Investigation of corrosion in steel general purpose cement

Assignment Help Other Engineering
Reference no: EM131175573 , Length: word count:2000

Investigation of corrosion in steel General purpose cement. Why we investigating it, Induce a certain crack and observe what may happen?

Fly Ash

It is a by-product of coal combustion in power stations. It also provide environmental advantages. Overall performance and quality of concrete. It affects the plastic properties of concrete by improving workability, reducing water demand, controlling bleeding, and lowering heat of hydration. Fly ash increases strength development at later ages, reduces corrosion of reinforcing steel, and generally improves resistance to chemical attack and mobility through a reduction in permeability.

Grade 1 Fly Ash

It is a supplementary cementitiious material that delivers improved later-age strength, workability and enhances the durability properties of concrete. Commonly used as 20%-30% cement replacement in concrete. Grade 1 Fly ash is used as a single product or may be blended to produce a Fly Ash blended cement. Grade 1 Fly Ash is recommended for use in virtually in conventional concrete applications

Special Grad Ash

Its an Ultra fine high performance fly ash product that both increases the density and reduces the permeability of concrete by providing a filler effect and a reactive cementitious material. It is particularly effective for providing water tightness in higher strength and high durability applications.

Minutes with AdilAbbas( Major Stake holder) (3/05/16)

I am having regular meeting with Adil Abbas who is the major stake holder of this project.  We have discussed few key points during the meeting and they are:

-Look for risk plan

-Look for standards- Australian standards quality and prepare client brief

-Quality management plan

  • Consistency of result-Document work procedure
  • Report parameters
  • Work performed
  • Documents and presentation

-All aspects of the project is free from mistakes

-Australian standard-recovery procedure

-Why Corrosion is a problem?

-Documenting the notes and put it into report as appendix. it has to be part of quality plan organising meeting with Adil, documents it with quality plan

-Risk assessment-making sure I keep an electronic copy. what if i loose the hardcopy? I need to have a backup

-Specification of blended cement-Australian standard

-Australian standard of general purpose cement

-Australian standard of blended cement

Minutes with AdilAbbas( Major Stake holder) (10/05/16)

Concentrated salt solution.

Normal concrete.

add fly ash to cement

after 7 days keep them for 14 days, put them into salt solution and check how much is it corroded?

Research on slag

Work on risk register

Work on quality management plan

Work on Australian standard- method of testing corrosion

Minutes with AdilAbbas( Major Stake holder) (17/05/16)

Find out how much cement, water, how much concrete.

Slum, water cement ratio

Go to companies and find out.

Experiment1 beam with normal cement

Another 1 partly replace slag and lime

Prepare concrete cylinder..

look for method for testing compressive strength for concrete.

Blended cement composition. Australian standard will tell composition of slag material which you add that will help determining the mix proportion

Decide how much material do I need?

Prepare at least  3 compositions

  • Plane
  • Limestone and slag
  • cement and slag.

What slum you want. It is important to determine the water cement ratio?

What mix proportion do I need

Minutes with AdilAbbas( Major Stake holder) (01/06/16)

I had a brief discussion regarding the experiment that I have to carry out. Adil Abbas has asked me to go to library and suggested me to look for the Australian standard website in order to find the standards. I was asked by Adil to work on water cement ratio, compression test.

With the water cement ratio he has given me 3 types. 1st one is water cement ratio of 0.40. 2nd one is water cement ratio of 0.50 and the 3rd one is 0.60.

I was told by Adil that the water cement ratio for casting slump would be 80 to 100mm, if in any case I can't get it then I have to use chemical plasticizer.

2000 words + diagrams and calculations.

Assignment link - https://www.dropbox.com/s/pewqshz7oylv26w/Assignment.rar?dl=0.

Reference no: EM131175573

Questions Cloud

Explore a recent or emerging form of technology : Provide an introduction that defines both technology and social change, and discusses how they are related. Discuss the impact of the personal computer, cellular phones, and the Internet on society.
Find the rate of change of total revenue : (Continuation of previous exercise) Suppose that the average price of a VCR during the same time period was governed by the rule p = 820 - 50t.
Journalize the october transactions : Fire Out Company manufactures its product, Vitadrink, through two manufacturing processes: Mixing and Packaging. All materials are entered at the beginning of each process. Journalize the October transactions.
Describe two of the functional roles of the human resources : Identify HRM's role and the human resources department's role in the health care industry. Consider the major differences between these two functions. Describe two of the functional roles of the human resources department in detail.
Investigation of corrosion in steel general purpose cement : Investigation of corrosion in steel General purpose cement. Why we investigating it, Induce a certain crack and observe what may happen
Analyze the past three years of the selected financial ratio : Analyze the past three years of the selected financial ratios for the company; you may obtain this information from the company's financial statements.
Are there specific treatments available for disorders : What are some of the psychological conditions that are affected by the sympathetic nervous system? Are there specific treatments available for disorders that affect the sympathetic nervous system? Are these treatments ethical in nature? How so? ..
Find the rate of change of each side : The perimeter of a rectangle is growing at the rate of 12 m/sec. Its diagonal is growing at the rate of 4 m/sec. At a certain time one side is 4 m long and the other side is 3 m long. Find the rate of change of each side. Are they growing or shrin..
Find the relationship between the rates of change of x and y : An alternative way to do implicit differentiation is to introduce a mythical extra variable t.

Reviews

Write a Review

Other Engineering Questions & Answers

  Characterization technology for nanomaterials

Calculate the reciprocal lattice of the body-centred cubic and Show that the reciprocal of the face-centred cubic (fcc) structure is itself a bcc structure.

  Calculate the gasoline savings

How much gasoline do vehicles with the following fuel efficiencies consume in one year? Calculate the gasoline savings, in gallons per year, created by the following two options. Show all your work, and draw boxes around your answers.

  Design and modelling of adsorption chromatography

Design and modelling of adsorption chromatography based on isotherm data

  Application of mechatronics engineering

Write an essay on Application of Mechatronics Engineering

  Growth chracteristics of the organism

To examine the relationship between fermenter design and operating conditions, oxygen transfer capability and microbial growth.

  Block diagram, system performance and responses

Questions based on Block Diagram, System Performance and Responses.

  Explain the difference in a technical performance measure

good understanding of Mil-Std-499 and Mil-Std-499A

  Electrode impedances

How did this procedure affect the signal observed from the electrode and the electrode impedances?

  Write a report on environmental companies

Write a report on environmental companies

  Scanning electron microscopy

Prepare a schematic diagram below of the major parts of the SEM

  Design a pumping and piping system

creating the pumping and piping system to supply cool water to the condenser

  A repulsive potential energy should be a positive one

Using the data provided on the webvista site in the file marked vdw.txt, try to develop a mathematical equation for the vdW potential we discussed in class, U(x), that best fits the data

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd