Reference no: EM132264749
You are a manufacturing engineer for the Megatronics Manufacturing Company and you must design a transfer line.
To make a certain metal part, called an axle pin, you must do four machining operations, called A, B, C, and D, in the order indicated. The times required for these operations are 4 minutes, 3 minutes, 6 minutes, and 5 minutes, respectively, and never vary. Megatronics is considering building a transfer line to make axle pins, but they can only use systems that operate at a fixed, common cycle time, even when there are buffers. (Here, by cycle time we mean the time between operations.) This cycle time must be the longest operation time of any of the machines. That is, if you build a four-machine, three buffer line, the cycle time would have to be 6 minutes, and machines A, B, and D would be idle 2 minutes, 3 minutes, and 1 minute each cycle, respectively.
Reliability: Machines have operation-dependent failures. Assume that the mean time between failures for each operation A, B, C, D is 5 hours of working time, and that the mean repair time is 1 hour.
Inventory cost: Assume a cost of $1000 for each part in a buffer. Assume that all buffers have size 3 or greater.
Demand: Parts must be produced at a long range average rate of 7 parts per hour.
Strategic alliance-whirlpool corporation and inland steel
: Faced with intense competition, increasing expectations from customers, reduced product life cycles, and localized geographic markets,
|
Social media marketing is most associated with
: Social media marketing is most associated with _____. All of the following except _____ are collected on content websites.
|
How should advertising and imc effectiveness be measured
: How should advertising and IMC effectiveness be measured? Why?
|
The research study on factors of employee retention
: What are the data analysis in the research study on Factors of Employee Retention?
|
Machines have operation-dependent failures
: Machines have operation-dependent failures. Assume that the mean time between failures for each operation A, B, C, D is 5 hours of working time,
|
Senior executives facilitated by an industrial psychologist
: Would you develop a spreadsheet? Would you organize a weekend retreat for senior executives facilitated by an industrial psychologist?
|
Successful career as sales rep for national computer systems
: Shirley, successful career as a sales rep for National Computer Systems suddenly changed. She almost felt as though she had committed a crime in having a child.
|
Occur within the international business environment
: In your own words, share an example of an ethical dilemma that can occur within the international business environment.
|
Should court rule for or against homeowners association
: Mrs. Cunningham ran a licensed day-care center in her private home, Should the court rule for or against the homeowners association? Why?
|