human resources more in tune with the needs of the organization and its varying customers' needs?

  Assuming marginal cost of managing an additional supplier

Assuming marginal cost of managing an additional supplier is $15,000 per year how many suppliers should Witt use? Assume there are up to (3) nearly identical suppliers nearby.

  Provide an example of a product or service that flows

provide an example of a product or service that flows through this relationship. Break down the product or service through each sector.

  Discuss the differences between utilization and efficiency

Discuss the differences between utilization and efficiency as measures of system performance. Which (if any) is the most useful measure for an operations manager? Why?

  What strategies does a company need to develop

What strategies does a company need to develop to become a broad differentiator? In what ways does this provide the company with a competitive advantage over cost leaders? Over differentiators?

  Illustrate what are your retailer profits for each stock

Illustrate what are your retailer profits for each stock level. Supplier profits for each stock level. Supply chain total for each stock level. Fill rates for each stock level.

  What are the potential ethical and conflict of interest

What are the potential ethical and conflict of interest issues arising from CEO involvement in the selection of board members? How can these issues be addressed?

  Analyze and compare and contrast the code of ethics

Analyze and compare and contrast the code of ethics of both Starbuck's and McDonald's. List three aspects that you like least about (1) the Starbuck's statement and (2) the McDonald's statement.

  Design for manufacturing and assembly delivers product

1 design for manufacturing and assembly delivers product improvements by emphasizing which of the followingbull

  Discuss the steps in the selection process for new employees

Discuss the steps in the selection process for new employees. Evaluate why some potential employees are likely to be put through all the steps

  Crosby states that the zero defects concept

Crosby states that the ‘zero defects' concept is widely misunderstood and resisted. Explain the zero defects concept.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd