The White River in Vermont (USA) has a rectangular channel cross-section with a Manning coefficient is n = 0.040 and the downstream bed slope is S = 5.0 × 10-5. In the summer, the width of the river and the center water depth are, respectively, 9.8 m and 1.2 m.
a) In that season, what are the hydraulic radius of the river, its mean velocity and volumetric discharge?
A single bay car wash with a Poisson arrival rate and an exponential service time has cars arriving an average of 10 minutes apart, and an average service time of four minutes.
May disinherit his son for any reason as long as Joel indicates in the will which the son was omitted on purpose. May disinherit his son only if Joel leaves the son a nominal amount, such as $1.
Two simple pendulums have length of 81-cm and 64-cm they are released from the same angular position at the same instant. After how much time would they both arrive at their initial position simultaneously.
How to calculate the principle of shoring system in formwork analysis when the secondly floor upper has been poured?
Customers arrive at a suburban ticket outlet at the rate of 14 per hour on Monday mornings. This can be described by a Poisson distribution.
What can you tell me about the direction, strength and significance of this association and What would you expect for somebody without any formal education whatsoever and what can you tell me about the nature of this relationship?
In this situation, you sampled gene pool without replacing beads in the beaker after you drew each one.
The average service time at each service desk is 216 seconds per consumer following the exponential service distribution.a) Explain how many consumers, on average, are waiting in line in front of each service desk?
A 9.8-kg object oscillates at the end of a vertical spring that has the spring constant of 1.75 104 N/m. The effect of air resistance is represented by the damping coefficient b = 3.00 N•s/m.
The block is acted by its weight W=200 lb, a horizontal force Q=600 lb, and the pressure P exerted by the inclined plane. The resultant R of these forces is up and parallel to the inclined thereby sliding the block up it. Determine P and R.
To remove a nail, a small block of wood is placed under a crowbar, and a horizontal force P is applied as shown. Knowing that the maximum vertical force needed to extract the nail is 2600 N and that the horizontal force P is not to exceed 290 N, d..
Identical bricks 0.1m wide, and weighting 2kg are placed on a plate (assume the plate has neligible weight). Calculate the total weight (and force F required to balance the plate).
A three-span continuous beam ABCD with three equal spans supports a uniform load with intensity q. Determine all reactions of this beam and draw the shear force and bending moment diagrams labelling all critical ordinates.
Determine the required height h of the roller coaster so that when it is essentially at rest at the crest of the hill it will reach a speed v= 100km/hr when it comes to the bottom.
This material is related Geotechnical Engineering, please only answer if you are certain and sure of your answer. An undisturbed soil sample has a dry unit weight of 112 pcf with a specific gravity of solids equals to 2.68.
Assume you are observing traffic in a single lane of a highway at a specific location. you measure the average headway and average spacing of passing vehicles as 3 seconds and 150 ft, respectively. calculate the flow, average speed, and density of..
Knowing that at t= 3s slider block C has moved 57 mm to the right, Determine the velocity of slider block C at t=0, (b) the acceleration of A and C, (c) the change in position of block A after 5s.
If they plan to increase their savings by 5% each year, how much must they invest in the first year given that they expect to earn 4% per year on their investment?
The volume of fill required is 2500 cubic meters. Find the volume of soil that must be excavated from the borrow pit to furnish the required volume of fill. (in cubic meters).
Create a MATLAB program and flowchart which will allow the user to input an unknown number of temperatures, each of which might be a temperature in Celsius, Fahrenheit, Kelvin, or Rankine, and will convert the user input temperature to each of the..
For satisfactory operation, the static pressure at the pump inlet must not be lower than -6 m of water gage. Determine the smallest standard commercial pipe that will give the required performance.
Could all the people in china hold back the water behind the three gorges dam?
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: info@expertsmind.com
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd