Hydrology Assignment - Minor and Major Design Discharges

Assignment Help Other Engineering
Reference no: EM132397242

Hydrology Assignment -

Part A - Subcatchment Storage Routing

Consider a hypothetical subcatchment area of 15 km2 and 1 in 100 AEP, 60 minute design storm data for the subcatchment is provided in Table 2.1 below.

Table 2.1 Design storm data (1 in 100 AEP, 60 minute)

Time period at 6-minute intervals

6-minute rainfall intensity (mm/hour)

1

29.3

2

46.8

3

53.2

4

71.4

5

42.8

6

22.6

7

18.7

8

39.5

9

21.8

10

15.4

The initial and continuing loss (IL-CL) data across Australia is discussed in the ARR 2016 Book 5 - Flood Hydrograph Estimation (Ch 3 Losses). The recommended IL (mm) and CL (mm/hour) value across Australia can be found in Figure 5.3.18 and Figure 5.3.19, respectively in ARR 2016. Consider that the subcatchment is located in Brisbane and the recommended IL is 20 mm and CL is 2 mm/hour. Using the 6-minute rainfall data provided in Table 2.1, catchment area of 15 km2, and the recommended IL = 20 mm and CL = 2 mm/hour, you need to perform the following tasks:

Provide a table (as shown below) showing the 6-minute rainfall depths (mm), cumulative rainfall (mm), IL or CL applies, 6-minute rainfall excess depths (mm) using the recommended IL-CL values and 6-minute rainfall excess intensity (mm/hour).

Time period at 6-minute intervals

6-minute rainfall intensity (mm/hour)

6-minute rainfall depths (mm

Cumulative rainfall (mm)

IL or CL

applies?

6-

minute rainfall excess

depths (mm)

6-minute rainfall excess intensity (mm/hour)

 

 

 

 

 

 

 

Convert the 6-minute rainfall excess hyetograph to a subcatchment instantaneous discharge hydrograph (in m3/s) using Equation 6.1 provided in the Study Book (section 6.3.2, page 14). You need to provide:

A table showing the 6-minute rainfall excess intensity (mm/h) and subcatchment instantaneous discharge (m3/s), and
A figure showing the rainfall excess hyetograph (time step vs rainfall depth ) and the instantaneous hydrograph (time step vs discharge).

Perform a subcatchment storage routing using Equations 6.2 - 6.8 provided in the Study Book (section 6.3.3, pages 16-18). You may assume that at the beginning of storm (time is zero) both storage and subcatchment outlet discharge are zero. You need to provide:

A look-up table showing the relation between discharge (Q in m3/s), storage (S in m3) and [2S/Δt + Q] in m3/s,
A table showing your subcatchment routing estimation as shown in Table 6.7 (Study Book),
A figure showing the inflow (instantaneous) and subcatchment outlet hydrographs, and
Report the attenuation (reduction of peak in m3/s) and translation (lag in time unit).

Part B - Minor and Major Design Discharges

Proposed residential subdivision

A drainage scheme is to be designed for a residential area located in Mackay, Queensland. A schematic subdivision layout plan is shown in Figure 3.1. The reduced levels (elevation) at different points in the subdivision are shown in Table 3.1. The subdivision includes six lots (A, B, C, D, E and F) as shown in Figure 3.1. After development, the fraction impervious of the lots will be 0.3. A 10 m wide new road will be constructed in a 20 m wide road reserve. The road crossfall is 1:40 [vertical 1, horizontal 40] two-way. The road will have a 200 mm high vertical kerb and a 0.45 m wide gutter having a crossfall of 1:10. The drainage scheme includes six on-grade Pits (1 to 6) as shown in Figure 3.1. Pits and their catchments are provided in Table 2.2.

Your task is to prepare a Minor system design check of the stormwater system upstream and including Pit 4 (Pits 1 to 4) based on the preliminary layout shown in Figure 3.1 and then a Major flood hazard check in the road just downstream of Pit 4. The Minor system is to cater for the 2 year ARI (50% AEP) storm and the Major system for the 100 year ARI (1% AEP) storm. The system includes drainage pipes (Pipe 1-2, Pipe 2-4, Pipe 3-4, Pipe 4-6 and Pipe 5-6).

809_Preliminary layout of stormwater drainage system .jpg

Figure 3.1: Preliminary layout of stormwater drainage system in a residential subdivision Table 3.1: Reduced levels at different points in the subdivision

Table 3.2 Catchment areas for Pits within the subdivision

Location

Reduced Level (m Local Datum)

Lot B/south-east corner

53

Lot B/north-west corner

50

Pit 2 surface level

49.5

Lot D/ south-east corner

51

Lot D / north-west corner

48

Pit 4 surface level

47.6

Lot F / south-east corner

47

Lot F / north-west corner

45

Pit 6 surface level

44.6

Lot A / south-west corner

52

Lot A / north-east corner

50

Pit 1 surface level

49.6

Lot C / south-west corner

50.5

Lot C / north-east corner

47.8

Pit 3 surface level

47.7

Lot E / south-west corner

48.2

Lot E / north-east corner

45.5

Pit 5 surface level

45

Table 3.2 Catchment areas for Pits within the subdivision

Pit

Contributing area

Pit 1

Lot A

Half width of road adjacent to Lot A (south end to Pit 1)

Pit 2

Lot B

Half width of road adjacent to Lot B (south end to Pit 2)

Pit 3

Lot C

Half width of road adjacent to Lot C (Pit 1 to Pit 3)

Pit 4

Lot D

Half width of road adjacent to Lot D (Pit 2 to Pit 4)

Pit 5

Lot E

Half width of road adjacent to Lot E (Pit 3 to Pit 5)

Pit 6

Lot F

Half width of road adjacent to Lot F (Pit 4 to Pit 6)

Part C - Feasibility Study of a Proposed Water Supply Dam (Yield Analysis)

In order to augment the water supply in the Toowoomba region, a proposal has been submitted to construct a dam [10 m height, 20 m long and holds 100 ML of water when full] on the Gowrie Creek at Cranley [site number 422326A]. When full, surface area of the reservoir is 500 m2. A preliminary feasibility study is required to justify this plan. Therefore, you are requested to perform a daily yield analysis for the year 2017 (365 days). As a preliminary feasibility study, you are requested to estimate a constant daily water demand (in ML/day) that can be diverted (or extracted) from the reservoir with a reliability of 80%.

You can download the Gowrie creek at Cranley (422326A ) daily streamflow volume (megalitre/day) from the water monitoring portal.

Consider the BOM rainfall station 041529 (Toowoomba Airport QLD) for this preliminary yield analysis. You can download the daily rainfall data from.

The average pan evaporation data is provided below in Table 4.1. You can consider a constant daily evaporation rate for all the days in a month. A pan coefficient of 0.8 is applicable.

Table 4.1: Pan Evaporation data (mm/day)

Month

Pan Evaporation (mm/day)

Jan

6.7

Feb

5.8

Mar

5.0

Apr

4.0

May

2.7

Jun

2.2

July

1.7

Aug

3.7

Sep

5.0

Oct

5.8

Nov

7.0

Dec

7.3

On 31st December 2016, storage volume in the dam was 27 ML.

Ignore seepage losses for this preliminary feasibility study.

Neglect the change in surface area with storage height/volume and you may consider a constant surface area of 500 m2 for all the cases in this preliminary assessment.

Table 8.5 in the Study Desk (Mod 8 Table 8.5 in the ENV3105StudyResources.xlsx) can be used to solve this yield analysis

Apply the trial and error method to estimate the diverted water (demand) at 80% reliability.

Attachment:- Hydrology Assignment File.rar

Reference no: EM132397242

Questions Cloud

Create a mini-monograph for ketoprofen drug : Create a mini-monograph for Ketoprofen drug. A drug monograph is a summary about the clinical aspects of a drug or pharmaceutical agent.
MRE5003 Industrial Techniques in Maintenance Management : MRE5003 Industrial Techniques in Maintenance Management Assignment Help and Solution, Federation University Australia. Discuss leadership and management
Do you know anything about the design of the organization : Think back to an experience you have had with poor customer service from an organization. Whom did you blame for it? Do you know anything about the design.
Evaluate the potential response and compliance of the client : Identify which drugs and devices medical equipment you would furnish/prescribe pursuant to standardized procedures and in conformance with applicable laws.
Hydrology Assignment - Minor and Major Design Discharges : Hydrology Assignment - Part B - Minor and Major Design Discharges. Prepare a Minor system design check of the stormwater system upstream
PUBH6013 Qualitative Research Methods for Public Health : PUBH6013 Qualitative Research Methods for Public Health Assignment Help and Solutions, Laureate International Universities, Australia
Strategic Management Assignment Problem : Strategic Management Assignment - Essay Topic - Individual Authentic Research Portfolio. Identify an Agribusiness operating in Australia
Address concerns with visual presentation : Management has asked you to address concerns with a visual presentation. Description of iterative maintenance effort, including audits and frequency
Name three of COBITs six control objectives : Name three of COBIT's six control objectives. Describe three of the COBIT P09.1 IT Risk Management Framework control objectives.

Reviews

Write a Review

Other Engineering Questions & Answers

  Characterization technology for nanomaterials

Calculate the reciprocal lattice of the body-centred cubic and Show that the reciprocal of the face-centred cubic (fcc) structure is itself a bcc structure.

  Calculate the gasoline savings

How much gasoline do vehicles with the following fuel efficiencies consume in one year? Calculate the gasoline savings, in gallons per year, created by the following two options. Show all your work, and draw boxes around your answers.

  Design and modelling of adsorption chromatography

Design and modelling of adsorption chromatography based on isotherm data

  Application of mechatronics engineering

Write an essay on Application of Mechatronics Engineering

  Growth chracteristics of the organism

To examine the relationship between fermenter design and operating conditions, oxygen transfer capability and microbial growth.

  Block diagram, system performance and responses

Questions based on Block Diagram, System Performance and Responses.

  Explain the difference in a technical performance measure

good understanding of Mil-Std-499 and Mil-Std-499A

  Electrode impedances

How did this procedure affect the signal observed from the electrode and the electrode impedances?

  Write a report on environmental companies

Write a report on environmental companies

  Scanning electron microscopy

Prepare a schematic diagram below of the major parts of the SEM

  Design a pumping and piping system

creating the pumping and piping system to supply cool water to the condenser

  A repulsive potential energy should be a positive one

Using the data provided on the webvista site in the file marked vdw.txt, try to develop a mathematical equation for the vdW potential we discussed in class, U(x), that best fits the data

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd