Illustrate what would happen to during put of the line

Assignment Help Operation Management
Reference no: EM1373905

Q. This line consists of single-machine stations and is almost balanced (i.e., station rates are nearly equal). A manufacturing engineer has estimated the bottleneck rate to be 2000 cases per 16-hour day and the raw process time to be 30 min. . The line has averaged 1,700 cases per day and cycle time has averaged 3.5 hours.

a) Illustrate what is the estimated average WIP level?

b) Explain how does this performance compare to the practical worst case?

c) Illustrate what would happen to during put of the line if we increased the capacity of non-bottleneck station and held the WIP at its current level?

d) Illustrate what would happen to during put of the line if we replaced the large single-machine at the bottleneck station with four smaller machines and held WIP at its current level? (The total capacity of the four smaller machines is equal to the capacity of the larger machine.)

 

Reference no: EM1373905

Questions Cloud

Explain how much more expensive is the next lowest cost : Explain how much more expensive is the next lowest cost option. For the optimal order quantity, illustrate what is the inventory position immediately after an order is placed.
Compute the total cost : ssuming transportation costs are $1 per load per meter, develop a suitable layout that minimizes transportation costs using the given information. Compute the total cost.
Explain how many units should be ordered each time : To minimize total cost, explain how many units should be ordered each time an order is placed. If the holding cost per unit was $6 instead of $5, illustrate what would the optimal order quantity be.
Graphing the supply curve : Think the market for new, single family house in Miami. The general demand function for new housing in Miami is anticipated to be Qd =15 - 2P + 0.05M + 0.10R,
Illustrate what would happen to during put of the line : Illustrate what would happen to during put of the line if we replaced the large single-machine at the bottleneck station with four smaller machines and held WIP at its current level.
Illustrate at what center of gravity coordinates : illustrate at what center of gravity coordinates should the new store be located. Census tracts 103 and 105 are each projected to grow by 20% in the next year. Explain how will this influence the new store's coordinates.
Find the integer solution that will maximize her profit : With the semester almost over, Jan plans on taking a 3-month summer vacation to England and doesn't want to leave any unfinished posters behind. Find the integer solution that will maximize her profit.
Illustrate what is the total cost of this policy : Explain how many tires should Rocky Mountain order each time it places an order. Illustrate what is the total cost of this policy.
Should the company outsource design or do it in-house : A company is deciding if it should do design of a product in-house or outsource the design. If outsourced the cost for a low bidder would be $40,000 and the cost for an expensive bidder $100,000.

Reviews

Write a Review

 

Operation Management Questions & Answers

  Decision-making and decision-making models

What are the risks of bypassing the steps in decision-making model provided? Under what circumstances would it be appropriate or inappropriate to use a decision-making model?

  Decide whether the supply chain represents a low-cost

Decide whether the supply chain represents a low-cost, rapid response or differentiation strategy. Are the supply-chain characteristics significantly different from one product to another.

  Elucidate what vertical integration method would you pursue

Suppose which you decided to use a conventional method going through major retailers such as Best Buy, Sam's Club, etc. Elucidate what vertical integration method would you pursue to minimize channel conflict.

  Describe how many are expected to be sold during the year

The line graph for projected monthly sales at Juan's Records shows a steady increase or 5 albums per month during the year. In January, 100 albums were sold. Describe how many are expected to be sold during the year.

  Computes mad for both amit also barbara method

Suppose which May's figure turns out to be 405. Append the table with error columns then, computes MAD for both Amit's also Barbara's method. (16.11 also 19.17) d) Based on these calculations which method seems more accurate.

  Strategy of sherman anti-trust act

The strategy of the Sherman Anti-Trust Act and other U.S. antimonopoly legislation is to ensure that each company has meaningful competitors in every product market in which it participates.

  Describe what you relied on external or internal sources

describe whether you relied on external or internal sources of information to help you make every decision also whether you think you were more linear or nonlinear in describe how you processed which information.

  Briefly describe dimco''s supply chain

Briefly describe DIMCO's supply chain, What are the advantages that DIMCOO can gain by implementing supply chain management?

  Elucidate what is the economic order quantity

A distributer of large appliances needs to determine the order quantities also reorder points for the various products it carries. Elucidate what is the economic order quantity.

  Which method is least effective for communicating change

A restaurant is faced with the challenge of communicating to its employees a significant change in service also style. Which method is LEAST effective for communicating this change.

  Find out the economic order quantity

The cost to place also process an order from the supplier is $75. The Corporation operates 300 days per year also the lead time to receive an order from the supplier is 2 working days. Find out the economic order quantity.

  Is temperature a suitable level differentiator

The researcher select four different detergents based on several properties also conducted a series of experiments at 3 different water temperatures. Cleanliness was quantified using a construct measure. The code data is shown in the subsequent ta..

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd