Hawkins Manufacturing Company produces connecting rods for 4 and 6 cylinder automobile engines using the same production line. The cost required to set up the production line to produce the 4 cylinder roads is $2000, and the cost required to set up the production line for the 6 cylinder connecting rods is $3500. Manufacturing costs are $15 for each 4-cylinder connecting rod and $18 for each 6-cylinder connecting rod. Hawkins makes a decision at the end of each week as to which product will be manufactured the following week. If there is a production changeover from one week to the next, the weekend is used to reconfigure the production line. Once the line has been set up, the weekly production capacities are 6000 6-cylinder connecting rods and 8000 4- cylinder connecting rods. Let x4 = the number of 4 cylinder connecting roads produced next week x6 = the number of 6 cylinder connecting roads produced next week s4 = 1 if the production line is set up to produce the 4 cylinder connecting rods; 0 if otherwise s6 = 1 if the production line is set up to produce the 6 cylinder connecting rods; 0 if otherwise
a- Using the decision variables x4 and s4, write a constraint that limits next week’s production of the 4 cylinder connecting rods to either 0 or 8000 units.
b- Using the decision variables x6 and s6, write a constraint that limits next week’s production of the 6 cylinder connecting rods to either 0 or 6000 units.
c- Write 3 constraints that, taken together, limit the production of connecting rods for next week.
d- Write an objective function for minimizing the cost of production for next week
Discuss the pros and cons of CPM scheduling. In your response discuss how to maximize the pros of CPM scheduling and how to minimize the cons of CPM scheduling. Provide an example of a pro for CPM scheduling and a con for CPM scheduling.
The group laughs at Tom's joke, and Celia doesn't add any more input into the logo discussion. Which type of power has Tom used over Celia?
Luedtke worked on oil drilling rigs on Alaska’s North Slope. His employer required employees to take a drug test during their next week of “R&R” after their names appeared on a list. Luedtke refused to take the test, and he was fired. Can employees b..
Contrast a mechanistic and organic organization giving an example of each. What would a bureaucracy be more like, mechanistic or organic? Why?
In the past few years, the traffic problems in Lynn McKell's hometown have gotten worse. Now, Broad Street is congested about half the time. The normal travel time to work for Lynn is only 15 minutes when Broad Street is used and there is no congesti..
Continuous Quality Improvement (CQI) is a management philosophy and a management method. Identify and explain the philosophical and methodological characteristics of CQI. Select the characteristic you find most valuable and explain why.
As the work of your risk management team (from the first discussion question) continues, the discussion of your team's risk management plan outline moves on and considers the following questions: How should the risks be prioritized? Who should do the..
Distinguish between pure risk and speculative risk. List and explain in detail the three kinds of pure risk. Explain the concept of Enterprise Risk Management. How does it differ with the holistic risk management approach? Why did the Harvard Busines..
Polar containers make high-end coolers for camping. The total task time needed to make a cooler is 360 seconds, with the longest individual task taking 50 seconds. Polar containers would like to set up a line capable of producing 50 coolers per 8-hou..
Determine two constraint equations for this LP problem, but do not solve! Hint: The number of constraint equations must equal the number of decision variables. Only two are required
What are some examples of hazard control methods that are recommended in hazard prevention and reduction techniques. Do you feel that some of these methods are more important to use than others. Which do you believe reduces the possibility of a fu..
In some organizations capacityplanning takes place very regularly and in some it takes place seldom. What arethe factors that influence the frequency of capacity planning?
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd