Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
An equal tangent vertical curve is to be constructed between grades of -3.0% (initial) and 1.0% (final). The PVI is at station 110+00 and elevation 420 ft. Due to a street crossing the roadway, the elevation of the roadway at station 112+00 must be at 424.5 ft. Design the curve
If direct runoff hydrgraph derived from a unit hydrograph of a catchment (drainage area = 50 acre) is 120 acre-ft, back calculate the rainfall amount. Assume total abstraction in the area is 50%.
what is the engineering ethics case related to civil engineering with reference and discuss all the engineering ethics issues which covered the "Engineering etics concepte and cases?
Evaluate company performance in relation to GRI standards and comment on Stigler's theory.
The vertical velocity of the box at the time that it hits the surface is v= 5m/s. After impact the camera experiences an acceleration of a = -kx, where k is a constant and x is the compression of the packing material.
The rigid bar of negligible weight is supported as shown. Find the stress in each rod if the temperature rises DeltaT after a load P is applied. Use the following data: area of steal rod 320mm2, bronze rod 1300mm2, thermal expansion coefficient Al..
Determine the settlements when a stress of 100 kPa is applied by the building over an area of 10m × 5 m on the soil surface.
Normal load at failure was 93.8N with a maximum shear load of 38.7N. Find stresses on the failure plane, sketch a graph showing these on the shear stress and normal stress axes. Find the friction angle and shear strength.
If there are 50 vehicles on a 4000-ft highway lane and the average time headway between two adjacent vehicles is 2.2 seconds. A) Calculate traffic density in vehicle/mile (vpm) and average space headway in feet/vehicle (fpv).
A compressible 12-ft clay layer beneath a building is overlain by a stratum of sand and gravel and underlain by impermeable bedrock. The total expected primary consolidation settlement of the compressible clay layer due to the building load is 4.6..
Determine the horizontal reaction that is developed on the gate at C.
North City must choose between two new snow-removal machines. The SuperBlower has a $70,000 first cost, a 20 year life, and an $8000 salvage value. At the end of 9 years , it will need a major overhaul costing $19,000.
An overpass is being built over the PVI of an existing equal tangent sag curve. The sag curve has a 70 mi/h design speed, and G1 = -6%, G2 = +3%.
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd